Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
6 Aug 2024, 3:00 pmClosed
HEAD PROCUREMENT
PATNA BIHAR
SUPPLY, DISMANTLING, FABRICATION AND ERECTION OF STEAM PIPE LINE AND MOUNTINGS
2024_HPCLB_201941_1
HBL/TEN/PUB/24-25/137
Open Tender
Pipes and Pipe related activities
Works
28 days
SUGAULI EAST CHAMPARAN BIHAR
AS ATACHED
2 documents required · 2 mandatory
₹0
Exempted
13 Aug 2024
19 Jul 2024
7 Aug 2024
19 Jul 2024
6 Aug 2024
19 Jul 2024
19 Jul 2024 - 30 Jul 2024
SUPPLY, DISMANTLING, FABRICATION AND ERECTION OF STEAM PIPE LINE IN COGEN PLANT, AS PER BELOW DESCRIPTION & ATTACHED JOB SCOPE OF THE TENDER DOCUMENT:
Dismantling of existing damaged Steam Pipe (450 NB, SCH 40, Length 6 Meters) and related mountings (Temperature Control Valves- 6"-01 Nos.), Safety Valve-8",-01 Nos.), Drain Pipe Line--1", and Vent etc & replacement and commissioning of new pipe and related mountings with all necessary accessories. Dismantling of existing Pipe line: a. Removal of Insulation of existing Steam pipeline. b. Cutting & dismantling of the existing 6-meter long 450 NB SCH 40 steam pipe line. The pipeline needs to be locked so that it shouldn’t change its position. c. Dismantling of existing valves. The pipeline to be cut & dismantled in such a way that it does not damage the nozzle. d. Scaffolding to be erected by the vendor. Requisite materials for making the scaffolding will be arranged by the HBL. e. After completion of the work, the worn-out pipe will have to be kept at the designated place as advised by the Engineer. Fabrication & Erection of new Pipe line: a. Fabrication & Erection of new Pipe line. b. The pipe line to be properly fitted and its V-angle to be correctly matched before welding and the gap of the pipe line to be maintained. c. Flanges/valves to be fitted properly so that the direction of nozzle should be towards the direction of the steam flow. d. Leakage test to be carried out after the completion of job and it should be ensured that there should not be any leakage of steam. e. It is to be noted that 100% Radiography of weld joints as applicable to be carried out. g. As advised by Engineer In Charge for dismantling, fabrication & erection of allied jobs required for successful completion of works explained above to be carried out by the vendor.
1) Supply of Concentric Reducer for Steam Drain Pipe Line: a. Con.Reducer -SA234 WPB, Size-50 NB x 25 NB Sch-80, Qty-02 Nos. b. Con.Reducer - SA234 WPB, Size-80 NB x 50 NB, Sch-80, Qty-02 Nos. c.Elbow-90-SA- 234 WPB, Size-25 NB, Sch-80, Qty-4 Nos. d.Pipe- SA -106 GR-B, Size-80 NB, Sch-80-6 Meter. e. Con. Reducer-SA 182 F91, Size-50 NB X 25 NB, Sch-80, Qty-02 Nos. f. Pipe- Sch80, SA335 P11, Size-50 NB-6 Meter. 2) Supply of Pipe for Boiler Feed Pump Balancing Pipe Line: a.Pipe-SA106 GR-B, 65 NB, Sch 40, Qty-06 Meter.
VADODARA INDUSTRIAL SERVICES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .