Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-Finance PATTASSERY HOUSE VENGARA VALIYORA P O MALAPPURAM DT 676304 MALAPPURAM DISTRICT | MALAPPURAM | KERALA | 676304 | L1 | Accepted-Finance Since the bid is RE single tender is accepted with the approval of PMU |
| Sl No | Description | Qty | Unit | ANEES P L1 |
|---|---|---|---|---|
| 1.01 | Electronic device for automation of starter with all required fittings and features like:-Motor ON/OFF through missed call -Motor ON/OFF through SMS -Inbuild preventer and auto starter -Suitable every single/three phase motor starter -Inbuilt star delta timer -Dry run prevention -Overload prevention -Real time clock(RTC) -One year guarantee and ensured customer service at site when ever required | 1 | no | 10,163.13 ₹10,163.13 Lowest |
| 1.02 | A)Pump & Motor
Supply, erection, testing and commissioning of KWA pre-qualified reputed make open well submersible motor pump set, coforming to IS 8034/2002 and amended thereafter and BEE3 Star of rated discharge, and Head, with Bronze or Cast SS
impeller, Brass Screws and CI FG 200 grade Pump Bowl / Diffuser with ISI mark.The pump shall be directly coupled to a continious rated two pole suitable wet type vertical squirrel cage induction motor as per IS 9283,/ 1995 as amended thereafter,siutable for operation in AC 3 phase 415 V + /- 10%, 50 Hz + / - 5%,Duty Conditions :
Discharge - 17.77 lps
Total Head - 110 m
Suction Head - 12 m
Length of suction Pipe - 12 m
B)Starter
The MU-G50 FASD 50HP Fully Automatic Star Delta Starter Supporting motors up to 50HP with a relay range of 45-75A, at a rated voltage of 415V and a frequency of 50Hz, Equipped with a "No-Trip" mechanism, as per IEC 60947-1/IS, Rated Coil
Voltage240V , of approx. size 455mm x 345mm x 485mm "automatic star delta starter" including 3 pole magnetic contactor with under voltage release - 3 Nos., CT operated Ammeter(65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector swicth, Minature Circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm / 4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor. as per IE rules and code of practice, for working 40 HP submersible pump sets at a time , considering all practical losses in Voltage and
efficiency.
C)Panel board
Supply, erection, testing and commissioning of one number cubical type floor mounted MS fabricated dust and vermin proof common control panel board , suitable for providing control system for running these two motor pump sets at a time, suitable capacity MCCBs , providing suitable size Aluminium bus bar , provided with a common earth bus for the entire panel and inter connect with the MCCBs as
per IE rules and code of practice. The panel shall be fitted on a common base frame on suitable foundation, for working 40 HP submersible pump sets at a time.
D)Cabling work
Supply, laying, testing and commissioning of 185 sqmm x 3.50 core XLPE cables for the above pump set from panel board to starter and Copper Cable not below 25sqmm , 6 lines, from starter to motor, for working 40 HP Centrifugal pump sets at a
time. considering energy conservation, including providing necessary Cable Tray of MS fabrication in side the building and sand filled brick trench, additional length allowance as loop for future repaire as per the direction of Engineer.
E)Earthing
Supply of all materials and providing suitable earthing by
using suitable size pipe/plate eartihing Gl/copper strip buried in ground and giving double earthing to motor, starter, panel board etc. as per IE standards.
F)Capacitor
Supply, erection, testing and commissioning of heavy duty
APF capacitor for the motor to get a power factor above 0.95. The capacitor shall confirm to IS 2834
G)Valves
Supply of suitable size best quality heavy duty ISI marked CI
double flanged sluice valve and Non retum valve of 150 mm dia. 1.60 PN pressure rating. Fitting of valves shall include proper RCC support , for Non return valves and Sluice Valves , of reputed make.
H)Suction and delivery pipe connections
Supply and fitting of 150mm dia. best quality C class GI erection pipe, for a total length of 10 m. suitable for the above pump set with suitable flanges, bends, nut and bolts IR sheet packing etc. complete (erection pipe shuould be of 2m each with flanged joints, welded firmly inside and out side for the flange, to hold the heavy load, and for facilitating lifting and erection of motor inside the pump house) and connecting the delivery side ofthe pump with the valves and suitable specials to connect with the pumping main.
I)General Conditions
Warranty - 2 years (rate inclusive of 2 year warranty and maintenance during a period of 2 years from the date of commissioning), for Motor pump set and acessories
supplied. | 2 | set | 6,46,000 ₹12,92,000 Lowest |
| 1.03 | Supply and installation of 185 Sq mm XLPE cable of 3.50 core additional cable | 5 | metre | 1,000.05 ₹5,000.25 Lowest |
| 1.04 | Supply and installation of 25 Sq. mm additional cable beyond the initial supply of 2x10 m | 220 | metre | 220.11 ₹48,424.2 Lowest |
| 1.05 | Supplying, conveying and fixing GI pipes of Class C complete with G I fittings including all cost of cutting, sand papering,welding, clambing etc complete- 150mm dia nominal bore. Fabrication work for connecting with the existing pumping main beyond the initial supply of 2x10 m | 8 | metre | 5,351.34 ₹42,810.72 Lowest |
| 1.06 | Painting of OHSR, Well and Pump house
Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and
staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be
stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge.
Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works | 30 | sqm | 328.25 ₹9,847.5 Lowest |
| 1.07 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 300.4 | sqm | 18.81 ₹5,650.52 Lowest |
| 1.08 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 300.4 | sqm | 183.07 ₹54,994.23 Lowest |
| 1.09 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 135.1 | sqm | 232.34 ₹31,389.13 Lowest |
| 1.10 | Water Quality Testing &Lettering
Testing water sample from the source of scheme at any Government laboratory and submitting the report- both physical and bacteriological parameters. | 2 | no | 850.22 ₹1,700.44 Lowest |
Tender Value
₹15.3 L
EMD Value
₹38,161
Closing Date
21 May 2026, 4:00 pmClosed
Regional Project Director
Kerala Rural Water Supply and Sanitation Agency, Regional Project Management Unit, Malappuram, MMC.X/108-112, UMK Tower, Uphill, Jubilee Road, Near Passport Office, Malappuram P.O. - 676 505
Sustainability Support to Community Managed Water Supply Schemes -2025-26 - Edarikkode LWSS in Edarikkode Gramapanchayth in Malappuram District
2026_KRWSA_850803_1
RE1/KRWSA/MPM/SUS/EDK/25- 26/11
Open Tender
Civil Works - Water Works
Item Rate
120 days
Edarikkode Gramapanchayth
As per tender document
7 documents required · 7 mandatory
₹2,500
₹38,161
28 Sept 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
14 May 2026 - 21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Electronic device for automation of starter with all required fittings and features like:-Motor ON/OFF through missed call -Motor ON/OFF through SMS -Inbuild preventer and auto starter -Suitable every single/three phase motor starter -Inbuilt star delta timer -Dry run prevention -Overload prevention -Real time clock(RTC) -One year guarantee and ensured customer service at site when ever required | - | no | - | - |
| 1.02 | A)Pump & Motor
Supply, erection, testing and commissioning of KWA pre-qualified reputed make open well submersible motor pump set, coforming to IS 8034/2002 and amended thereafter and BEE3 Star of rated discharge, and Head, with Bronze or Cast SS
impeller, Brass Screws and CI FG 200 grade Pump Bowl / Diffuser with ISI mark.The pump shall be directly coupled to a continious rated two pole suitable wet type vertical squirrel cage induction motor as per IS 9283,/ 1995 as amended thereafter,siutable for operation in AC 3 phase 415 V + /- 10%, 50 Hz + / - 5%,Duty Conditions :
Discharge - 17.77 lps
Total Head - 110 m
Suction Head - 12 m
Length of suction Pipe - 12 m
B)Starter
The MU-G50 FASD 50HP Fully Automatic Star Delta Starter Supporting motors up to 50HP with a relay range of 45-75A, at a rated voltage of 415V and a frequency of 50Hz, Equipped with a "No-Trip" mechanism, as per IEC 60947-1/IS, Rated Coil
Voltage240V , of approx. size 455mm x 345mm x 485mm "automatic star delta starter" including 3 pole magnetic contactor with under voltage release - 3 Nos., CT operated Ammeter(65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector swicth, Minature Circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm / 4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor. as per IE rules and code of practice, for working 40 HP submersible pump sets at a time , considering all practical losses in Voltage and
efficiency.
C)Panel board
Supply, erection, testing and commissioning of one number cubical type floor mounted MS fabricated dust and vermin proof common control panel board , suitable for providing control system for running these two motor pump sets at a time, suitable capacity MCCBs , providing suitable size Aluminium bus bar , provided with a common earth bus for the entire panel and inter connect with the MCCBs as
per IE rules and code of practice. The panel shall be fitted on a common base frame on suitable foundation, for working 40 HP submersible pump sets at a time.
D)Cabling work
Supply, laying, testing and commissioning of 185 sqmm x 3.50 core XLPE cables for the above pump set from panel board to starter and Copper Cable not below 25sqmm , 6 lines, from starter to motor, for working 40 HP Centrifugal pump sets at a
time. considering energy conservation, including providing necessary Cable Tray of MS fabrication in side the building and sand filled brick trench, additional length allowance as loop for future repaire as per the direction of Engineer.
E)Earthing
Supply of all materials and providing suitable earthing by
using suitable size pipe/plate eartihing Gl/copper strip buried in ground and giving double earthing to motor, starter, panel board etc. as per IE standards.
F)Capacitor
Supply, erection, testing and commissioning of heavy duty
APF capacitor for the motor to get a power factor above 0.95. The capacitor shall confirm to IS 2834
G)Valves
Supply of suitable size best quality heavy duty ISI marked CI
double flanged sluice valve and Non retum valve of 150 mm dia. 1.60 PN pressure rating. Fitting of valves shall include proper RCC support , for Non return valves and Sluice Valves , of reputed make.
H)Suction and delivery pipe connections
Supply and fitting of 150mm dia. best quality C class GI erection pipe, for a total length of 10 m. suitable for the above pump set with suitable flanges, bends, nut and bolts IR sheet packing etc. complete (erection pipe shuould be of 2m each with flanged joints, welded firmly inside and out side for the flange, to hold the heavy load, and for facilitating lifting and erection of motor inside the pump house) and connecting the delivery side ofthe pump with the valves and suitable specials to connect with the pumping main.
I)General Conditions
Warranty - 2 years (rate inclusive of 2 year warranty and maintenance during a period of 2 years from the date of commissioning), for Motor pump set and acessories
supplied. | - | set | - | - |
| 1.03 | Supply and installation of 185 Sq mm XLPE cable of 3.50 core additional cable | - | metre | - | - |
| 1.04 | Supply and installation of 25 Sq. mm additional cable beyond the initial supply of 2x10 m | - | metre | - | - |
| 1.05 | Supplying, conveying and fixing GI pipes of Class C complete with G I fittings including all cost of cutting, sand papering,welding, clambing etc complete- 150mm dia nominal bore. Fabrication work for connecting with the existing pumping main beyond the initial supply of 2x10 m | - | metre | - | - |
| 1.06 | Painting of OHSR, Well and Pump house
Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and
staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be
stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge.
Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works | - | sqm | - | - |
| 1.07 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 1 | sqm | - | - |
| 1.08 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 1 | sqm | - | - |
| 1.09 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 1 | sqm | - | - |
| 1.1 | Water Quality Testing &Lettering
Testing water sample from the source of scheme at any Government laboratory and submitting the report- both physical and bacteriological parameters. | - | no | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
formatedkre1.pdf
Other Document • 0.30 MB
tenderdocumentedkre1.pdf
Tender Documents • 6.60 MB
BOQ_1437576.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .