Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.4 LAccepted-AOC | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹15.4 L+₹1.0 L (7.23%)Rejected-AOC | 2 | Rejected-AOC contract awarded to L 1 bidder | |
| 3 | 3₹16.1 L+₹1.7 L (11.9%)Rejected-Finance POTHUKAL PO MALAPPURAM KERALA PIN 679334 | MALAPPURAM | KERALA | 679334 | 3 | Rejected-Finance L3 BIDDER | |
| 4 | 4₹17.0 L+₹2.6 L (18.0%)Rejected-Finance | 4 | Rejected-Finance L4 BIDDER | |
| 5 | 5₹17.1 L+₹2.7 L (19.1%)Rejected-Finance | 5 | Rejected-Finance L5 BIDDER |
Tender Value
₹17.9 L
EMD Value
₹50,000
Closing Date
6 Oct 2023, 6:00 pmClosed
Deputy Director of Soil Conservation
Directorate of Soil Survey and Soil Conservation Centre Plaza Vazhuthacaud
DLT- Retaining wall and Cross check ALT works- SPGB and Agrostology
2023_DSSC_607155_1
pG(1)769/2023-LSS
Open Tender
Civil Works - Others
Item Rate
180 days
Malappuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
8 Nov 2023
26 Sept 2023
9 Oct 2023
26 Sept 2023
6 Oct 2023
26 Sept 2023
Amount
RETAINING WALL 1.50 M HEIGHT
2.6.1.Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 DRY RUBBLE MASONRY __ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6Steel reinforcement for RCC work including straightening ,cutting, bending, placing in position and binding all complete up to plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
5.1.2 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering and shuttering, finishing, and reinforcement - All work up to plinth level:1:1.5:3 (1 cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) nominal size)
5.9.1Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns etc for mass concrete
CROSS CHECK
2.6.1. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 DRY RUBBLE MASONRY __ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
STONE PITCHED GRADED BUND (SPGB)
OD227/2023-2024 Stone pitched graded bunding works with a grade of 0.2% to 0.3%using jungle stone , laterate,granite blasted rubble orany other locally available stone complete with quarrying of stones including filling of earth to the up hill portion soas toget a top width of45 cm with provision for drainingout the excess water from the bund as per dptl. rate
AGROSTOLOGICAL MEASURES
OD224/2023-2024 Strengthening the structure by planting CO3 fodder grass etc. at an interval of 0.3 m as per departmental specifications on top of the newly constucted contour bund/ graded bund & Existing bunds etc.
A.P. SUBAIR
BINU M GEORGE
POTHUKAL GRAMAPANCHAYATH SKILLED DEVELOPMENT MULTI PURPOSE INDUSTRIAL CO-OPERATIVE SOCIETY LTD NO.SIND(M) 169
CHANDRAN M C
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_905414.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .