Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹42.5 L+₹8.5 L (25.0%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹43.0 L+₹9.0 L (26.3%)Rejected-Finance 45 58 5 15A AKSHAYA NARASIMHANAGAR VISAKHAPATNAM 530 024 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530024 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹46.8 L+₹12.8 L (37.5%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹49.7 L+₹15.7 L (46.1%)Rejected-Finance D NO 5 13 24 1 BEHIND SAHUWALA CYLINDERS IDA AUTONAGAR VISAKHAPATNAM 530 012 | VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹54.2 L
EMD Value
₹1.1 L
Closing Date
19 Jun 2020, 6:00 pmClosed
GE I DM
Naval Dockyard Visakhapatnam 530014
SPECIAL REPAIRS / REPLACEMENT OF 01 NO GOODS LIFT 200 KG AGAINST BER AT WECORS BLDG NO 16 AND COMPREHENSIVE MAINT AT ND V
2020_MES_346935_1
SSGE/8232/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Dockyard Viswakhapatnam
As per tender documents
7 documents required · 7 mandatory
₹1,000
GE I DM
₹1.1 L
10 Aug 2020
22 May 2020
25 Jun 2020
22 May 2020
19 Jun 2020
5 Jun 2020
Amount
PHASE -I (SCHEDULE `A'- PART-I)
Design, supply, installation, test and commissioning of 2000 Kgs (2.0 Ton) goods lift electrically operated micro processor based with gearless traction unit and VVVF (variable voltage & variable frequency) drive complete with manual collapsible gate as Car door and manual collapsible gate as landing doors. Car enclsosure made out of 1.5 mm thick stainlss steel moon rock finish sheet, Full length car operating panel with illuminated push button on stainless steel face plate suitable to carry 2000 kg at a speed of 0.5 M/sec to serve 3 floors (G+2 floors) including all required brackets of car and counter weight, rails and all accessories as per following detail technical specification : Type : Goods lift Capacity : 2000 Kgs Speed : About 0.5 Meter / Sec Car Travel : G+2 Travel around 12 Meters No of stops : 2 No of openings : 2 Floor Designation : G, 1 Car enclosure : Stainless steel 1.5 mm thick sheet moon rock Finish Car Entrance : Manual collapsible gate Landing entrance : Manual collapsible gate Car platform 1700 mm wide x 2500 mm deep
Clear Entrance : 1500 mm wide x 2000 mm height Hoistway required : 2600 mm wide x 2800 mm deep (clear in side) Elevator pit requred : Depth 1600 mm Machine : Traction Operation : Full collectice controller Drive : ACVVVF Signals : Emergency alarm bell up/down, direction indicators, digital position, indicator in car & landings, emergency stop etc. Main supply system : 440/415 volts, 3 phase, 50 Hz AC Auxilary supply system : 220/230 volts, single phase 50 Hz AC Motor/Gear : Gearless traction machine Ropes : USHA MARTIN Controller : Microprocessor based Automatic rescue device : To be provided Other standard fixtures and fitting like guide rails, sheaves, counter weights with guards, buffers, gear unit breakes, control panel, locks, governor, car operational panel, power, control and trailing cables complete.
Supply and laying in trenches or fixing or passing through pipes or fixed to wall/pole 1100 volts grade PVC/ XLPE insulated armoured heavy duty electric cables (conforming to IS :1554(Part- I) / IS 7098 (Part- I) with aluminium conductor of cross sectional area 50 Sqmm 3.5 core complete all as specified and as directed including taking out old unserviceable work & removing to MES store..
M&L for Earthing complete with Cast iron pipe electrode, 100 mm bore, Class LA, 2.5 mtr long buried directly and vertically in ground with top edge at ground level after making manual bore hole of size not less than 400 mm dia and 2.5 Mtr long near the specified bldg, connected with galvanised steel strip earthing lead of size 32mmx 6mm all as shown in Plate No-2, connected to the earthing test point, concrete pit in PCC 1:3:6 type C-2 with RCC precast pit cover slab 80mm thick with handle for lifting made out of 8mm dia MS rod, wiremesh, charcoal and salt in alternate 150mm thick layers around CI earth pipe, including necessary returning filling in & removal all as specified or indicated in SSR Part-I, including testing to achieve earth resistance value as per IS specification on completion after dismantling taking out unserviceable one complete all as sepcified and as directed. Note : Earth test result shall be submitted to dept.
Supply & Fix Aluminium strip 25 x 3.15 mm with epoxy insulator saddle type 40mm high fixed at 50cm interval, saddles and fixing screws etc., for down conductors above ground complete all as specified and as directed
Dismantling and taking out unserviceable lift including cable / earth strips complete from existing location and depositing to AGE E/M store yard complet all as specified and as directed.
PHASE -II (SCHEDULE `A'- PART-II (ARTIFICIAL LOAD TESTING ON LIFT)
Testing of lift using artificially load at six months interval during defect liability period and submit test certificate from Govt Authorised Agency complete all as specified and as directed. Note : (i) Arficial Load shall be provided by department. (ii) Handling of artifical load from department store to site and necessary vehicle and labour shall be provided by contractor and after testing of lift same shall be returned to store in original.
PHASE -III (SCHEDULE `A'- PART-III (COMPREHENSIVE MAINTENANCE & ARTIFICIAL LOAD TESTING ON LIFT FOR FIRST YEAR AFTER EXPIRY OF DEFECTS LIABILITY PERIOD UNDER PHASE – I)
Comprehensive maintenance of electrically operated goods lift of capacity 2000 Kgs all as mentioned vide Serial Item No. 1.01 &1.02 of BOQ complete all as specified and as directed.and all specified in PS and for First Year after expiry of Defects Liability Period.:- Notes: i) Preventive maintenance consists of carrying out routine check by skilled personnel as specified in Particular specifications and as recommended by Engineer-in-Charge and lubricating to all moving parts, topping up of oils as per Lubrication chart. ii) Breakdown maintained consists of attending to the faults that may occur and carrying out necessary repairs to electrical and control circuits and mechanical components of the lift that may occur during the operation. iii) Fortnightly, quarterly maintenance registers shall be maintained and signed by site engineer and contractor. iv) Technical staff having sound knowledge and well experience in maintenance of lift shall be attended at the time repair/break down and other staff as per maintenance operation mentioned in particular specification for comprehensive mantenance of lift. All the staff employed for maintenance will be reported to AGE E/M office and will give the progess duly entered in the registers/maintenance operation chart.
v) The quoted rate shall be deemed to be included the above aspects and for consumables such as timerly topping up/ replacement of gear oils, acrylic covers, fuses, copper cables, hardware like bolts, nut, emery papers, grease, waste cotton, stationary and other miscellaneous minor parts which are required for smooth maintenance of lifts. , [vi] Defective batteries found in comprehensive maintenance shall be replaced by the contractor without any extra cost to department. [vii] Comprehensive maintenance shall be deemed to be inclusive for repairs/replacement of warn out/defective parts except "lift car including car door, landing door, motors, Gear box, controllers including VVVF drive and micro processors, main rope".
All as per item No. 2.01 above but during 1st year after defect liability period under Phase-I
PHASE -IV (SCHEDULE `A'- PART-IV) (COMPREHENSIVE MAINTENANCE & ARTIFICIAL LOAD TESTING ON LIFT FOR SECOND YEAR AFTER EXPIRY OF FIRST YEAR COMPREHENSIVE MAINTENANCE)
All as per item No. 3, 3.01 & 3.02 above but for second year after expiry of first year comprehensive maintenance, for lift all as mentioned vide Serial Item No. 1.01 &1.02 of BOQ
All as per item No. 2.01 above but during 2nd year after defect liability period under Phase-I
PHASE -V (SCHEDULE `A'- PART-V) (COMPREHENSIVE MAINTENANCE & ARTIFICIAL LOAD TESTING ON LIFT FOR THIRD YEAR AFTER EXPIRY OF SECOND YEAR COMPREHENSIVE MAINTENANCE)
All as per item No. 3, 3.01 & 3.02 above but for third year after expiry of second year comprehensive maintenance, for lift all as mentioned vide Serial Item No. 1.01 &1.02 of BOQ
All as per item No. 2.01 above but during 3rd year after defect liability period under Phase-I
PHASE -VI (SCHEDULE `A'- PART-VI) (COMPREHENSIVE MAINTENANCE OF LIFTS & ARTIFICIAL LOAD TESTING ON LIFT FOR FOURTH YEAR AFTER EXPIRY OF third YEAR COMPREHENSIVE MAINTENANCE)
All as per item No. 3, 3.01 & 3.02 above but for fourth year after expiry of third year comprehensive maintenance, for lift all as mentioned vide Serial Item No. 1.01 &1.02 of BOQ
All as per item No. 2.01 above but during 4 th year after defect liability period under Phase-I
L T ELEVATOR PVT.LTD.
Velox Engineering Solutions Pvt Ltd
M/s Dhapola Elevator and Engineering
INDUSTRIAL ENGINEERING SYSTEMS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .