| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC CHEMPANODA KATIKULAM ROAD PERAMBRA KOZHIKODE DISTRICT KERALA | KOZHIKODE | KERALA | 673525 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.7 L+₹85,446.48 (14.7%)Rejected-AOC 22045 R 100 M S PANJIPILLAI GINDADA P O KERALA | IDUKKI | KERALA | 685501 | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.3 L+₹51,986.47 (8.94%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹6.8 L
EMD Value
₹17,071
Closing Date
25 Jun 2024, 6:55 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer KyIP Canal Sub division Vatakara
Chettiamparambu Canal palam Kadameri-Ayancheri across Thiruvallur Chettiamparambu Canal palam Kadameri-Ayancheri across Thiruvallur Distributary canal Ch.1.125 km General Civil Work
2024_Irrig_676462_1
IRR/PI/TR/1614/2022_5_7_6/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Kadameri
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,510
Yes
₹17,071
Yes
10 Oct 2024
18 Jun 2024
27 Jun 2024
18 Jun 2024
25 Jun 2024
18 Jun 2024
18 Jun 2024 - 25 Jun 2024
Amount
Culvert
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsAbove 20 cm wide
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD7946/2024-2025:Supplying, stacking spreading and consolidating og quarry muck inside the treanch in canal bed, road works etc including carriage etc complete.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
13.39.1:Colour washing such as green, blue or buff to give an even shade:New work ( two or more coats) with a base coat of white washing with lime
OD24210/2023-2024:Name board of size 75x60 cm installed in appropriate place visible to the public made with granite plaque should be inserted and engraving letters as per the direction of departmental officers at site.
BAIJU
SHAMIR T
Bidder Name
BAIJU
RAJOYJOSEPH PJ
SHAMIR T
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1051839.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .