Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
4 Sept 2026, 3:00 pm
AGM CE, FCI RO WB
FCI RO WB GB BLOCK SALT LAKE SECTOR III KOLKATA 700097
Construction of collapsed/tilted boundary wall with heightening of low height boundary wall and provision of Concertina Coil at FSD Kalyani (2nd Call).
2026_FCI_922084_1
CE/WB/03/2026
Open Tender
Civil Works
Percentage
FSD KALYANI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.8 L
14 Aug 2026
14 Aug 2026
7 Sept 2026
14 Aug 2026
4 Sept 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including
stacking of serviceable material and disposal of unserviceable material
within 50 metres lead as per direction of Engineer-in-charge.In cement
mortar | 315.84 | cum | 2,004.58 | ₹6,33,126.55 |
| 2 | Demolishing cement concrete manually/ by mechanical means including
disposal of material within 50 metres lead as per direction of Engineer -
in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 114.87 | cum | 1,463 | ₹1,68,054.81 |
| 3 | Removing mortar from bricks and cleaning bricks including stacking
within a lead of 50 m (stacks of cleaned bricks shall be measured): From
brick work in cement mortar | 36.86 | 1000 nos. | 6,519.88 | ₹2,40,322.78 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) /
manual means in foundation trenches or drains (not exceeding 1.5 m in
width or 10 sqm on plan), including dressing of sides and ramming of
bottoms, for all lift, including getting out the excavated soil and disposal
of surplus excavated soil as directed, within a lead of 50 m. All kinds of
soil. | 755.16 | cum | 253.27 | ₹1,91,259.37 |
| 5 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 58.8 | cum | 2,066.41 | ₹1,21,504.91 |
| 6 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural
sources : 6 graded stone aggregate 40 mm nominal size derived from
natural sources) | 58.8 | cum | 6,984.92 | ₹4,10,713.3 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1
cement : 6 coarse sand) | 341.82 | cum | 6,939.68 | ₹23,72,121.42 |
| 8 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass
concrete | 203.04 | sqm | 381.56 | ₹77,471.94 |
| 9 | Centering and shuttering including strutting, propping etc. and removal
of form for Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 990 | sqm | 716.52 | ₹7,09,354.8 |
| 10 | Centering and shuttering including strutting, propping etc. and removal
of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 439.92 | sqm | 935.35 | ₹4,11,479.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.69 MB
BOQ_968967.xls
BOQ • 0.40 MB
FINALMTF.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].