RIJINRAJ K K
OFFICE OF THE ASSISTANT ENGINEER, LID EW SECTION,
Mokeri GP Project No 69/23-24- Homeo dispensary Road Retaring-General Civil Work
2023_LSGD_619863_1
AE/LIDEW/MKY/TNDR/15/2023-24
Open Tender
Civil Works - Roads
Item Rate
180 days
MOKERI GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,505
Yes
₹17,046
Yes
30 Dec 2023
9 Nov 2023
24 Nov 2023
9 Nov 2023
20 Nov 2023
9 Nov 2023
Amount
Road Retaring
3.7:Removal of Unsuitable Soil with Disposal upto 1000 m <br> Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
OD79726/2023-2024:OD19169/2022-2023 Granular sub-base/base/surface course with serviceable material available(departmental material) during scarifying of existing road. Construction of granular sub-base with departmental material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. ( Modified 4.11.2)
4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate 20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 -Packed Bitumen and Shredded Plastic Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508 Case - I By Manual Means (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Subin M P
Bidder Name
Subin M P
SHARANG U
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_931102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .