Chief Engineer [C & O], Wanakbori TPS
Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering Station including design, engineering, erection, testing and commissioning for complete replacement against existing Allen Bradley make PLC 5/60 at U-7 WTPS.
277797
WTPS/S/ET/01/2026/SUPPLY-14 RFQ NO 74925
Open
Miscellaneous Goods
Supply
Kheda
7 documents required · 7 mandatory
₹5,900
GUJARAT STATE ELECTRICITY CORP. LTD. [NEFT/RTGS/online payment -PAYABLE AT BANK OF BARODA WTPS BRANCH]
₹3.0 L
20 Feb 2026
20 Feb 2026
20 Feb 2026
12 Mar 2026
20 Feb 2026
No. Reqd.
SUPPLY(PART-A)
PLC AND SCADA SYSTEM WITH
LATEST OS BASE HMI,
OPERATING AND ENGINEERING
STATION (HARDWARE AND
SOFTWARE) FOR COMPLETE
REPLACEMENT AGAINST
EXISTING ALLEN BRADLEY MAKE
PLC 5/60 AT ASH PLANT AS PER
ANNEXURE-A (SCOPE OF
Works (Part – B)
Work for Design, Engineering,
Erection, Installation, Testing and
commissioning by the latest version
2 of PLC Allen Bradley make and latest 1 Job
OS base HMI and Engineering
station as per scope of work
mentioned in Annexure-C
The overall L1 will be considered as SUPPLY (PART-A) + WORKS (PART-B) = L1 (Total End
Technical Specification:
For item sr. no 1:- PLC and SCADA system with latest OS base HMI, Operating and
Engineering Station(Hardware and software) for complete replacement against existing Allen
Bradley make PLC 5/60 at Ash Plant as per Annexure-A (Scope of Supply). Details of Existing
system is mentioned in Annexure-B.
For item sr. no 2:- Work for Design, Engineering, Erection, Installation, Testing and
commissioning by the latest version of PLC with latest OS base HMI, Operating and
Enginnering station as per scope of work mentioned in Annexure-C (Scope of works).
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Delivery period:
Supply: 20 weeks from date of issue of LOI.
Works: After receipt of all the materials at WTPS, complete work of erection, installation testing
and commissioning within 20 days of AOH / COH or in short shutdown of the unit. The date for
shutdown will be intimated in prior by letter / email, it may be in short time notice.
Note: However, Validity of the order will be for 24 months from date of final PO.
Notes to Bidder:
1) All erection, installation, commissioning and testing is to be carried out as per the manual of
OEM (Original Equipment Manufacturer) and instruction of Engineer in- charge of plant.
2) All required tools, consumables, calibration instruments required for testing, checking of
supplied system must be brought by party. Mechanical/electrical work, welding/cutting and other
required material/ spares if any for successful installation & commissioning shall be in bidder's
3) All above items are indicative only. Any Components / Software not mentioned in above but
absolutely required for complete functioning of the system must be included in offer by the
bidder and will be in Contractor's scope only without any financial implications to GSECL.
4) Bidder may visit the site prior to submission of firm offer to confirm the feasibility and functioning
of offered system as per GSECL requirement to avoid any technical issue during execution.
5) Other than OEM, bidder has to furnish latest valid OEM authorization certificate.
6) Bidder has to submit test/ calibration certificate along with supply / Test report after successful
installation and commissioning of system.
7) Payment Terms:
a) For Supply: (i) 70% FOR destination payment within 45 days on receipt of materials at site in
good condition. (ii) 20% FOR destination payment within 30 days after successfully installation
& commissioning work. In case reason of the delay in installation & commissioning work is not
attributable to Contractor, the 20% payment will be released within 60 Days of the supply.
(iii)10% FOR destination pay on submission of PBG (performance bank guarantee) for
guarantee period. (iv) No advance payment shall be made. (v) The amount of GST & applicable
cess will be kept under retention till submission of documentary proof of payment of GST or till
reflection of payment of GST pertain to respective bill amount in GST Return for concern order
after due verification.
b) For Works: (i) 100% payment of works portion will be released after successful installation,
testing, commissioning & handing over of the system and against submission of tax invoice. (ii)
The amount of GST and applicable cess will be kept under retention till submission of
documentary proof of payment of GST or till reflection of payment of GST pertain to respective
bill amount in GST Return for concern order after due verification.
8) Guarantee/Warrantee: If the goods, stores and equipment‟s found defective due to bad design
or workmanship the same should be repaired or replaced by you free of charge if reported
within warranty period of 12 months from the date of commissioning of equipment. Party will be
responsible for the proper performance of the Equipment‟s / materials / Complete PLC /SCADA
system after successful installation and commissioning for the respective guarantee / warranty
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
ANNEXURE–A
(Scope of supply and Basic system configuration)
Sub: Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering Station
including design, engineering, erection, testing and commissioning for complete replacement
against existing Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit no. 7, WTPS.
S.No. Description Qty UOM
Supply of PLC and SCADA system with latest OS base HMI, Operating
and Engineering Station including design, engineering, erection,
testing and commissioning for complete replacement against existing 01 Set
Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit no.
WTPS (Hardware and Software)
System Technical specifications of system
Description
1) Hot Backup Fast and Powerful Controller with 64 MB Memory
Redundant (EEPROM inbuilt) – Protocols- Modbus, Ethernet, Profinet
2) controller Energy Pack for CPU
Back up Module and Back up Exp. Module against
Existing Back up Module 1785 BCM and 1785 BEM
3) respectively.
NOTE:- Requirement of this module will be as per
system supplied and it may vary for different OEM but
existing features must be included in supplied system.
4) Hardware I/O Profinet Scanner Module (Actual requirement will be as
nodes per system requirement to cover all I/O)
5) Power Supply Module (Actual requirement will be as per
system requirement to cover all I/O)
6) Digital Input 32 Channel digital Input Module (redundancy will be
required to be maintained as per existing system)
7) Digital Output 32 Channel digital Output Module (redundancy will be
required to be maintained as per existing system)
8) Analog Input 8 Channel Analog Input Module (redundancy will be
required to be maintained as per existing system)
9) Analog Output 8 Channel Analog Output Module (redundancy will be
required to be maintained as per existing system)
10) Input Output Carrier base for Digital and Analog I/O Module (As per
Carrier Base system requirement)
PLC Control PLC Control Panel with Enclosure, Panel wiring, Panel
11) Panel with Earthing, all require accessories like redundant SMPS with
Enclosure diode o-ring board, Auxiliary Relay for DO – 1796 nos.
Diode TB for redundant DI & DO splitting, Relay cards for
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
DO, terminals, Fuses, Lamps, Push buttons and MCBs,
Indication lamp, Exhaust Fan, door limit switch, utility
socket etc.
NOTE:- Net requirement will be as per system supplied
to accommodate all existing system. Net requirement
may vary for different OEM but it should cover all
equipment’s supplied against existing system.
12) Relay Relay for DO
Computer PC for Server and operations (Engineering and
System & Operating Stations):
Accessories DELL / HP / LENOVO commercial grade computer
13) system, core i5 processor, 8 GB / 16 GB RAM, 1 TB HDD,
24" inch LED TFT Monitor, Licensed Operating System,
USB Keyboard and Mouse, DVD R/W drive, 2*10/100
Mbps LAN interface, Licensed Anti-Virus Software.
14) Network 16 port Ethernet switch
Components
15) Activation Dongle
Ethernet CAT 6 UTP standard cable, RJ 45 connectors,
Profibus connectors, Profibus cable ( D-link or any
16) standard make which has been supplied in GUVNL and its
subsidiaries companies)
requirement
NOTE:- Net requirement will be as per system supplied
for proper functioning of PLC / SCADA system.
17) Console Desk Computer Desk
PLC and PLC and SCADA software Soft License (Latest version) for
18) SCADA 1 Engineering Station and 1 Operator station with license
Software dongle for USB support
19) Manual System Manual system for operation in case of failure of PLC /
for operations SCADA system as per Existing system
20) Annunciation Annunciation system will be supplied and installed against
System existing annunciation system to cover all fascia
Other Any Hardware, tools-tackels and consumables required for
necessary successful erection and commissioning of complete
21) hardware systems against Existing PLC /SCADA system.
tools-tackels
consumables
NOTE:- 1) Any Components/ Software which are not mentioned in above but absolutely required for
Successful commissioning and complete functioning of the system must be included in
Offer by the bidder and will be in Contractor's scope without any financial implications to
2) Requirement of DI / DO is mentioned as per 32 channel and for AI /AO is mentioned as
per 8 channel but actual quantity may differ as per channel considered by OEM. It should
consider all DI/DO/AI/AO of existing system including Redundant I/O.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
3) Requirement of materials will be as per system supplied (OEM) and it may vary for
different OEM but all existing features must be included in supplied system
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
ANNEXURE–B
(Details of Existing PLC and SCADA system at Ash Plant of Unit No. 7 WTPS)
Sub: Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering Station
including design, engineering, erection, testing and commissioning for complete replacement
against existing Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit no. 7, WTPS.
Sr. Description Qty
1 PLC 5/60 1785 L60 B + Battery
2 EEPROM Module 1785 ME 64
3 Back – up Exp. Module 1785 BEM
4 Back – up Module 1785 BCM
5 Processor Power Supply 1771 P4S
6 Processor Rack 1771 A1B
7 I/P Module 1771 IBD + WH
8 O/P Module 1771 OBD + WH
9 Analog I/P Module 1771 IFE + WG
10 Analog O/P Module 1771 OFE2 + WC
11 I/P Rack 1771 A4B
12 Rack Power Supply 1771 P7
13 I/O Adapter Module 1771 ASB +WB
14 Power Supply Cable 1771 CP1
15 Data Highway Cable 1770 CD 200 mtr
16 PLC 5 On/Off S/W 9323 L5300 D
17 MMI Software 9301 2SE 2401 D & R (Upgraded in 2013)
18 MMI Software 9302 2SE 3401 R (Upgraded in 2013)
19 Communication Module 1784 KT
20 Communication Cable 1784 CP
21 Station Connector 1770 SC
22 Terminator 1770 XT
23 Aux. Relay 24 VDC, 700 HK 32z24
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Details of Existing SCADA system at Ash Plant of Unit No. 7 WTPS
Part-A: HARDWARE
Detail of Common Hardware for the communication, Engineering and SCADA Computers.
Sr. Description of Hardware Qty
1 4 Slot ControlLogix Chassis 02 No
2 85-265 VAC Power Supply (10 Amp @ 5V) 02 No
3 DH+/RIO Bridge/Scanner Module 02 No
4 EtherNet 10-100M Interface Module (supports 64 TCP/IP 02 No
connections)
5 Cat5e Cable 01 Lot
6 Stratix 2000 Switch, Unmanaged, 5 Copper Ports 01 No
7 HP Make Desktop PC with 21.5” Wide TFT monitor with 02 No
Win-7 operating system.
Part-B: SOFTWARE
Detail of software for the communication, Engineering and SCADA Computers.
Sr. Description of Software Qty
1 RS Linx Classic Single Node 01 No
2 RS Linx Gateway - English 01 No
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
ANNEXURE - C
(Contractor Scope of Works)
Sub: Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering
Station including design, engineering, erection, testing and commissioning for complete
replacement against existing Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit
no. 7, WTPS.
The scope of work covers complete replacement of Ashplant ESP PLC and SCADA system consisting
PLC controller, Rack module, CPU controller, I/O Adapter Module, Back up scanner module, Input
Module, Analog I/O Module, Engineering Station and other accessories (Hardware and Software) by
latest updated Allen Bradley / GE/ EMERSON / ABB or any standard make which has been supplied to
GUVNL and its subsidiaries companies with latest OS base HMI and Engg. station in Ash Plant Unit-7,
TECHNICAL TERMS AND CONDITIONS:-
1. Contractor shall have to undertake the complete design, engineering, manufacturing, supply,
packing, loading, forwarding, transportation, unloading, storage, erection, installation, testing,
assembling, documentation, inspection with system configuration, software loading, software
licensing, data extraction from existing system, commissioning and testing with necessary
training to customer for proposed scheme.
2. Contractor shall have to undertake any modification, alteration work required to install new
system with high degree reliability and retrofitting with the existing system. The new PLC
(Hardware and Software) System should have a future life of more than 15 years without
obsolescence. Contractor shall have to ensure for post guarantee technical support and
availability of spares of each item of supplied system for minimum period of 15 years.
3. Redundancy requirement: The bidder shall incorporate redundancy measures in the circuit
design to ensure continuous operation under any of components (like sensor/ detector etc.) or
subsystem failure.
4. Redundant I/O will be provided by Supplier as per existing system.
5. Programming, Monitoring / Data Logging, Controlling, backup facility is required in newly
proposed PLC and SCADA system.
6. Contractor has to supply and install all of the equipments against complete replacement of
existing system will be supplied and should be accomodated in their Panels. All relays and
annuciation system should be required to be considered as per existing system. Also existing
manual system in case of failure of PLC /SCADA system will be also provided and installed.
7. Panel Wiring, Earthling at Site if required, Laying Of communication cable between PLC Panels,
OWS - EWS (Inside Control room) will be in Supplier scope. Earthing inside Panel should be in
Supplier scope.
8. All erection, installation, commissioning and testing is to be carried out as per the manual of
OEM (Original Equipment Manufacturer) and instruction of Engineer- in-charge of plant.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
9. Physical inspection of the supplied items will be carried out by contractor in presence of EIC to
avoid shortage/ damage or breakage of any of the equipment/ material in the scope of supply.
10. All required tools-tackels, consumables, calibration instruments required for testing, checking of
supplied system must be brought by party.
11. Party has to submit operation and Maintenance Manual, drawing and Test report after
successful installation and commissioning of system.
12. Contractor shall have to Design, erection, commissioning and testing of complete new system
on Turnkey basis. Mounting of sensors if required, Cable laying and termination, cable tray, JB
mounting shall be done as per standard practice. All the arrangement and material require, any
modification / fabrication / welding work require for mounting of sensors / JBs / signal
conditioners as per site requirement for safe area installation are in contractor‟s scope.
13. Existing Electronic earth pit shall be utilized for new system. If new earth pit is required, the
same shall be in contractor‟s scope. As well as all the materials and cables shall be in the
contractor‟s scope.
14. The HMI software should support user friendly Data Base Management as well as Graphic
Editor. In which user can create new data, modify data in the data base and create/modify
15. The HMI software should support 1:1 functionally with existing one. All supplied software should
be of lifelong licenses.
16. All PC based system and associated network would have adequate soft security system
antivirus etc. Enough measure is to be taken to protect from out-world hacking of computers,
DDC system keeping in view of machine security as a prime concern.
17. The VPC, Video Process Control function should be available through mouse i.e. all commands
to drives shall be issued with mouse. This VPC command can be performed from the Plant
Schematic Display as well as VPC group display as per the existing system. Operation of all
drives of Ashplant ESP, WTPS Unit No. 7 from OWS station should be performed by
operational persons.
18. Contractor shall have to credit hardware/ software supply material to WTPS main store as per
P.O. Bidder has to verify all supplied material in presence of EIC for clearance of checking note.
Shifting of all new material from main store to site is in Bidder‟s scope. Dismantling / Removal of
old system for mounting the new system is in the scope of Contractor. The dismantled /
removed items are to be handed over to GSECL Department store / Main store as per
instructions of engineer in charge.
19. Contractor may take visit of the site if he so desires on any working day for estimate of the work
involved and to study the existing system software facility and hardware architecture layout
before bidding.
20. Contractor shall test and check all field sensors as per standard test procedure.
21. The delivery of the material should be F.O.R. destination i.e. at GSECL, Wanakbori TPS store.
22. Material not mention under Annexure-A, but required for successful commissioning, execution
of the work shall be arranged by Contractor without any financial implications to GSECL.
23. During commissioning or after commissioning any minor modification, alteration, addition if
required looking to the better performance of the system or Plant as well as operator reliability
has to be carried out without any further financially implication. No alterations/modifications are
envisaged in the existing logics / application programs which may result in any degradation in
performance of the system.
24. The permission of erection work shall be given during AOH (Annual Overhauling) / COH
(Capital Overhauling) of Unit No. 7. This will be informed to you at a short notice. The vender
shall have to complete the work of erection, testing, commissioning within this short time of
around 10 days, after the material has reached the site. Contractor shall specify the total
duration of time for completion of erection, testing & commissioning work expected to be taken
by him during on-load operation of the machine and machine shutdown.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
25. Training: Contractor has to provide free of cost minimum 3 man days hands on training at site
for the entire Desk Engineers / Operators of Plant Operation on the new PLC system for the
efficient plant operation and maintenance.
26. Contractor shall have to provide a guarantee that the goods/ equipments are new, latest and of
high quality at the time of supply and free from defects in design, material and workmanship,
complete in all respects confirming to latest revision.
27. Contractor shall have to arrange sufficient experienced Engineers / Supervisors / Technicians
for carrying out the work in stipulated time with proper co-ordination and as per instruction of
Engineer-in-charge.
28. Contractor shall have to comply with factory act, Labor laws and safety laws in force time to
29. For any ambiguity and conflict, the decision of the Chief Engineer (GEN.), GSECL – Wanakbori
TPS shall be final and binding to Bidder.
30. Subletting: There will be generally no objection on the component parts of the works being
given over to responsible sub-contractors but it must be borne in mind that this department
would under no circumstances recognize these sub-contractors and responsibility of executing
the work in accordance with the condition of the contract will entirely rest on the main
contractor. The main contractor will therefore always has the very responsible member
preferably a technical hand, present on the works with power to sign all work order issued on
the site of work and to take requisite actions in the interest of very efficient execution of works.
31. If Contractor persons meets with any accident at customer premises during work or ill or
becomes ill during the stay at site, GSECL shall provide available necessary medical attention
at GSECL Hospital on chargeable basis.
32. Accommodation in Engineer‟s Hostel if required will be provided on chargeable basis as per
availability
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
ANNEXURE – D
(Other Terms & Conditions)
Sub: Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering Station
including design, engineering, erection, testing and commissioning for complete replacement
against existing Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit no. 7, WTPS.
Note to Bidder:
1. Contractor shall have to submit following documents of PLC control System in 3 sets after
completion of commissioning:
(a) General Arrangement (GA) as-built drawings, (b) Controller Manual, (c) P&I Diagram with
system configuration (d) Bill Of Material (e) Power and Signal distribution Diagram (f) Cable
2. Contractor shall have to arrange Functionalilty Test at their works for witnessing PLC Systems by
C&I Personnel form M/s. GSECL before dispatch. Accomodation facilities to be arranged by
contractor at free of cost. The same shall be dispatched after receipt of GSECL material dispatch
clearance and as per supply schedule.
3. For any queries contractor may visit at site before submission of the bid if required.
4. The contractor will also be responsible for any damages caused to the GSECL property by his
Personnel during the execution of above work. In such cases, the contractor will arrange to repair /
rectify or will pay such amount to GSECL as may be decided by the competent authority of
5. The Contractor shall provide at his own, required PPEs of standard make SI approved to his staff
during work execution and it will be his responsibility to see that the same are used by his staff
while at work.
6. The Contractor should strictly follow the instruction of GSECL‟s Engineer-in-charge for execution of
7. Any modification in existing System, any civil works required for successful commissioning of
complete PLC system in contractor‟s scope.
8. Contractor shall have to undertake any modification, alteration work required during installation of
new PLC system.
9. Contractor shall have to provide a guarantee that the goods / equipments are new and of high
quality and free from defects in design, material and workmanship, complete in all respects
confirming to latest revision.
10. Contractor shall have to arrange Labor, tools tackles and other consumables for carry out
erection, testing and commissioning work. However, GSECL will provide power supply.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
11. Contractor shall have to arrange sufficient experienced Engineers/ Supervisors/ Technicians to
carrying out the work in stipulated time with proper co-ordination and as per instruction of
Engineer-in-charge.
12. The offered rates are including Transportation, hotel accommodations, meals, permits and
customs fees. M/s. GSECL may provide the hostel accommodation for commissioning engineers
on chargeable basis if available.
13. All type of required consumables for execution of work shall be arranged by contractor.
14. Contractor shall have to arrange training at site/ contractor‟s works for GSECL Engineers and
Technician staff. The same shall be in contractor‟s scope.
15. For Erection & Commissioning work, contractor may engage sub contractor / subletting agencies
having valid PF code and other required documents, only after prior approval of GSECL.
16. Contractor shall have to submit necessary legal documents i.e. (1) Workmen compensation (WC)
Policy (2) Copy of PF code (3) Copy of PAN Number, (4) Copy of PF challan with ECR, (5) GST
registration certificate etc. as per factory rules/ labour law for during E & C works.
17. Contractor shall have to comply with factory act, Labor laws and safety laws in force time to time.
18. Contractor shall have to follow the safe practice against hazardous and unsafe working conditions
and shall comply with the safety rules to avoid any accidents to any person in force from time to
time of GSECL - WTPS. For any accident, injury fatal or non-fatal to any worker/person during
work execution for the compensation contractor will be held fully responsible in all ways. GSECL
will not pay any compensation in such cases to the contractor‟s persons.
19. All materials that contractor brings for the work should be entered in the power house premises
through GSECL's procedure. Contractor must get separate entry pass for tools / tackles and
consumable items or any components/ equipments and produce one copy of such entry pass to
Engineer-in-Charge of concern for their verification/ record. If work is found unsatisfactory or not
progressive, the GSECL may take such action seems fit to see that work is completed in time at
your risk and cost.
20. For any ambiguity and conflict, the decision of the Chief Engineer (C&O), GSECL - WTPS shall be
final and binding to contractor.
21. Contractor has to arrange to collect all the supplied material from Main Store of GSECL to erection
site for erection of the same.
22. Tender Fees (Mandatory): Tender fee (Non-refundable) plus GST as applicable notified in the
tender notice should invariably be paid by contractor.
23. Earnest Money Deposit (Mandatory): Contractor shall have to pay EMD (Refundable) as
applicable notified in the tender notice.
24. Security Deposit: Contractor shall have to pay the security deposit at 5% of the order end cost
value. Security Deposit (Refundable) should be paid invariably within 10 days of receipt of LOI.
The detailed Purchase Order will be issued only after remittance of Security Deposit. The amount
of SD will be refunded by GSECL after successful execution of supply and works.
25. Performance Bank Guarantee: Contractor will have to pay PBG of 5% of order value (End Cost).
The PBG shall valid up to completion of guarantee period. The same shall be released on end cost
on completion of guarantee period of respective unit.
26. Payment Terms:
(a) For Supply: (i) 70% FOR destination payment within 45 days on receipt of materials at site in
good condition. (ii) 20% FOR destination payment within 30 days after successfully installation &
commissioning work. In case reason of the delay in installation & commissioning work is not
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
attributable to Contractor, the 20% payment will be released within 60 Days of the supply. (iii)10%
FOR destination pay on submission of PBG (performance bank guarantee) for guarantee period.
(iv) No advance payment shall be made. (v) The amount of GST & applicable cess will be kept
under retention till submission of documentary proof of payment of GST or till reflection of payment
of GST pertain to respective bill amount in GST Return for concern order after due verification.
(b) For Works: (i) 100% payment of works portion will be released after successful installation,
testing, commissioning & handing over of the system and against submission of tax invoice.
(ii) The amount of GST and applicable cess will be kept under retention till submission of
documentary proof of payment of GST or till reflection of payment of GST pertain to respective bill
amount in GST Return for concern order after due verification.
27. Penalty Clause:
Any delay occurring in supply and/or erection, testing, commissioning activities beyond contractual
cut-off date/stipulated period of the order shall be subject to penalty (not liquidated damages) at
the rate of 0.5 % per week or part thereof on delayed portion subject to maximum 10% of the final
order value for both supply and works. For calculating the delayed portion, date of actual receipt of
material at store shall be considered. GST will be charged on penalty amount.
28. If work is found unsatisfactory or not progressive, the GSECL may take such action deemed fit to
see that work is completed in time at your risk and cost.
29. GSECL shall not be responsible for any injury or accident to the person of contractor while
working. He should take risk policy as per rules.
30. The contractor shall have to comply all safety rules, Labour Laws, security rules and regulation of
31. Guarantee/Warrantee: If the goods, stores and equipment‟s found defective due to bad design or
workmanship the same should be repaired or replaced by you free of charge if reported within
warranty period of 12 months from the date of commissioning of equipment. You will be
responsible for the proper performance of the equipment‟s / materials / Complete PLC /SCADA
system after successful installation and commissioning for the respective guarantee / warranty
32. Work experience: Contractor has to submit performance certificate of similar type of installed
sytem and copies of executed work orders of similar type of tender subject work in other
SEBS/NTPC/PSUs/ Power generating Units.
33. Employer's insurance: Contractor has to employ manpower duly insured including him for this
work and has to use all safety equipments required. GSECL shall not be responsible for any loss
or accident and other such hazards to any of Contractor's workers or contractor during execution of
this work.
34. Submission of bill: Contractor shall submit the bill in triplicate along with one copy of work
reports, PF challan of employees, sublet contractor presence report etc…
35. Contractor shall have to submit necessary legal documents i.e. (1) Workmen compensation (WC)
Policy (2) Copy of PF code (3) Copy of PAN Number, (4) Copy of PF challan with ECR, (5) GST
registration certificate etc. as per factory rules/ labour law for during E & C works.
36. Terms and Conditions: The general rules and regulations of the GSECL for tender and contract
for works shall be applicable.
37. Time Limit for Supply & works:
Supply: 20 weeks from date of issue of LOI.
Works: After receipt of all the materials at WTPS, complete work of erection, installation testing
and commissioning within 20 days of AOH / COH or in short shutdown of the unit. The date for
shutdown will be intimated in prior by letter / email, it may be in short time notice.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Note: However, Validity of the order will be for 24 months from date of final PO.
38. Purchase Agreement: The contractor shall have to enter into a „Purchase Agreement‟ with
GSECL. This purchase Agreement has to be executed on non-judicial stamp paper of Rs.300/-
duly notarized. The cost of non-judicial stamp & Notary charges will be borne by contractor.
39. Indemnity Bond: The contractor have lo sign lndemnity Bond on non-judicial stamp paper of
Rs.300/- duly notarized towards execution of contract against A/T./ purchase order. The cost of
non-judicial stamp & Notary charges will be borne by contractor.
40. All Other terms and conditions will be as per prescribed rules and regulation of GSECL prevailing
from time to time. Contractor shall have to follow/ observe all the other terms and conditions
mentioned in General terms and conditions, Labour laws, Safety rules etc.
41. Arbitration clause: All questions, disputes OR difference, whatsoever which may at any time arise
between the parties to this contract in connection with the contract or any matter arising out of or in
relation thereto, shall be referred to the Gujarat public works contract Dispute arbitration as per the
provision of the Gujarat public works contract Dispute Arbitration tribunal Act-1992.
42. Budgetary offer should be valid for a minimum period of 120-Days.
43. The Contractors shall have to obtain Photo-Gate-Pass as per GSECL‟s standard Gate-pass
procedure before the commencement of contractual work Awarded.
44. Subletting: There will be generally no objection on the component parts of the works being given
over to responsible sub-contractors but it must be borne in mind that this department would under
no circumstances recognize these sub contractors and responsibility of executing the work in
accordance with the condition of the contract will entirely rest on the main contractors. The main
contractors will therefore always have the very responsible member preferably a technical hand,
present on the works with power to sign all work order issued on the site of work and to take
requisite actions in the interest of very efficient execution of works.
45. This contract or any part thereof shall not be assigned to any other party without written permission
from GSECL. In case of subletting contract, all PF related documents, GST no. & WC Policy etc.
shall be required.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL CONDITION OF CONTRACT HR-SECTION, CIRCULAR - I, CIRCULAR - II, SAFETY
The following are the major obligations to be fulfilled by the Contractors as per the Contract Labor (R&A)
Act 1970 and rule mentioned there under:
1) The contractor should not be allowed to engage ten or more contract labours without initiating to
obtain the labour license under the Contract Labour Act from the Assistant Commissioner of Labour
Nadiad (the said number i.e., Ten or more includes Supervisor and other staff.).
2) The contractors shall have to obtain group insurance under WC Act before starting the work.
3) All Contractors shall have to make the payment of wages to the Contract Labours engaged by them,
on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated
in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The Contractor shall
supply copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards
payment of Wages to HR Department.
4) Payment to contract laborers has to be made through Bank/ Cheque / RTGS only. Wages rates for
contract laborers are applicable as per the terms and conditions of the license. The contractor shall
have to pay wages to workers as notified by Government of Gujarat., from time to time.
5) It should be ensured that all the labours engaged by contractor are covered under the provident fund
scheme and employee‟s pension scheme and their contribution are remitted regularly to the
concerned RPFC. The Xerox copies of challan along with ECR in this regards should be submitted
regularly in G.S.E.C.L. office.
6) In case the contractor having more than one contract in the same TPS, the contractor shall have to
submit contract wise separate list of the workmen to the concerned Officer.
7) The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time
The above instructions should be followed scrupulously to avoid undue litigation for non compliance of
Labour Law.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
GENERAL CONDITIONS OF CONTRACT:
(1) LABOUR LAWS
1. Person below the age of 18years and above 60 years should not be employed for the work.
2. No female worker shall be employed in the night shift between 7.00 P.M. to 6.00 A.M.
3. The contractor shall maintain a valid labour license under the contract labour (Regulation and
Abolition) Act for employing necessary man power to be required by contractor. In the absence
of such license the contract shall be liable to be terminated without assigning any reasons
The contractor shall at his own expense comply with all labour laws and keep the G.S.E.C.L.
Indemnified in respect thereof. Some of the major liabilities under various labour and industrial
laws, which the contractor shall have to comply, which are as under:
a. Payment of contribution by way of employee‟s contribution towards provident fund, family
pension scheme, deposit linked insurance scheme, administrative charge etc., at the rates
made applicable from time to time by Govt. of Gujarat/Govt. of India and other statutory
authorities.
b. Payment of deposit in respect of each contract labour at the rate applicable of with the offices of
Commissioner of Labour as per the contract labour (Regulation and Abolition) Act.
c. License fee as prescribed under the contract labour (Regulation and Abolition) Act and rules
framed there under depending upon the number of workmen employed by contractor.
d. Identity cards as prescribed under the factories Act shall be issued to workmen.
e. Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial
Disputes Act. Any payment to the contractor's employees arising out of any claim or disputes
under the Industrial Dispute Act 1947 or any other labour laws.
f. Payment of compensation in case of accidental injury shall be made as per the WC Act.
g. If the female workmen are more than 30 numbers engaged then provision of crèches, shall be
complied accordingly.
h. Maternity leave as per the provision of the maternity benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities prescribed
under the various labour laws in force from time to time from statutory Authorities like State
Government / Government of India, which the contractor shall have to comply with.
2) PROVIDENT FUND AND FAMILY PENSION SCHEME: The contractor shall submit along with his
bill (month wise) statement regarding deductions against employees‟ provident fund and family
pension scheme in respect of each concerned employee. Provident fund and family pension
scheme at the rate of 12 % of wages (or at the rates made applicable by the Government time to
time). The contractor‟s contribution and his workers contribution towards provident fund and family
pension scheme shall deposited by the contractor with Regional Provident Fund Commissioner,
Ahmedabad. In case if the contractor deposits the contribution to the Assistant Provident Fund
Commission, the photo copy of challans and schedule must be submitted in the office. For
maintaining the CPF Acct. of contractor‟s employees the contractor will have to pay administrative
charges as applicable of the emoluments of the employer of the contractor's every month.
3) GROUP INSURANCE SCHEME: The contractor has to take Group Insurance for all workmen
engaged by him and copy of the same shall be produced to Concerned Officer.
4) PAID LEAVE FACILITY: Paid leave facility at the rate of one day for every 20 days worked by the
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
contract, labour shall be provided the contractor to his workers. It shall be duly verified and
approved/certified by the authorized officer of the GSECL.
5) The contractor shall employ adequate number of experienced staff at site for daily supervision and
for maintaining of various registers and records required under the law and contracts. No payment
for such supervision shall be admissible.
6) CONTRACTOR TO INDEMNIFY THE GSECL: The contractor shall indemnify and keep indemnified
the GSECL, and every member, officer and employees of the GSECL, also Engineer-in-charge and
his staff against all actions, proceedings, claims, demands, costs and expenses whatsoever arising
out of or in connection with the matter referred in above clauses and elsewhere and against all
actions, claims demands, cost and expenses which may be made against the GSECL by any
workman/ employees of contractor or any sub contractor and or from any liability any wise to any
workman/employees of the contractor or sub-contractor under any laws, rules or regulation having in
force of law including but not limited to claims against the owner under workmen compensation Act,
1923. The Employee‟s Provident Fund Act.1952, and/or the contract labour (Abolition and
Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to any
workmen or other person in the employment of the contractor or his sub-contractor, and the
contractor shall indemnify and keep indemnified the GSECL against all such damage and
compensation and against all claims, demands proceedings costs, charges and expenses
whatsoever in respect of or in relation thereto.
07) WORKMEN'S COMPENSATION & EMPLOYER'S LIABILITY INSURANCE: Insurance shall be
affected for all the contractor‟s employees engaged in the execution of these contracts. If any of the
work is sublet, the contractor shall required the sub-contractor to provide workmen's
compensation and Employer's liability insurance for the latter's employees unless such
employees are covered under the contractor‟s insurance. It shall be liability of contractor for
employees of his sub-contractor.
08) Any other rules and regulation, conditions, Circulars etc., that are in force at present and that may
be framed by the GSECL From time to time in connection with contracts will be binding and
acceptable to contractor.
09) The contractor must possess separate P.F. code for the above subject work.
10) Attendance rolls shall be maintained up to date. All the written registers, Performa etc…shall be
filled up and maintained up to date and kept ready for inspection at any time or submitted in-time to
the concerned authorities as per contract labour etc. Factory Act. Etc by contractor
11) It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard
will be viewed seriously and contract is liable to be terminated. If any of contractor‟s staff is found
unsuitable or not behaving properly, the contractor shall have to remove him from the work-site on
demand by GSECL. The contractor shall have to strictly observe the rules and conditions specified
in the enclosed works contract booklet of the GSECL, which are not modified hereunder. To keep
harmonious industrial relations amongst contract labours is the sole responsibility of the contractor.
Any breach of the same will be viewed seriously.
12) Before starting the work, the contractor should contact Ind.Relation Officer/Labour Welfare Officer
for all formalities and obtaining the gate passes of all contract labourers and for other formalities.
13) The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed
two years of services for each worker for the liabilities of the gratuity ( * applicable to ARC/BRC
works contract only)
Follow the following procedure at each milestone for the execution of works contract.
(A) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
appl. form which is to be available from Security Section for the entry of workmen in the
(2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining
approval of Competent Authority, contractor shall have to prepare the Gate Passes and obtain
the signature of Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors Can
apply for Temporary Gate-Pass for the period of only three days with recommendation of
respective EE/SE and the same shall have to be regularized after following the procedure of
Gate Pass applications on the office working day from HR Dept. It is to note that No Temporary
Gate Pass shall be issued for the work other than acute emergency to carry out the work in
power station premises.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee
Compensation Act, 1923 prior to commencement of work.
(5) The Contractor who intend to engaged 10 or More than 10 labours to Carry out the awarded
contractual work then necessary - Form No. V under the Contract Labour (R&A) Act,1970/Form
No. VI under the Interstate Migrant worker(employment regulation) rule1979 as applicable is to
be obtained from HR Dept. for the purpose of obtaining Labour License from the Licensing
Authority.
(B) During Contractual Work under the progress:
1) Bill Recording Officer of User department shall have to ensure as to whether contractor has
engaged minimum number of contract workmen per day as per the terms of work order.
2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory,
preferably situated in the premises of Wanakbori TPS area in case of ARC /BRC works
Contract. The Contractor shall supply copy of Bank Statement duly stamped by the Concerned
Bank as a token of proof towards payment of Wages to HR Department.
3) All Contractors has to comply & maintain statutory documents / registers at site under the
provision of labour laws & EPF Act.
(C) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under the
labour laws and EPF to the recording officer of user department for ensuring the compliances of
provision of labour laws and EPF Act for the respective working period.
site (duly signed & stamp by Contractor ) - Form XVI
Copy of Wage Payment Sheet – with signature of workmen, duly signed & stamped by
Contractor - Form XVII
Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank)
Copy of PF Challan along with ECR Statement
Copy of Gate Pass Permission ( duly signed by Authorities )
Copy of Work Order ( First Time )
Copy of Valid W.C. Policy ( First Time)
Copy of Valid Labour License ( If Applicable in case of More than 9 manpower Engaged by
Contractor for said work ) ( First Time)
Form No. XIII – Register of workers employed by Contractor ( First Time)
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Place of Work and Work order no. in Muster Roll- Form No.XVI& Wage Register–Form No XVII.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
CIRCULAR – I
1) The following are the major obligations to be fulfilled by the Contractors as per the Contract Labour
(R&A) Act 1970 and rule mentioned there under. License to be obtained before starting the Work
where number of contract laborers is ten or more.
2) Payment to contract labourers has to be made through Bank/account payee cheque/NEFT/RTGS
only.. Wages rates for contract labourers are applicable as per the terms and conditions of the
license. Minimum rate of the wages for unskilled labour is Rs. 441.00 for Semi-skilled labour and
Rs. 462.00 and for Skilled labour w.e.f. 03-04-2023.
3) Every contractor shall have to maintain the muster roll and wages register in respect of his contract
4) Every contractor is required to issue employment card, wages slip and attendance card to their
labours/personnel.
5) The contractor has to maintain the register No. 13 containing details of contract labours employed
6) Earned leave register/ card as per the Factories Act. And Rules.
7) Other registers required under Contract Labour Rules and the Factories Act. And Rules.
8) Every contractor shall have to obtain insurance policy in respect of the contract labours engaged
by him to cover them under workmen‟s Compensation Act.
9) To send half yearly return to licensing officer as per Rule 82 (1) as per schedule time.
10) Before starting the work as per the contract awarded to him, he should make arrangement to enter
into the agreement in the prescribed format on the stamp paper as applicable. Before fulfilling the
above requirement the contractor is instructed not to start the work. The responsibility will be on his
head in case he fails.
11) Contractor should posses separate P.F. code on their firm, name otherwise their offer may not be
considered.
12) The contractor shall have to pay wages as may be revised from time to time and as may be
declared by Government. All the contractors are informed to adhere to the rules and regulations
applicable to them, particularly in respect of the labourers engaged by them, the contractor not
fulfilling the obligations will not be allowed or continue with work/ not be held qualified to carry out
the work at Wanakbori TPS.
13) The wages of every contract labour employed by contractor under this contract shall be paid by
contractor through bank or cheque before the expiry of 10th day of the last day of the month in
respect of which the wages are payable. The payment of the wages shall be deposited in any
nationalized/Co-operative bank every month and statement for the same shall be produced to the
HR Department every month in token of timely disbursement of the minimum wages.( As per
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
clause no-4 of GUVNL Circular no GUVNL/HR/261 Dtd 11/05/2016 and corporate office circular no
GSEC/HR/IR-II/419 Dtd-23.05.2016)
CIRCULAR - II
It has been directed by our HO that, no new labor contract be entrusted to any agency without getting
prior approval from Member (Administration). Further the existing contract, on their expiry, may not be
extended without approval of the Member (Administration) from HO, Vadodara.
In light of the instruction conveyed by HO, it is necessary to check up the following documents of each
and every contractor before awarding the contract to these contractors. For preliminary checking of
valid contractors, the following documents are required to be checked by the concern DE/EE/SE. On
their checking the same and by recommending the number of labors, gate pass will be issued by the
Sr. Security officer. But before awarding and finalizing any contracts, following information must reach
to IRO for his confirmation the contracts should be awarded.
1. The contractor should not allowed to engage ten or more contract labors without initiating to
obtain the labor license under the Contract Labor Act from the assistance commissioner of
labor, Nadiad (The same number i.e. ten or more includes Supervisor and other staff).
2. Number of days of the contract should be informed first before allowing the contract to start.
Because on the completion of sixty days, the contract labor becomes liable to CPF as per
Provident Fund Act 1952. Hence we should avoid such work as far as possible. The Contractor
also must go for group insurance under WC Act before starting the work.
3. The contract laborers must be paid minimum wages as per notification issued by competent
authority under the said Act from time to time upon issuance of Circular by Chief Engineer,
WTPS. The above instruction must be followed scrupulously to avoid labour liabilities under
Contract labor Act.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
GENERAL SAFETY RULES / NORMS TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged, if
any, by them for the work contract awarded to them. Prior to commencement of the work, Contractor
shall have to submit a written assurance on their letterhead to the concerned Sectional Head /
Engineer-in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their sub-contractor and will strictly observe the said Rules while execution of
work under work contract awarded to them. They will have to indemnify the company for any loss or
damage / accident / injury to the company‟s property / employee or employee of their own in default of
non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager as per
Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass format as per
Aadhar card /Election card id proof & to follow the gate pass issue procedure through concern
department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety
Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers
before commencement of work & examination responsibility shall be taken by contractor as well
as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory Medical Officer after
every six (06) months of contractor with their contractor workers. Contractor shall be fulfilled all
health requirements before commencement of work. After completion of medical examination in
form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker gate pass
procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training, SOP,
supervisor qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety
Officer shall be signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the work
order. Subletting of contract shall be allowed only if prior approval of Power station chief before
execution of work. Contractor/agency shall be submitted the entire subletting contract documents
with gate pass application through concern department EE & SE, LWO/DGM, and Safety
Officer/Dy. Safety Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass by
agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical
License photocopy shall be checked by Concerned HOD of Electrical Department/Electrical Safety
Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
(08) As per nature/requir ementof job/work, qualified supervisor shall be engaged by contract
agency & qualification certificate with experience certificate shall be submitted to concern
EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety Officer/Factory Manager at the time of apply
gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the
work on electrical lines and Apparatus, Contract person/worker possesses a certificate of
competency or electrical work permit, issued by the Appropriate Government. That means,
Electrical trade Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to concern
EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory Manager at the time of apply for
photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7 round
the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor (BE/Diploma
(Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor during
dangerous operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness program, SOP preparation with hazards & its control
measures with each step , checking of lifting tools & tackles, hydra mobile crane, Safety
precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to
follow the Motor vehicle Act, 1988, the Central Motor Vehicles (Amendment) Rules, 2016 as well
as Gujarat Motor Vehicles rules, 1989 & driver license shall be checked every day by security shift
in charge before entry in the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as
per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will
review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipment (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective Equipments
/ Safety Gadgets suitable to give sufficient protection against hazards involved in their work / job to
their staff, as per the job requirement and insist / enforce their workers to put on the same while at
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working
without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved
only) to be used for various works / worksites.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it will
check by concern section HOD &Dy. Safety Officer /Safety Officer at the time of gate pass
procedure.
List of safety equipments
Industrial Safety Helmet For protection of head against falling objects or during fall of
person from height. Yellow Colour helmet is used for
contract worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust, chemical
goggles/chemical splash splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical
splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high
noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged
proximity suit/FR Boiler Suit objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged
objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged
Oil/Chemical/water/heat/ objects, heat, hot metals/objects, electricity etc..
Electrical resistance etc.
Safety Belt(full body hardness For fall prevention while working at heights or in depth,
with double lanyard & shock working in vessel or in confined space.
absorber) / Rope / Life line / Fall
arrestor etc.
Dust Mask/Respirator with Protection of respiratory system against dust.
valve(FFP2)
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases/vapors/dust
with full face mask type etc.
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of confine
( LEL,O2,CO,H2S,SO2, etc) space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of electrical
equipment/ bus/switch gears from 01 (one) feet distance
before starting the any electrical work.
Auto darkening welding helmet The new auto darkening welding helmet combines legendary
(EN 379 & EN 175 Level-B) with Speed glass quality and auto darkening technology with an
PAPR as per EN 12941:1998, innovative wide-view grinding visor to give welders an all-in-
class TH2 and AS/NZS 1716 one solution for more flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter which
removes particles from the air. The unit provides a constant
airflow independent of filter combinations and clogging. The
unit can also be equipped with a gas filter (for example
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
A1B1E1). The unit supplies air to the head top via the
connecting breathing tube. The airflow creates a slight
positive pressure which together with the sealing to the face
prevents particles and other contaminants from entering the
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor
to their contractor workers as per nature of job and allotment of PPE list shall be submitted to
Safety Officer, wtps on his letter head as per below mentioned format by Contractor before
commencement of work through concerned JE,DE,EE/SE . Sub: Issue of PEE to Contractor
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name of Desig Name Name of IS Make Qt Unit Date Receiving
no. workers nation of PPE :Code of PPE y of signature
Section no. of issue
under PPE
01 Safety Nos.
Safety Nos.
Reusable Pair
Dust Mask Nos.
Safety Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per SOP.
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/Environment
survey/Chemical etc measuring /testing equipments/instruments which are used during contract
work shall be submitted before starting the work & shall be checked by concern JE/DE/EE before
starting work & it‟s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & it‟s control measure (mentioned in HIRA) before starting
the job work and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD regarding
any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all the
inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in fire
prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments& fire
extinguishing media / material like sand / water buckets or other appropriate equipment at such
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used.
For taking care of the persons working inside the confined space / vessel, a supervisor / person
capable to keep continuous watch on person(s) working inside, assist them in case of emergency
or arrange to get immediate outside help, shall remain present at entry point. Use full body safety
belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers
etc shall remain available near entry point or the entry point shall be cordoned by a barricaded
tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits
opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of
the work and leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading tape &
display suitable caution notice or keep a person to restrict / divert the traffic on this route through
other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall
be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading tape &
display suitable caution notice or keep a person to restrict / divert the traffic on this route through
other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
(30) The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor‟s Mains Board on which it is compulsory
to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably
be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be
used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three
phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity
& safe to use. All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work
execution shall be of standard make & bear ISI certification mark on it. The consumables like
welding electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be
used in any case if its expiry date is over.
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall be
submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits shall
be checked by JE/DE before commencement of Electrical work.
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it
shall be checked and used only if found safe to use. Also, ensure that these are tested, examined
& certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories
Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to lifting the
weight. Valid Test certificate of all Lifting machines used by Contractor to be submitted to
Dy. Safety Officer/ Safety Officer before commencement of work through concerned EE/SE.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
(33) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard &fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant activities / works except
the work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as
shall not temper / operate / touch the machineries/equipments/auxiliaries with which they are not
concerned. Also, the contractor shall strictly instruct their staff for not to sit or take rest
at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous & prone
to accident.
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene,
LPG, Hydrogen, Ammonia, Chlorine, CO2etc shall be handled safely taking due care. To handle /
shift such cylinders a special trolley /cage meant for it must be used but in no case it should be
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapor generated area,
Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each
vehicle by party/agency and it will check by shift security in charge before entry of vehicles in the
factory premises.
(37) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act
(39) In all risky job, before start the work, contractor should obtain General Safety Work Permit through
concerned section from Shift –in-charge well in advance.
(40) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire
Officer or Emergency Control room no which is displayed at prominent place of factory like Main
Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All security
gates, Occupational Health Centre.
(41) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No.
21&ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be
filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
(42) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(43) Safety penalty shall be imposed against Offences by contract workers: If any contract worker
worked in a factory contravenes any provision of Factories act or any rules or orders made there
under ,imposing any duty or liability on workers, contractor/agency shall be punishable with fine
which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
Work without work Safety permit like working at
(ii) Rs.1000/- per day
height, confine space entry, hot work etc.
License of driver as per type of vehicles not
(iii) Rs.750/- per person
registered.
Welding work without flashback arrestor/double
(iv) Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per equipment
Work without qualified Supervisor as per nature of
(vi) job like mechanical, electrical, civil, C&I, chemical Rs.1000/-per day
(vii) Work without SOP & JSA Rs.2000/-per day
Work without test report of lifting machines / tackles
(like C.P.Bs., Hook chooks, winch, forklift, mobile
(viii) crane, EOT crane etc) & its attachments (like D- Rs.2000/- per equipment
shackles, slings, U-clamps, Eye bolts or any fixtures)
in Form No.10 of Gujarat Factories Rules,1963
Work without Double lynyer Safety belt during
(ix) working at Height work, work without anchoring in Rs.3000/-per person
hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
Safety Penalty is to be imposed directly by individual Dy. Safety Officer/Safety Officer/Electrical
Safety Officer and Factory Manager/Occupier against violation of statutory requirements and
penalty will be recovered through RA bill. Photograph/CCTV camera footage is to be put up with
penalty note by imposed individual officer.
(44) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
concern HOD.
(45) All the relevant labour and industrial laws shall also be followed compulsorily.
(46) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap etc.
are to be removed by contractor and scrap shall be deposited to scrap yard of Main Store.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
(47) For performance evaluation of contractor, safety factors of work accident, fire incident & near miss
accident will be considered. Steps can be taken to review the job assignment up to cancellation for
negligence.
(48) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations
/ norms and legal provisions laid down in various statutes. Particularly the provisions of The
Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
obey the rules / regulations / instructions of the local Competent Authority for safety & health
requirements.
(49) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy. Safety Officer/Safety Officer/Electrical Safety Officer in case of
any ambiguity or needs further guidance in this regard.
Chief Engineer (C&O)
GSECL, WTPS
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Section: IMD-7.
JSA for : Supply of PLC and SCADA system with latest OS base HMI, Operating and Engineering
Station including design, engineering, erection, testing and commissioning for complete replacement
against existing Allen Bradley make PLC 5/60 at Ash Plant 1×210 MW Unit no. 7, WTPS.
Risk Responsibili
Job Step Hazard Control Measures
Site survey
and Job Low Wear helmet & safety shoes (PPE use).
Use proper lifting techniques.
Use trolley or crane.
Material Use of PPE and Hand gloves mandatory.
unloading & High Use appropriate web sling according to
shifting weighing capacity.
Personal care should be taken.
Close supervision required.
Use certified lifting tool.
Proper anchoring of panels.
PLC and Panel Barricade work area.
SCADA system positioning & High PPE must be wear.
with latest OS installation Personal care should be taken.
base HMI, Close supervision required.
Operating and PTW must be taken before work execution. Contractor‟s
Engineering Cable tray Supervisor
Use certified safety belt / harness.
Station including installation,
Low Use cable rollers.
design, cable pulling
Housekeeping after work.
engineering, & laying
erection, testing Ensure power is isolated. Verify zero voltage.
and Use insulated tools.
commissioning Electric
Use of ELCB / RCCB in portable electrical
High instrument which is used during execution of
to live/naked
work as well as in electrical extension board.
Three pin industrial Plug to be use.
Close supervision required.
Moder Earthing of system
workstation
ate Certified power sockets.
installation
Electrical clearance & PTW.
Short circuit,
High Standby safety personnel.
Fire extinguisher.
Housekeepin
Clean area.
Restore covers & guards.
completion.
NOTE: Required check list should be filled up by contractor at time of work execution.
Prepared Checked
Reviewed by Approved by
EE(IMD-7) Safety Officer SE (E-II) Factory Manager Chief Engineer (C& O)
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
DECLARATION FORM
ON LETTER HEAD OF SUPPLIER
Subject: Supply of PLC and SCADA system with latest OS base HMI, Operating and
Engineering Station including design, engineering, erection, testing and commissioning
for complete replacement against existing Allen Bradley make PLC 5/60 at U#7 WTPS.
Reference No.:- WTPS/S/TECH/RFQ – 74925/IMD-7
1. I/We hereby declare that I/We have carefully & thoroughly studied the entire tender placed on
the website and General terms & conditions, technical specification, PQR and other documents
of the tender mentioned under reference along with the Commercial terms and conditions.
2. I/We hereby confirm and certify that the offer submitted by me/us is strictly in accordance with
the GSECL‟s Tender specifications, Guaranteed Technical Particulars and drawing as
mentioned in the Tender Specifications. There is no commercial or Technical deviation (except
the deviations shown in respective Annexure-12 of Technical Deviations of this tender
document) in the offer from the Board‟s Tender Specification. I undertake to abide by the
GSECL‟s Technical specification / Guaranteed Technical Particulars / Drawing, I undertake to
supply materials strictly as per the GSECL‟s Technical specification / Guaranteed Technical
Particulars / Drawing, even if any technical deviations are mentioned by me. I also undertake
to abide by all commercial conditions of the GSECL, including delivery schedule. I have
submitted all the annexure-1 to 15,form of integrity pact etc along with the technical Bid dully
filled along with all the details”
3. I / We, hereby declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure-12 of Technical Deviations of this tender document).
4. I / We also agree that additional conditions / deviations, if any, found in the Commercial terms
& conditions (except the deviations shown in Annexure-12 of Technical Deviations of this
tender document) our offer shall be out rightly rejected without assigning any reason thereof.
5. I/We hereby abide to execute the contract agreement & submitted the same along with the
acceptance of LOI and the same will be acceptable to me/us.
6. I/We hereby accept and confirm that any dispute on this regard shall not be entertained by the
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited to
the Corporation, should I/ we do not deposit the specified amount of specified Security Deposit
within 10 Days from receipt of the Letter of Intent.
8. If, I fail to submit all required documents with application or tender copy ( in each tender ) then
my tender will be cancelled, which is binding to me.
authorized signatory of M/s ______________________________________________ here by
certify that M/s _________________________________________________ and their
proprietor / any partner / any directors of the firm is not stop deal and / or banned for business
dealing and / or black listed by GUVNL and / or their any subsidiary company viz. GSECL /
GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as Government and / or Semi
Government company / department.
10. We here by confirm that we have not stake in one or more other agencies / bidders who are
participating in same tender and if it is found that the submitted information / declaration are
wrong in the tender / enquiry as stated in tender terms, than we will be disqualified
automatically &it will be accepted to us. EMD / SD will be forfeited. More over if GSECL shall
take stern action including stop dealing with our firms which is also accepted to us
Seal of the Firm Signature of the Tenderer with Designation.
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
<On the letterhead of the vendor/ payee>
To, Date : __________
Subject : Declaration for TDS/TCS under the Income Tax Act (IT Act)
Reference : Provisions of S. 206AB/ 206CCA/139AA of the IT Act
Dear Sirs,
This is with reference to the determination of appropriate Tax deduction at source (TDS) or Tax
collected at source (TCS) as per the provisions of the Act i.e. Section 206AB/ 206CCA/139AA of the IT
Act. In relation to the said provision of the Act: I / We, having status of <<mention status i.e.
Individual/Company/ Firm etc.)>>hereby declare and confirm that: -
a) I/We have<<mention PAN>>Permanent Account Number (PAN) under the IT Act.(Copy of
PAN card is enclosed herewith.)
b) I/We have linked / will be linking Aadhar number with PAN as required under section 139AA (2)
read with Rule 114AAA.latest by 30th June
c) I/We have/have not filed income tax returns (ITR) for two previous years immediately prior to
the year in which tax is required to be deducted and for which last date of filing of income tax
return is expired u/s139(1) of the Act.
I/ We am/ are hereby attaching a copy of acknowledgment of ITR filed for any one of previous
two financial years of which due date u/s139(1) is expired, as proof of filing ITR. (Strike out full
sentence if not filed IT returns)
d) The aggregate amount of Tax Deductible at Source (TDS) and Tax Collectible at Source (TCS)
exceed/don‟t exceed Rs. 50,000 or more in each of the two aforesaid previous years in my/our
case (Vendor has to provide the extract of its Form 26AS if copy of ITR is not provided as
e) I/ We shall, indemnify the Company for any consequences arising out of any acts of commission
or omission including incorrect declaration basis which the Company would act upon.
I/We agree that Company shall determine applicability of section 206AB/206CCAof the IT Act
based on the aforesaid declaration/documents filed by me/us and would deduct TDS/TCS
accordingly. The decision of Company shall be final and acceptable to me/us. Strikeout
whichever is not applicable.
Thanking you,
Yours faithfully,
<<Signature>>
< Full Name of Vendor & seal >
BIDDER’S SIGN WITH SEAL
RFQ- 74925 Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT -RFQ- 74925 -IMD-7.pdf
TECHNICAL BID -RFQ- 74925 -IMD-7 .pdf
General Commercial Terms and Conditions-n procure.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .