Tender ID
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
20 Apr 2026, 4:00 pmClosed
SE-TR JAMNAGAR
Construction of CR Building Extension (2 Span) & Old Control Room Building Renovation & Maintenance, C-Wall and Misc. civil works at 66kV Visavada SS, 66kV Ramgadh SS, 66kV Khageshri SS and 66kV Paradava SS under Ranavav Division under Jamnagar Circle. (Re-Invite)
291687
TCJ/25-26/167
Open
Civil Works
Works
Jamnagar
14 documents required · 13 mandatory · 1 optional
₹4,248
GETCO-JAMNAGAR
₹1.1 L
30 Mar 2026
30 Mar 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
Name of Work: “Construction of CR Building Extension (2 Span) & Old Control Room Building
Renovation & Maintenance, C’Wall and Misc. civil works at 66kV Visavada SS, 66kV Ramgadh
SS, 66kV Khageshri SS and 66kV Paradava SS under Ranavav Division under Jamnagar Circle.
Description Unit Rate Amount
SCHEDULE-B1:- FOR CIVIL WORKS
[A] DEMOLITION & DISMENTELING
1 Demolition of brickwork and stone masonry
including stacking of serviceable materials and
disposal of unserviceable materials with all
lead lift. (ii) In cement mortar
2 Demolition including stacking serviceable
material and disposal of unserviceable
materials with all lead and lift (i) RCC/CC
3 Dismantling tiled of stone floors laid in mortar
including stacking of serviceable materials and
disposal of unserviceable materials with all
4 Dismantling doors, windows, ventilators etc.
(wood or steel or aluminium) shutters including
chowkhats architraves, holdfasts and other
attachment etc. complete and stacking them
within all lead and lift.(i) Not exceeding 3Sq.M.
5 Dismantling doors, windows, ventilators etc.
(wood or steel or aluminium) shutters including
chowkhats architraves, holdfasts and other
attachment etc. complete and stacking them
within all lead and lift.(i) exceeding 3Sq.M. in
6 Dismantling C.I. pipes G.S.W. pipes and A.C. rain
water pipes with fittings and clamps including
stacking the materials with all lead and lift ( for
any dia, of pipe)
7 Dismantling sanitary fittings like washbasin.
W.C. pan Indian and European type, flushing
tank etc. including stacking the materials with
all lead and lift.
8 Cutting out cracks of roof terrace/wall to V
section, cleaning out, wetting, grouting with 180.00 RMT 71.00
cement and sand slurry 1:3 (1 cement, 3 sand).
9 Repairing of damaged concrete surface
including building up of surface profile
structural elements by using polymer
concrete/mortar/epoxy-latex modified air
cured concrete/mortar system confirming to
ASTM-C1059-86 type II 91 cement; 3 well
graded clean pre-packed river sand with 10%
epoxy latex by weight of cement & water
cement ratio (w/c) as per 0.3) or
recommended by manufacturer of average of
25mm thickness in damaged areas including
applying structural grade epoxy/latex bond
coat confirming to ASTM-C882 91 prior to
application of polymer modified mortar/spray
to ensure bond between old concrete & new
system by brush application, levelling, profiling
etc inclusive of all labour, material, equipment
etc completed as per instruction of EIC.
10 Providing SBR chemical for joint of make SIKA
Dr Fixit or equivalent as per instruction of 8.00 Ltr 370.00
engineer in charge.
11 Removing & Scraping of old deteriorated
plaster of any thickness from wall / R.C.C.
member including stacking of serviceable 216.00 SMT 21.00
material and disposal of unserviceable from
site of work with all lead and lift.
12 Removing dry or oil bound distemper by a
washing and scraping and sand papering the
wall surface smooth including necessary repairs
to scratches complete.
13 Scraping oil paint from steel and other metal
surface and making the surface even (with Hand 69.00 SMT 54.00
[B] EXCAVATION, FILLING AND EARTH WORK
14 Excavation for foundation up to 1.5m depth
including refilling the trenches, sorting out and
stacking of useful materials and disposing of the
excavated stuff up to any lead, dressing, rolling
watering & lift. No extra payment shall be
made for disposing of extra excavated earth
from s/s premises or switch yard etc as per
directive of EIC - including De-watering if
required - Any type of soil/ Murrum/Soft rock /
Hard rock. - Executed with manual labour.
15 Excavation for foundation 1.50 to 3.10m Depth
including refilling the trenches, sorting out and
stacking of useful materials and disposing of the
excavated stuff up to any lead, dressing, rolling
watering & lift. No extra payment shall be
made for disposing of extra excavated earth
from s/s premises or switch yard etc as per
directive of EIC - including De-watering if
required - Any type of soil/ Murrum/Soft rock /
Hard rock. - Executed with manual labour.
16 Filling in plinth/trenches & in s/s Premises or switch
yard with earth in 200mm, thick layers including
watering, ramming, consolidating etc., complete as
directed by EIC. - Excavated earth from foundation
excluding black cotton soil & boulders. The item
rate includes all leads ,lifts & labours.
17 Earthwork for embankment including breaking
clods, dressing with all lead and lift (including
watering, rolling and consolidation with 8 to
T rollers in layers of 200 mm thick at O.M.C to
required dry density). Including all Labour
charges & approved quality of Earth/Murrum &
Govt. royalty charges etc. if applicable. 40.00 CMT 304.00
Approved quality of yellow earth/Murrum to be
brought from outside.
(Note : 25 % of the successive bill amount shall
be retained till lapse of one full scale monsoon
and rectification of subsistence if any to the
design ground level)
18 Earth work cutting in any sorts of soil/soft
rock/hard rock including breaking rock in
required size, preparing the surface, cutting
with all required lead and lift, consolidating
spreaded soil and rolling of filled earth work in
200 mm thick layers at OMC & carry out required
dry density with power roller 8 to 10 tonnes 10.00 CMT 139.00
including filling in depressions which occur
during the process, and stacking or utilizing the
cutting stuff in S/S area as directed by EIC
throwing away the extra stuff out side s/s
premises as directed by EIC. Only cutting
measurement will be paid.
19 Filling in plinth/trenches with Sand under floor
including spreading, watering, ramming,
consolidating etc., complete as directed by EIC.
- The item rate includes all leads & lifts.
[C] CONSTRUCTION
(1) MASONARY WORK
20 Providing White stone Bella masonry (incl.
quoin blocks, jamb blocks, closer etc;) approved
size in C.M. (1:6) including racking out joints up
to 12mm depth, scaffolding, curing, filling up 63.00 CMT 6167.00
the gaps between the joints complete as
directed by E.G. for foundation and up to
21 Providing White stone Bella masonry (incl.
quoin blocks, jamb blocks, closer etc;) approved
size in C.M. (1:6) including racking out joints up
to 12mm depth, scaffolding, curing, filling up 64.00 CMT 6459.00
the gaps between the joints complete as
directed by E.G. for Super Structure G.F + F.F
22 Providing Half Brick masonry using common
burnt clay building brick having crushing
strength not less than 35Kg/Sq.Cm. in Cement 42.00 SMT 642.00
Mortar (1:4) (1-Cement : 4-Fine Sand) including
racking out joints up to 12mm depth,
scaffolding, curing, filling up the gaps between
the joints complete as directed by E.I.C. (B)
Conventional - in Super Structure G.F+ F.F+
(2) CONCRETE WORK
23 Providing and laying cement concrete 1:4:8 (1
Cement : 4 Coarse sand : 8 black crushed stone
aggregate 40mm Nominal size) and curing 75.00 CMT 2765.00
complete- excluding cost of formwork
Foundation and plinth.
24 Providing form work of ply wood shuttering so
as to give a smooth exposed finish including
centering (adjustable tubular steel supports).
Shuttering strutting and propping etc. for any
height of propping and centering below 124.00 SMT 285.00
supporting floor to ceiling , and removal of the
same for reinforced concrete and plain
concrete. for Footings , foundations and
25 Providing & laying control cement concrete M-
20 as per mix design exposed work with curing
etc. complete excluding the cost of ply wood
form work & adjustable tubular steel supports / 12.00 CMT 4117.00
Props. and the cost of reinforcement. G.F+ FF &
Staircase -For Footing base of col.,foundation
& mass concrete.
26 Providing & laying control cement concrete M-
20 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F+ FF & Staircase - For Columns
27 Providing & laying control cement concrete M-
20 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F+ FF & Staircase - For Beams
28 Providing & laying control cement concrete M-
20 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Sill, Lintel, Chajja,
Slab, Coping, other cantilever portion
29 Providing & laying control cement concrete M-
20 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For vertical walls.
30 Providing & laying control cement concrete M-
25 as per mix design exposed work with curing
etc. complete excluding the cost of ply wood
form work & adjustable tubular steel supports / 42.00 CMT 4386.00
Props. and the cost of reinforcement. G.F + FF
& Staircase -For Footing base of
col.,foundation & mass concrete.
31 Providing & laying control cement concrete M-
25 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Columns
32 Providing & laying control cement concrete M-
25 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Beams
33 Providing & laying control cement concrete M-
25 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports / 42.00 CMT 8160.00
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Sill, Lintel, Chajja,
Slab, Coping, other cantilever portion
34 Providing & laying control cement concrete M-
25 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For vertical walls.
35 Providing & laying control cement concrete M-
30 as per mix design exposed work with curing
etc. complete excluding the cost of ply wood
form work & adjustable tubular steel supports / 15.00 CMT 4647.00
Props. and the cost of reinforcement. G.F + FF
& Staircase -For Footing base of
col.,foundation & mass concrete.
36 Providing & laying control cement concrete M-
30 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Columns
37 Providing & laying control cement concrete M-
30 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F+ FF & Staircase - For Beams
38 Providing & laying control cement concrete M-
30 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports / 15.00 CMT 8422.00
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For Sill, Lintel, Chajja,
Slab, Coping, other cantilever portion
39 Providing & laying control cement concrete M-
30 as per mix design exposed work with curing
etc. complete including the cost of ply wood
form work & adjustable tubular steel supports /
Props. but excluding the cost of reinforcement.
G.F + FF & Staircase - For vertical walls.
40 Providing & Fixing in position as per approved
drawing TMT steel FE 500/500D/550/550D
reinforcement bars confirming to IS 1786 in RCC
work including Cutting, bending, binding with
16 gauge annealed wire, of bars as per IS
requirement If necessary and placing in position
etc. completed for RCC work. etc. completed as
directed by EIC.
41 Providing and applying anticorrosive treatment
with polymer base materials to the steel
reinforcement including descaling the dust and
applying the preventive coating of approved
make (for the R.C.C. structures near coastal
area only) etc. Complete.
(3) PLASTER WORK
42 Providing 10 to 15 mm thick chemical plaster to the
ceiling/Slab using Self curing special ready plast
(Ready mix plaster) of Ultratech, Fosroc,
Megicrete, JSW cement,Walplast or Equivalent
brand as per manufacturer's recommended process
and as directed by the in-charge engineer.
43 Providing 15mm thick sand face single coat plaster
on masonry / Bela / concrete wall using special
ready mix plaster Ultratech, Fosroc, Megicrete, JSW
cement, Walplast or Equivalent brand as per
manufacturer's recommended process and as per
directed by the in-charge engineer.
44 Providing 20mm thick sand face double coat on the
wall up to a height of 10 meters above ground level,
using special ready mix plaster Ultratech, Fosroc,
Megicrete, JSW cement,Walplast or Equivalent
brand consisting of 12mm thick backing coat and
8mm thick finishing coat per manufacturer's
recommended process and as per directed by the in-
charge engineer.
45 Providing and fixing 18 gauge wire mesh jali having
width 200 to 300 mm with nails before finishing the
surface with plaster. The item rate includes
providing necessary scaffolding tools and tackles
46 Providing cement vata (10cmx10cm size) quarter
round in cement mortar 1:1 including neat cement 168.00 RMT 24.00
finishing watering etc. complete.
47 Providing & Applying Two coats of Birla or
Asian Acrylic Lappy (Putty) and two Coats of
primer of approved brand and manufacture on
the new wall/ceiling surface to give an even 867.00 SMT 40.00
shade, including thoroughly brushing the surface
free from mortar dropping and other foreign
matter, and sandpapering smooth.
48 Providing and applying (three coats) with plastic
emulsion paint of approved brand and
manufacture like Asian paints Apocolite
premium emulsion, Dulex velvet touch or its
equivalent on undecorated wall surface to give
an even shade including thoroughly brushing the
surface free from mortar droppings and other
foreign matter and sand papered smooth.
Minimum 03 year warranty certificate to be
taken from paint brand. (Note: Before making
final payment to agency warranty certificate
from the original manufacture for specific
project on the name of agency must be
49 Providing and Applying 1(one) Coat of
SMARTCARE PRIMERO and 2(two) coats of
APOCOLITE APEX plastic emulsion paint or its
equivalent Wall painting of approved brand and
manufacture and GETCO Approved Shade on
undercoated wall surface to give an even shade.
The work included thoroughly
brushing/cleaning the surface free from mortar
droppings and other foreign matter and also 5829.00 SMT 121.00
including preparing the surface even and smooth
by sand paper or any other approved method.
Minimum 05 year warranty certificate to be
taken from paint brand. (Note: Before making
final payment to agency warranty certificate
from the original manufacture for specific
project on the name of agency must be
50 Providing & applying 3 coats of ACID/ALKALI
resisting paint of approved shade & make to
wall, ceiling including filling putty smoothing
the surfaces scaffolding etc. complete as
directed by E.I.C.
51 Providing and applying priming coat & Painting
two coats(excluding priming coat) on
previously painted steel and other metal
surface with enamel paint, brushing to give an 69.00 SMT 133.00
even shade including cleaning the surface of all
dirt, dust and other foreign matter.
52 Providing & Applying tar extended two
component coating system based on
synthesized epoxy resin and amine adduct
manufacture as per technical specification of
central electro chemical research
(CERCI/CSIRKARAIKUDI) to achieve 400-450
microns DFT in two coats as directed. The item
includes cleaning the surface before treatment 48.00 SMT 283.00
as per manufacturer specification. The coating
system EPCO2020TX or equivalent shall comply
the CERCI technology of " comprehensive repair
& protection of concrete/steel surface in wet &
underwater condition". The rate shall be incisive
of all materials labour equivalent scaffolding
etc. Complete as directed by E.I.C.
53 Providing and laying approved quality polished
Kotah stone slab (25 mm th. and 600mm x 600mm
in size) flooring including using 35x25mm approved
quality machine cut, marble strip over 20mm
(average) thick base of cement mortar 1:6 (1
cement : 6 course sand laid over and jointed with
grey cement slurry including rubbing and mirror
polishing using polishing machine with grinding six
emery's of different no. including using special
chemical powder for polishing including white
cement coating two times during polishing for filling
up minute holes or cracks in joints etc. complete.
The item rate includes the removing the existing
flooring including base concrete, throwing the stuff
as & where directed up to any lead. Etc. complete
as directed by E.I.C. The waste material will be
property of contractor.
54 Providing and laying Kata stone slab 25mm
thick in step, riser, dedo over 20mm Av. base
cement mortar of 1:6(1Cement :6 coarse sand)
laid over & jointed with white/grey cement
slurry mixed with pigment to match the shade of
slab including rubbing &Moulding edges, rubbing
and polishing complete. (A) 25mm Thick.
55 Providing and laying colour glazed tiles- JOHNSON
/ KAJARIA / NITTCO / VARMORA / SIMPOLO or its
equivalent make of the size 300mm x 450mm x
to 10 mm thick in flooring & Dedo laid on bed of
12mm thick cement mortar 1:3 (1 cement :
course sand) & fixing the same in cement & 28.00 SMT 1544.00
providing 12 mm thick back coating of cement
plaster in CM 1:3 for base, filling the joints with
white/colour cement neatly finishing the joints
curing etc. complete.
(6) DOORS AND WINDOWS
56 Providing and fixing window having extruded aluminium
20micron thick colour anodized section frame main
outer size 63.50x38.10x1.95mm (of Jindal Section
no:4605, @ wt. 1.094Kg/Rmt), horizontal two track
member size 61.85mm x 31.75mm x 1.20mm(of Jindal
Section mo: 8687 @ wt. of 0.695 Kg/mt), vertical
member of size 61.85mm x 31.75mm x1.30mm(of Jindal
section no: 8758 @ wt. of 0.659 Kg /mt) with Sliding
Shutters of horizontal member Size 40mm x 18mm x
1.29mm(of Jindal section no: 8949 @ wt. of 32.00 SMT 3711.00
0.456Kf/mt), vertical member of size 40mm x 18mm x
1.29mm (of Jindal Section: 8947 @ wt. 0.457 Kg/mt,
section 8948 @ 0.457kG/mt) with 5 mm thick
transparent bronze colour/white tinted float glass with
aluminium fittings and fixtures and transparent silicon
sealant glass fixing to frame as per details etc complete
57 Providing and fixing fully glazed / partly glazed double
leaf 20 micron thick anodized aluminium door with
following listed extruded section manufactured by
Jindal Aluminium Ltd. & other accessories, the
Aluminium sections are of HE9WP Group:
(1) with door outer frame section of 63.5 x 38.1 x
mm thick weighing 1.777 Kg/Rmt (J4605) (2) Door
shutter vertical style (meeting style) of 53.7 x 44.45 x
2.30mm thickness (J4537) weighing 1.238 Kg/m (3)
Hinge side 53.7 x 44.45 x 2.30mm thickness (J4540)
weighing 1.173 Kg/Rmt
4) Bottom rail of size 150 x 44.45 x 2.40mm thickness
(J4538) weighing 2.376 Kg/Rmt (5) Lock rail of size
x 44.45 x 2.40mm thickness (J4538) weighing
Kg/Rmt (6) Top rail of size 47.62 x 44.45 x 3.18mm
thickness(J4506) weighing 1.501 Kg/Rmt (7) Ventilator
middle member (if required) 49.91 x 44.45 x 3.00mm
thickness (J4621) weighing 1.495 Kg/ Rmt (8) Aluminium
handle 127.00 x 37 x 3.65mm thickness (J4483)
weighing 1.912 Kg/No. (9) Tower bolt 250mm long
(J4954) (10) Aluminium bending mortice lock (J4420)
)11) Top panel using 6.0mm thick Triveni or Modi or Saint
Gobain make float glass fixed with PVC Clear gasket (12)
Bottom panel using 12mm thick exterior grade
prelaminated particle board of make approved by the
Engineer - in - Charge (for partly glazed door) fixed with
virgin PVC clear gasket
13) Door Closer of make approved by the Engineer - in -
Charge with all other required fixtures and fastening of
colour anodized with aluminium beading, with all labours
and materials etc. Complete as directed by EIC.
Aluminium section user for fixing hinges
(7) FABRICATION ITEMS
58 Providing and fixing approved quality Rolling
shutters of approved make and made with
gear operated type with crane handle as per IS
6248 -1979 having 18 gauge sheet thickness and
80mm wide M.S. Laths interlocked together
through their entire length and jointed together
at the ends by end locks mounted on specially
designed pipe shaft with bracket plates guide
channels and arrangements for inside locking 32.00 SMT 5787.00
with push-pull operation complete including the
cost of hood cover with one coat of red oxide
primer followed by 3 coats of an oil painting of
approved shade & tint etc complete as directed
by E.I.C (The measurement shall be paid for wall
opening plus drum only) (A) Shutter having width
below 3.5 meters.. (The measurement shall be
paid for wall opening plus drum only)
59 Providing & fixing MS Grill of approved quality
& design weighing 25 to 30 kg/smt. as per
drawing & as directed with including welding or
bolted fixtures and fastening. M.S. Flat hold 512.00 KG 123.00
fasts etc. with 3 coats of oil painting of approved
shade & tint with one coat of red oxide primer
etc. complete as directed by EIC
60 Providing & fixing M.S. cover for cable trench
in control room made from 14 Gauge M.S. Sheet
having M.S. Angle frame around of 40 X 40 X
5mm. size and cover shutter frame of angle 30 x
30 x 5 mm size & 2 supports at middle including 12.00 SMT 5270.00
oil painting of 3 coats of approved shade &
make. Providing 2 handles of 6mm. dia. M.S. bar
as per instruction etc., complete as directed by
61 Providing & fixing pre-cast Rubber Dye inter
locking colour concrete block of 60 mm thick
with grade of concrete M300 pneumatic
compressed by mechanically pressed and as per 100.00 SMT 701.00
approved design including 75 mm sand layer for
levelling and filling the joint with sand in proper
line and level etc complete
62 Providing & applying water proofing treatment
by on terrace area of building Smart Care damp
proof ultra of Asian paints or equivalent by (1)
cleaning the terrace, parapet wall etc.
complete by means brush, water etc. & make it
complete dust free (2) Applying crack seal on
cracks of terrace roof, parapet etc (3) providing
first coat of self priming smart care damp proof
ultra of Asian paints or equivalent using brush &
by adding 33% thinner (water) & kept surface
free for 4-6 hours for making dry (4) applying
first coat of water proofing smart care damp
proof ultra of Asian paints or equivalent using
roller without adding any thinner & kept surface
free for 4-6 hours for making it dry (5) joints of
parapet & slab packing work by smart care joint
tap of Asian paints or equivalent (6) applying
second coat of water proofing smart care damp
proof ultra of Asian paints or equivalent utilizing
roller without adding any thinner & kept surface
free for 4-6 hours for making it dry. The
contractor shall submit the performance
guarantee of manufacture. The contractor shall
submit performance guarantee in the form of
BG / DD for the waterproofing item at the rate
of 20% of cost of executed quantity of item of
work order for a period of 5 years from actual
date of completion of work on stamp paper of
appropriate value in approved format of
GETCO. (Note: Before making final payment to
agency warranty certificate from the original
manufacture for specific project on the name
of agency must be collected.)
63 Providing & applying water proofing treatment
on wall area of building by Smart Care damp
proof ultra of Asian paints or equivalent by (1)
cleaning the terrace, parapet wall etc.
complete by means brush, water etc. & make it
complete dust free (2) Applying crack seal on
cracks of terrace roof, parapet etc (3) providing
first coat of self priming smart care damp proof
ultra of Asian paints or equivalent using brush &
by adding 33% thinner (water) & kept surface
free for 4-6 hours for making dry (4) applying
first coat of water proofing smart care damp
proof ultra of Asian paints or equivalent using
roller without adding any thinner & kept surface
free for 4-6 hours for making it dry (5) joints of
parapet & slab packing work by smart care joint
tap of Asian paints or equivalent (6) applying
second coat of water proofing smart care damp
proof ultra of Asian paints or equivalent utilizing
roller without adding any thinner & kept surface
free for 4-6 hours for making it dry. The
contractor shall submit the performance
guarantee of manufacture. The contractor
shall submit performance guarantee in the
form of BG / DD for the waterproofing item at
the rate of 20% of cost of executed quantity of
item of work order for a period of 5 years from
actual date of completion of work on stamp
paper of appropriate value in approved format
of GETCO. (Note: Before making final payment
to agency warranty certificate from the
original manufacture for specific project on
the name of agency must be collected.)
64 Providing & applying anti termite treatment, as
per IS 6313 (Part. II & II 2001) for building works
in pre construction & post const. stages, using
chemicals conforming to relevant IS in water
emulsion and effective when applied uniformly
over the area to be treated. The chemical to be
used is chlorophriphos 20% EC or its equivalent.
The treatment is to be carried out as per the
procedure mentioned below and treated plinth
surface area is to be taken for measurement.
(with performance guarantee for 5 years)a)For
pre construction treatment: For plinth filling &
periphery holes in side plinth to be drilled
300MM C/C each having depth 1.5M and for
inside plinth the hole are to be treated with
diluted chemical solution, 1.5 lit. per hole, in
the ratio of 1:20. For periphery i.e. out side
plinth the ditch is to be treated with diluted
solution 2.25 litre per rmt. In the ratio 1:20.
The entire surface area is to be treated with
diluted solution of dose 2.5 litres per smt. over
and above as a plinth surface treatment. The
contractor shall submit the performance
guarantee of manufacture. The contractor shall
submit performance guarantee in the form of
BG / DD for the Anti termite item at the rate
of 20% of cost of executed quantity of item of
work order for a period of 5 years from actual
date of completion of work on stamp paper of
appropriate value in approved format of
GETCO. (Note: Before making final payment to
agency warranty certificate from the original
manufacture for specific project on the name
of agency must be collected.)
65 Drilling of bore holes of suitable size By means
of compressor machine as decided by Engineer
- In- Charge and as per drawing in all sorts of
soils, sand, clay, hard rock etc. truly vertical to
existing land with cleaning the same by air and
grouting the bores by means of cement, sand,
grit etc. with utilization of aluminium powder or
ACC shrink compound 'N' grout or equivalent any 168.00 RMT 446.00
other bonding material as approved by
competent authority in suitable content with
mixing, ramming curing etc. complete including
with MS anchor bar (Reinforcement) (The rate
includes the cost of MS anchor bar) as directed
by Engineer - In - Charge.
66 Providing & placing 50mm thick & 300mm wide
Prestressed Concrete Cover in proportion
(1:1:5:3) or M-20 necessary reinforcement or
4mm dia HT steel wire-4 Nos. bars and 4mm dia.
distribution bars at 150 mm C/C as per drawing
& design including vibrating with vibrators. 36.00 SMT 535.00
Finishing all the surfaces, curing by placing in
water pond for ten days etc. complete as
directed by E.I.C. ( The rate includes cost of all
material required, labour charges,
transportation, loading, unloading etc.
[D] WATER SUPPLY AND DRAINAGE & MISC.
67 Providing laying and joining in true line and level
UPVC pipe (SCH-40) including fittings of
PRINCE/ SUPRIME/ ASTRAL/ FINOLEX or
equivalent make or as approved by EIC.Pipe
shall be fixed on the wall with the help of clamp
at every 2000mm c/c or shall be concealed or
necessary excavation in trenches as directed 30.00 RMT 72.00
including necessary fittings including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all materials
and necessary refilling the trenches, dressing
etc complete for 15mm dia pipe.
68 Providing laying and joining in true line and level
UPVC pipe (SCH-40) including fittings of
PRINCE/ SUPRIME/ ASTRAL/ FINOLEX or
equivalent make or as approved by EIC.Pipe
shall be fixed on the wall with the help of clamp
at every 2000mm c/c or shall be concealed or
necessary excavation in trenches as directed 60.00 RMT 91.00
including necessary fittings including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all materials
and necessary refilling the trenches, dressing
etc complete for 25mm dia pipe.
69 Providing laying and joining in true line and level
UPVC pipe (SCH-40) including fittings of
PRINCE/ SUPRIME/ ASTRAL/ FINOLEX or
equivalent make or as approved by EIC.Pipe
shall be fixed on the wall with the help of clamp
at every 2000mm c/c or shall be concealed or
necessary excavation in trenches as directed 30.00 RMT 147.00
including necessary fittings including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all materials
and necessary refilling the trenches, dressing
etc complete for 40mm dia pipe.
70 Providing & laying rigid 6 kg/cm2 PVC drainage
pipe 75mm dia. including necessary fittings like
bend, tee,Y bend plug etc. fixed with wall by
means of clamps & nails with water tight joints
by approved solution etc. complete as directed
71 Providing & fixing FINOLEX or equivalent
brand approved quality rigid P.V.C. pipe for
Rain water 4 kg/cm2 including necessary
fittings like bends, shoe, cowl etc. & fixing the
pipes to the wall in plumb by means of G.I. 20.00 RMT 149.00
Clamps of 18 gauge sheet at 1 to 1.5 meter
distance, filling the joints with approved
solution complete as directed by E.I.C. - 90 mm
72 Providing & laying rigid 6 kg/cm2 PVC drainage
pipe 110mm dia. including necessary fittings
like bend, tee,Y bend plug etc. fixed with wall
by means of clamps & nails with water tight
joints by approved solution etc. complete as
directed by EIC
73 Supplying and fixing reinforced concrete heavy
duty non-pressure pipes with collars for culverts
including necessary excavation & refilling the
trenches, joining, the pipes with C.M. (1:1) &
filling 150mm thick concrete (1:4:8) below 24.00 RMT 874.00
joints, curing etc. completed as directed by
E.I.C I.S. Class NP3 of internal diameter
74 Providing and fixing approved quality PVC SWR
Nahani trap IS 14735 for drain 100 mm diameter
with jali with self cleaning design with CI screed
down or hinged grating including the cost of
cutting with additional aluminium perforated 5.00 NO 608.00
jali cover & Pipe outside the wall with plug,
bend, and making good the walls etc. complete
as directed by E.I.C.
75 Providing and fixing approved quality S.W. gully
trap with C.I. Grating, brick masonry chamber
and water tight C.I. cover with frame of 300 mm
x 300 mm size (inside) with standard weight. (B)
150 mm x 100mm size P or R type.
76 Providing & fixing approved quality non-
return full way wheel valve 40MM DIA UPVC
make PRINCE / SUPREME / ASTRAL / FINOLEX
or equivalent as approved by Engineer in charge.
77 Providing & fixing approved quality non-
return full way wheel valve 25MM DIA UPVC
make PRINCE / SUPREME / ASTRAL / FINOLEX
or equivalent as approved by Engineer in charge.
78 Providing and fixing approved quality screw
down bib tapes of following size: (A) Brass
screw down bib tap polished bright 15mm dia.
79 Providing & Fixing approved quality a set of
Nos. of stainless steel coat racks of approved
quality fixed on 20 mm. thick teak wood batten
including 3 coats of oil painting etc., complete
as directed by E.I.C
80 Providing & fixing approved quality light type
600X600mmsize C.I. Manhole covers with
water tight C.I. Frame & fixing the same in 1.00 NO 1130.00
concrete etc. complete as directed by E.I.C.
81 Providing and fixing approved quality C.P. Brass
towel rod complete with C.P. Brass brackets
fixed to wooden plugs with C.P. Brass screws.
600mmx20mm size
82 Providing and fixing approved quality 600mm x
450mm bevelled edge mirror of superior glass
mounted on PVC moulded frame and fixed to
wooden plugs with C.P. brass screws and
83 Providing and fixing wash basin with single hole
pillar tap with tap with C.I. or M.S. brackets
painted while/colour including cutting holes and
making good the hole including pillar tap,
chromium plated bottle trap, stop cock, fisher
union, Brass waste pipe etc complete. 550mm x
84 Providing and fixing approved quality European
PAN water closet squatting pan size 580mm
including providing and fixing Plastic seat cover
& jet spray, 100mm size P or S trap jointing tap
with the pan and soil waste pipe and with G.I. 1.00 NO 2505.00
inlet connection for flush pipe with W.C. pan
and chromium plated brass half turn flush cock
of approved quality of 25mm dia etc. complete.
85 Providing and fixing urinal of approved quality
including connection with trap and with integral
longitudinal flush pipe concealed outlet (A) 1.00 NO 1689.00
squaring plate pattern white earthenware
86 Providing B.B. Masonry inspection chamber for
underground CI inspection chamber and bends
with bricks heavy crushing strength not less than
35 kg/cm2 in CM (1:5), CI cover with frame (light
duty) 455mm x 610 mm internal dimensions,
total weight of cover with frame to be not less
than 38 kgs (weight of cover 23 kg and weight of
frame 15 kg). RCC top slab with 1:2:4 mix 2.00 NO 3984.00
(1cement: 2Coarse sand : 4 graded stone
aggregate 20 mm size). Foundation concrete
1:5:10, inside plaster 15 mm thick with cement
mortar 1:3 finished smooth with floating coat of
neat cement on walls and bed concrete etc.
complete. Inside dimensions 450mm x 610 mm
up to 900 mm deep.
TOTAL COST OF CIVIL WORKS IN Rs.
In Words :- One Crore Twelve Lacs Sixety- Nine Thousand Two Hundred Seventy Rupees and Thirty Three Paisa only.
NOTE: (1) Please note that change in commercial terms & conditions in (i) Section-A ”Instruction to Bidders” , (ii)
Section-C (Conditions of Contract), Caluse No.3 (Compensation for the delay) and clause No.6 (Action on default
by contractor) and (iii) Section-D (General Condition of Contract), Clause-37 (Rights of Owner), Clause-38
(Relationship with employee) and clause-39 (Conflict of Interest among Bidder/Agents)
Supt Engineer (TR),
GETCO: Circle Office, Jamnagar.
I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical specifications put by
GETCO on WEB site.
I/We hereby accept all the conditions and specifications of this tender document, and accordingly, I/We am/are
willing to carry out the work at _________________% (in words ______________percentage) above/below the
estimated cost. Accordingly the total amount of my/our tender works out to Rs.____________________
estimated cost. Accordingly the total amount of my/our tender works out to Rs.____________________
SIGNATURE OF CONTRACTOR.
(With rubber stamp/seal of the company)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice (TCJ-25-26-167).pdf
Integrity Pact (TCJ-25-26-167).pdf
Technical Specification (TCJ-25-26-167).pdf
Price Bid (TCJ-25-26-167).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .