| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest Bidder | |
| 2 | L2₹14.2 L+₹6.8 L (92.0%)Rejected-AOC | L2 | Rejected-AOC 2nd Lowest Bidder | |
| 3 | L3₹22.2 L+₹14.8 L (199.7%)Rejected-AOC | L3 | Rejected-AOC 3rd Lowest Bidder | |
| 4 | L4₹41.7 L+₹34.2 L (461.6%)Rejected-AOC 51 PG ENCLAVE OPP SILVER OAK HOTEL PATEL NAGAR CITY CENTRE GWALIOR M P | GWALIOR | GWALIOR | MADHYA PRADESH | L4 | Rejected-AOC 4th Lowest Bidder | |
| 5 | L5₹42.0 L+₹34.6 L (466.7%)Rejected-AOC C 401 410 KUKREJA CENTRE PLOT NO 13 SECTOR 11 CBD BELAPUR NAVI MUMBAI MAHARASHTRA CBD BELAPUR NAVI MUMBAI THANE MAHARASHTRA 400614 | THANE | MAHARASHTRA | 400614 | L5 | Rejected-AOC 5th Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
15 Oct 2022, 5:30 pmClosed
Executive Engineer on behalf of Executive Director
1st floor, Atulya IT Park, Near Crystal IT Park, Indore
Preparation of Feasibility and Detailed Project Report (DPR) for Development of Industrial Park at Village Semlikakad, Tehsil Suwasara, District Mandsaur
2022_MIDCL_222688_1
5969
Open Tender
Consultancy
Item Rate
61 days
Village Semlikakad
As mentioned in the Tender Document
5 documents required · 5 mandatory
₹5,900
₹50,000
9 Dec 2022
17 Sept 2022
17 Oct 2022
17 Sept 2022
15 Oct 2022
19 Sept 2022
Amount
Detailed Survey, Contouring, Structure demarcation, Preparation of Layout Plan of Land boundary at field with the help of Digital Global Positioning System(DGPS) /modern techniques at project site with necessary markings by superimposing the Khasra Map provided by MPIDC RO Indore over actual field survey with demarcation of all plots, roads & demarcation of any other as per requirement at site as directed by engineer-in-charge including fixing of Cement Concrete Poles for the Demarcation work including the cost of Cement Concrete poles with concreting & labor charges, etc. complete. It also includes the demarcation of boundary for whole area with the excavation work of drains of size 2X2 Ft. with the help of JCB including cost of diesel, labour and all T&P charges like JCB, etc. The work also includes Physical & topographical survey, Contour Work grid by grid with location of plots according to survey reports and its approval i/c internal roads, Drainage system etc. and preparation of detailed estimates for all works complete and approval of layout plan from Town & Country Planning department/any other Competent Authority as per state govt. rule. Preparing of site plan in soft copy (using Auto Cad) in suitable scale as desired by engineer-in-charge duly indicating north direction. Rates includes providing 1 digital copy and three hard copies, khasra map (provided by department) duly showing the land and location plan (index plan) and google image of the land. Rates are inclusive of transportation charges, approval of plan from MPIDC /Competent Authority and all prevailing taxes.
b). Preparation & Finalization of 24 Mtr. Wide Road Alignment (Length approx. 2 Km from Ujjain-Garoth Road and alternate option Length approx. 2 Km from Suwasara Tehsil Main Road and may vary or required as per site conditions) including but not limited to Proposal of Land Acquisition, L-Section, Cross-section of Road, Cross Drainage design & detail including Demarcation & Contouring with Cement Concrete Poles etc. complete and as per requirement at site as directed by Engineer-in-Charge.
c). Preparation of Estimate with design & drawing for establishment of 1.00 MLD Water Supply Scheme for proposed industrial park including all essential survey & planning required structures as required by Engineer in Charge
Preparation of Feasibility Report and Detailed Project Report (DPR) for the Development of Industrial Park at Semlikakad, Dist. Mandsaur: a) To prepare detailed Drawings of road network, water supply scheme, Street Lighting with Power Distribution arrangement, Sewer Lines, hydraulics & design of Storm Water Drain, cost estimation for construction of above works, preparation of HT Electrical works including 33 KVA S/s , 33 & 11 KVA power lines, distribution transformers, LT lines approved from MPPKVVCO Ltd. etc. complete. The design of various components mentioned in point no 01 should confirm relevant IRC code, IS code, Water supply manual, MSW rules supported with L section, X section and soil testing etc. The cost estimation shall be prepared based on the current SORs prevailing in MP Government with due diligence in escalation of cost. The DPR should contain the various suggestive mode of execution of project b) The detailed survey, location plan & cost estimation for relocating existing utilities shall be prepared based on the current SORs prevailing in MP Government with due diligence in escalation of cost.
RAKESH GANGRADE
GREEN DESIGN AND ENGINEERING SERVICES PVT. LTD.
M/s Engineering Consultancy Services
M/s. AAKAR ABHINAV CONSULTANTS PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .