Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.4 LAccepted-AOC | ₹50.4 L | L1 | Accepted-AOC Contract value of L1 |
| 2 | L2₹58.1 L+₹7.7 L (15.4%)Rejected-Finance | ₹58.1 L+₹7.7 L (15.4%) | L2 | Rejected-Finance L2 bidder |
Tender Value
₹58.4 L
EMD Value
₹50,000
Closing Date
31 Jan 2025, 3:00 pmClosed
Managing Director
KITCO Ltd M M Gardens Church Landing Road Pallimukku Ernakulam
Development of Taluk Hospital Malayinkeezhu MGPS
2025_KITCO_724793_1
HFWD/KITCO/CL/20/2024-25
Open Tender
Miscellaneous Works
Item Rate
90 days
Malayinkeezhu
As per NIT
4 documents required · 4 mandatory
₹2,950
Yes
₹50,000
Yes
25 Jun 2025
9 Jan 2025
3 Feb 2025
9 Jan 2025
31 Jan 2025
14 Jan 2025
9 Jan 2025 - 13 Jan 2025
Amount
Medical Gas Pipeline System
MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM Supply,testing and commissioning of Automatic Oxygen Control Panel with minimum flow rate of 1200 LPM,; Fully complying with ISO 10524- 2, ISO 7396-1:2007/HTM02-01 as per technical specifications. The cylinders shall not be included in the quoted price.
od324182/2023_2024 Supply,testing and commissioning of Oxygen Manifold - 2 banks x8 cylinders, as per technical specifications. The cylinders shall not be included in the quoted price.
od324238/2023_2024 Supply,testing and commissioning of Cylinder Emergency Oxygen Manifold - 1 Bank x4 Cylinders wih high flow regulator, The cylinders shall not be included in the quoted price.
od324254/2023_2024 NITROUS OXIDE SYSTEM: Supply,testing and commissioning of automatic N2O control panel complete set with inlet and outlet connectors for fully automatic control panel for both sides with brass hosing and suitable connectors. ½” BSP (M) thread.
od324255/2023_2024 Supply,testing and commissioning of Nitrous Oxide Manifold - 2 banks x 2 cylinders.as per technical specifications. The cylinders shall not be included in the quoted price.
od324256/2023_2024 Supply,testing and commissioning of Emergency N2O Out let with Convertion Kit (Convertion Kit 2nos)
od324342/2023_2024 CARBON DIOXIDE SYSTEM Supply,testing and commissioning of semi automatic CO2 control panel complete set with inlet and outlet with brass housing and suitable connectors. ½” BSP (M) thread.
od324481/2023_2024 Supply,testing and commissioning of Cylinder CO2 Manifold - 1cylinder x 2 bank with all accessories required as per specification
od326986/2023_2024 Supply,testing and commissioning of Emergency CO2 Out let with Convertion Kit (Convertion Kit 2nos)
od324699/2023_2024 MEDICAL AIR SYSTEM: Supply,testing and commissioning of Compressed air plant complete with - 2 compressors, each compressor should have minimum free air delivery of 750 LPM @8.5 bars, 1 air receiver tank of minimum 1000 ltr capacity, filtration and dryer system to ensure medical air quality as per HTM standards (each compressor module should include an inline filter with particle retention of 10 microns), NRV, pressure reducing station,automatic drain valves,pressure guages,ball valves, electrical control panel including circuit breakers, starters, pressure switches, timers, as per technical specifications.
od324893/2023_2024 VACUUM PLANT: Supply,testing and commissioning of Vacuum plant complete with 1 vacuum pump and one as standby, each vacuum pump should have minimum free air aspirated of 1500 LPM betwen 570 mmHg and 720 mm Hg.min, vaccum receiver tank of minimum 2000 ltr capacity,bacteria double filter, valves,pressure guages,NRV, electrical control panel including circuit breakers, pressure switches, timers, ball valves etc as per technical specifications.
od324918/2023_2024 "Supply,testing and commissioning of Master Plant Alarm Panel ,Complies with HTM 02- 01/ISO 7396-1 Standards. Each Master Alarm should be modular in design and be fitted with required number of master alarm modules. The master alarms should be capable to monitor minimum 25 point. Each point represents an alarm condition that the source equipment might have. When an alarm condition exists, a red-light flashes and the audible alarm sounds. If several alarm conditions occur simultaneously, the most recent alarm light should flash, while the other alarm lights should remain lit. When an alarm condition is generated, an audible alarm should be actuated. A dry contact module should be available to interface with a building management system. The box material should be of gauge steel of requisite thickness and equipped with mounting brackets. The emissions from alarms should conform with EMC standards. Master alarm management system should be designed to display alarm conditions from the source supply units indicating the broad status of the source equipment and manifolds as well as the master distribution status from the source supplies. Depending on the alarm priority, a visual and audible alarm should be initiated to indicate an alarm condition. Each panel shall display and/or input of multi point alarms,including all necessary cabling between mater alarm and floor panels. The master alarm must be able to monitor the following source alarm conditions. as per technical specifications."
od324919/2023_2024 Combined Electrical Control panel with wiring for Air compressor & vaccum Pump system as per technical specification.
od324931/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-12mm x 0.7 mm thick copper pipe.
od324932/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-15 mm x 0.9 mm thick copper pipe
od324933/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-22 mm x 0.9 mm thick Copper pipe
od324934/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-28 mm x 0.9 mm thick Copper pipe
od324935/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-35 mm x 1.2 mm thick Copper pipe
od324936/2023_2024 Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc. as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications-42 mm x 1.2 mm thick Copper pipe
od324992/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-O2 Outlets with Probes
od324993/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-N2O Outlets with Probes
od324994/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications- Air ( 4 bar) Outlets with Probes
od324995/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-Air (7 bar) Outlets with Probes <br
od324996/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-Vacuum Outlets with Probes
od324997/2023_2024 Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications- CO2 Outlets with Probes
od324999/2023_2024 Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-3 gas - 1 O2, 1M air, 1 Vac
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-2gas - 1 O2, 1 Vac
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-5 gas- 1O2,1 N2O, IM air , 1 s air, 1 vac
od325002/2023_2024 Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the /HTM 02-01/ISO 7396-1 requirements and should be CE Certified or. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications-6 gas- 1O2,IM air,1 N2O, 1 s air, 1 vac
od325099/2023_2024 Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specificattions - 15mm
od325100/2023_2024 Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-22 mm
od325101/2023_2024 Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-28mm
od325102/2023_2024 Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-35 mm
od325103/2023_2024 Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-42 mm
od325104/2023_2024 Supply,testing and commissioning of class J type Oxygen Gas filled Cylinder etc in complete as per technical specification.
od325130/2023_2024 Supply,testing and commissioning of J type Nitrous Oxide Gas filled Cylinder as per technical specification.
od326890/2023_2024 Supply,testing and commissioning of J type CO2 Gas filled Cylinder as per technical specification.
od326670/2023_2024 Supply and installation of Bed Head 5ft(Horizontal) unit made out of High strength extruded Aluminum Panel of minimum 2.5 mm thickness with powder coated to make it aesthetically appealing and long lasting, the panel should be suitable for accommodating following utilities - Oxygen, Vacuum, Medical Air, Nurse call switch — 1, spare probe, 2 no 5 /15A combined socket with switch outlet — 2 set, provision RJ-45 socket/ Ethernet, shall have monitor holder and equipped with two side rail system to hold different associated accessories like vaccine basket, Holder for vacuum collection jar, examination lamp, IV pole, etc. and all necessary mechanical supports for complete installation as instructed and directed by engineer in- charge.
od326825/2023_2024 Supply Installation of BPC Oxygen Flow meter as per technical specification.
od326826/2023_2024 Supply Installation of Ward vacuum unit with 600 ml collection jar asper technical specification.
od325148/2023_2024 Supply Installation of Theatre Vacuum unit with trolly and 2000 ml collection jar as per technical. .
od325149/2023_2024 Supply,Installation,testing and commissioning of Anesthesia Pendent Single Arm
od326774/2023_2024 BHP Suction Clamp
od326775/2023_2024 BHP IV Stand
od326776/2023_2024 BHP Monitor Tray
od326777/2023_2024 Supply,Installation,testing and commissioning of High Pressure Antistatic Hose with color coded.
SUNIL KUMAR PANDEY (BID ID -2081880)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .