Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹3.4 LSame as L1Rejected-Finance AMRUT ROAD RESTORATION WORK 2025 26 1200D RESTORATION WINE AT WORD II AMNITHA NAGAR VIVEKANATTANAGAR OF PASANTEAD MUNICIPALITY | L2 | Rejected-Finance Higher rate and hence not admitted |
Tender Value
Refer Docs
EMD Value
₹8,464
Closing Date
23 Jan 2026, 3:00 pmClosed
Assistant Executive Engineer
PWD Electrical Sub Division, KLCThiruvananthapuram
GENERAL-Lok Bhavan Kerala - Republic day 2026 - At home - Providing temporary illumination and decorative lighting -Republic day 2026- At home-Temporary Electrical Work
2026_PWD_828657_1
PWD/BLDG/TR/23187/2025
Open Tender
Electrical Works
Percentage
90 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹750
₹8,464
11 Mar 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
Temporary Electrical works
OD251731/2025-2026:Hire and labour charges for providing 200 W LED flood light and wiring using 4 sqmm FRLS PVC insulated copper wire clipped in No12 GI wire for first day
OD251735/2025-2026:Hire and labour charges for providing 200 W LED flood light for additional one day
OD251738/2025-2026:Hire and labour charges for providing 400W MH lamp (Green Colour light ) and wiring using 4 sqmm FRLS PVC insulated copper wire clipped in No12 GI wire for first day
OD251730/2025-2026:Hire and labour charges for providing 400W MH lamp (Green Colour light ) and wiring using 4 sqmm FRLS PVC insulated copper wire clipped in No12 GI wire for addl. one day
OD251729/2025-2026:Hire and labour charges of providing LED PAR RGBW upto 200 W and giving necessary connections for first day
OD251723/2025-2026:Hire and labour charges of providing LED PAR RGBW upto 200 W for additional days
OD251751/2025-2026:Hire and labour charges for providing serial set consisting of 50 nos LED lamps as directed in position and giving connections etc. as required for 1st day
OD251750/2025-2026:Hire and labour charges for providing serial sets consisting of 50 nos LED lamps as directed in position and giving connections etc as required for addl. one day
OD251739/2025-2026:Hire and labour charges for providing 450 mm sweep heavy duty pedestal fan and giving connection for first day
OD251758/2025-2026:Hire and labour charges of providing 50L Room Coolers fittings in position and giving connection from the existing plug point for first day
OD251743/2025-2026:Hire and labour charges for providing 6A 1 way switch &6A modular socket in suitable box and wiring using 1.5 sqmm FRLS PVC insulated single core copper cable with 2.5 sqmm FRLS wire as earth wire for first day
OD251764/2025-2026:Hire and labour charges for providing 6A 1 way switch &6A modular socket in suitable box and wiring using 1.5 sqmm FRLS PVC insulated single core copper cable with 2.5 sqmm FRLS wire as earth wire for additional one day
OD251733/2025-2026:Hire and labour charges for providing 16A 1 way switch & 16A modular socket in suitable box and giving connection using 2.5 sqmm FRLS PVC insulated single core copper cable with 2.5 sqmm FRLS wire as earth wire for first day
OD251763/2025-2026:Hire and labour charges for providing 16A 1 way switch & 16A modular socket in suitable box and giving connection using 2.5 sqmm FRLS PVC insulated single core copper cable with 2.5 sqmm FRLS wire as earth wire for additional one day
OD254308/2025-2026:Hire and labour charges for providing 63A 4 pole onload change over switch on suitable size iron stand for first day
OD254309/2025-2026:Hire and labour charges for providing 63A 4 pole onload change over switch on suitable size iron stand for additional one day
OD251756/2025-2026:Hire and labour charges for providing 100A 4 pole onload change over switch on suitable size iron stand for first day
OD251752/2025-2026:Hire and labour charges for providing 100A 4 pole onload change over switch on suitable size iron stand for additional one day
OD254293/2025-2026:Hire and labour charges for providing 160A 4 pole onload change over switch on suitable size iron stand for first day
OD254294/2025-2026:Hire and labour charges for providing 160A 4 pole onload change over switch on suitable size iron stand for additional one day
OD254311/2025-2026:Hire and labour charges for providing 40KVA Generator with operator for first day
OD254312/2025-2026:Hire and labour charges for providing 40KVA Generator with operator for additional one day
OD254313/2025-2026:Running charges for 40KVA Generator set including supply of fuel
OD251745/2025-2026:Hire and labour charges for providing 62.5KVA Generator with operator for first day
OD251734/2025-2026:Hire and labour charges for providing 62KVA Generator with operator for additional one day
OD251762/2025-2026:Running charges for 62.5KVA Generator set including supply of fuel
OD254316/2025-2026:Hire and labour charges for providing 82KVA Generator with operator for first day
OD254317/2025-2026:Hire and labour charges for providing 82KVA Generator with operator for additional one day
OD254318/2025-2026:Running charges for 82KVA Generator set including supply of fuel
OD254319/2025-2026: Hire and labour charges for providing 3.5x35 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for first day
OD254320/2025-2026:Hire and labour charges for providing 3.5x35 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for additional one day
OD251724/2025-2026:Hire and labour charges for providing 3.5 X 50 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for first day
OD251748/2025-2026:Hire and labour charges for providing 3.5x50 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for additional one day
OD254328/2025-2026: Hire and labour charges for providing 3.5x95 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for first day
OD254327/2025-2026: Hire and labour charges for providing 3.5x95 sqmm PVC insulated and PVC sheathed armoured Al cable of 1.1 KV grade for additional one day
OD251737/2025-2026:Hire and labour charges for providing 3 phase 4W TPN VDB with 4P RCCB and SP/TPMCBs for first day
OD251736/2025-2026:Hire and labour charges for providing 3 phase 4W TPN VDB with 4P RCCB and SP/TPMCBs for additional one day
OD251726/2025-2026:Hire and labour charges for providing 3 phase 4W MCB DB with 40A 4P Isolator, 40A 4P RCCB and SPMCBs and giving connection for first day
OD251728/2025-2026:Hire and labour charges for providing 3 phase 4W MCB DB with 40A 4P Isolator, 40A 4P RCCB and SPMCBs for additional one day
OD254334/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 4 sq.mm 4 run for first day
OD251741/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 4 sq.mm 4 run for addl. one day
OD254338/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 2 Run for 1st day
OD251757/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 2 Run for addl. one day
OD254337/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.5 sq.mm 4 run for first day
OD251761/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 4 Run for addl. one day
OD251753/2025-2026:Hire and labour charges for providing ordinary pipe earthing using 40mm dia GI pipe of 4.5m long including accessories etc as required for first day
OD251747/2025-2026:Hire and labour charges for providing pipe earthing using 40mm dia GI pipe of 4.5m long including accessories etc as required for additional 1 day
OD251755/2025-2026:Hire and labour charges for providing No 10 SWG bare copper conductor and giving connection for first day
OD251749/2025-2026:Hire and labor charges for providing No 10 SWG bare copper conductor and giving connection for additional one day
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1391104.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1391104.xls
BOQ • 0.37 MB
form.pdf
Other Document • 0.37 MB
agree.pdf
Other Document • 0.53 MB
IP.pdf
Other Document • 0.19 MB
affi.pdf
Other Document • 0.46 MB
epayment.pdf
Other Document • 0.38 MB
make.pdf
Other Document • 0.19 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .