50 live23 closing this weekmost from East Central Railway and HPCL Biofuels Limited
50 results • Latest
Request to submit financial proposal for Selection of Consultant for preparation of Detail project report (DPR) for desilting and development of Motijheel, Motihar, East Champaran, Bihar
PROVIDING LIAISONING AND STATUTORY COORDINATION SERVICES AT HBL PLANT, SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
SUPPLY AND INSTALLATION OF CCTV CAMERA SURVEILLANCE SYSTEM ON DOOR DELIVERY BASIS FOR CANE PURCHASE CENTRE (CPC) AT HBL SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
STANDING ORDER / RATE CONTRACT FOR HIRING SERVICES OF HYDRA CRANE ON CALL UP BASIS AT HBL PLANT, SUGAULI, EAST CHAMPARAN, BIHAR
RESTORATION WORK OF THE TRIVENI BRANCH CANAL FROM KM 118.90 TO KM 143.90 AND ITS DISTRIBUTION CANAL SYSTEM UNDER THE RAXAUL ASSEMBLY CONSTITUENCY. GROUP NO-01
DISILTING AND REPAIR OF STRUCTURE WORK FROM KM 24.38 T0 KM 49.35 0F GHORASAHAN BRANCH CANAL AND BAHADURPUR S/D UNDER RAXAUL ASSEMBLY CONSTITUENCY. GROUP NO-01
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Supply , erection , Testing and commissioning of 132 KV D/C line from Bodh Gaya GSS (BSPTCL) to Paharpur TSS in connection with construction of multi tracking project between Sonnagar-PKA and any other locationunder CEE/con/South/MHX.
Proposal for lining up Rate Contract for emergency repair works such as pipeline leak, burst, pilferage and other miscellaneous maintenance activities in mainline jurisdiction of various PHBMPL stations into 5 Groups
Balance work of Transplantation, Tree-cutting and Transportation of trees after cutting in Koderma Forest Divison, Hazaribagh West Forest Division and Hazaribagh Wildlife Forest Division for constrcution of Koderma Detour Section of Son-Nagar Andal Multitracking project under Dy.CE/C/KQR.
EOI for distributors attached to Motihari Bottling Plant for own load Transportation of Indane LPG Cylinders in vertical position on unit rate basis Ex Motihari LPG Bottling
Paint Oxford Blue, 20 litre, Paint Signal Red 20 litre, ELECTROSTATIC Primer Red oxide
Electrical Safety Audit at LPG Plants
Survey/Route Plan/Design/Drawings of 132 KV EHT lines from Grid Sub Station to Traction Substations, Survey/Design/ Drawing of EHT line crossings infringing proposed Railway Track & associated OHE works, Wiring diagram, General Power Supply diagram, Sectioning Diagram and Pegging Plans related to OHE work, TSS/SP/SSP location plans surveys and OHE/PSI Design & Drawing of section for New Line/ Doubling projects ( NKE-RXL-SMI & MFP-SMI, Mansi- Khagaria,Goldenganj-Katihar etc.) over SPJ Division under jurisdiction of Dy.CEE/CON/N/SPJ
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Shoulder Builder Arm Wheel - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Leg Press - Outdoor Gym Equipments (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3) (3 (3 ))
Rate contract for carrying out Final Location Survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of DPR (including Electrical, Signal, operating/ traffic works and preparation of EPC Bid package) in connection with survey for New line, Bye-pass line, Doubling/multitracking, flyover etc. in E.C.Railway including Providing facilitation to Competent Authority for Land Acquisition (CALA) for land acquisition work to the Railway Projects in jurisdiction of CAO/Con/North/MHX covering SEE & SPJ divisions of ECR
Cleaning work of total 232 Chhath Ghats located in all the wards under Municipal Corporation, Motihari area. (Cleanliness including leveling of Chhath Ghat and disposal of water hyacinth under water) Temporary barricading work with bamboo bats in three layers at Chhath Ghats. Installation work with temporary hoarding board flex made of bamboo bat near Chhath Ghats.
Supply installation testing and commissioning of Lithium Iron Phosphate Battery Bank 48V 500Ah cons, Supply installation testing and commissioning of Lithium Iron Phosphate Battery Bank 48V 800Ah cons
Construction of Well foundation, substructure & superstructure of Br no 54 (2x12.2m PSC) in between Raniganj-Triveniganj section of Supaul-Araria section in Samastipur Division of East Central Railway.
Leftover miscellaneous work like construction of minor bridges, earth work in filling on embankment, blanketing , retaining wall, boulder backing, & turffing on slope of embankment between Madhubani to Sagauli section in connection with construction of Hajipur-Sagauli New Rail line project.
Providing Project General Management Services (PGMS) for Different Projects in Construction Organization under CAO/Construction/North unit of East Central Railway.
Drilling Machine Bench Type/Pillar Typeasper IS2425 (Q3)
Construction of Station Building (New Kastha & New Rafiganj) and other ancillary civil engineering works under proposed alignment in connection with 3rd & 4th line of DFCC under DDU Division of E C Railway.
Engineering procurement and Construction (EPC) for "Construction of New line work between including earth work, blanketing, minor bridges, major bridges, ROBs, LHS/RUBs, track works, platform work, station building, FOBs, other buildings and associated miscellaneous Civil engineering works for 25T Indian Railway Standard Loading from Bikramshila (incl) to Katareah (incl) from ch. 0.50 KM to 24.274 KM with Shivnarayanpur to Shivnarayanpur Y-Link from ch. KM 1.10 to 2.933 KM and Katareah Y-Link to Naugachia from ch. KM 21.533 to KM 29.22 (Total :33.294 KM, civil engineering & P. way work including P. way work on important bridge from ch. KM 8.804 to KM 12.894. Total=4.09 KM) in connection with Bikramshila-Katareah New line Rail link Project.
POLYHOUSE AND SHADE NET HOUSE
STANDING ORDER FOR CARRYING OUT BALANCE CIVIL AND MISCELLANEOUS WORKS ON CALL UP BASIS AT HBL INTEGRATED SUGAR PLANT AT SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR
Associated leftover works for commissioning of section between KQR (Ch.64.500) to Kheraundh (Yard excluding) (Ch.24.00) in connection with KQR- TIA New B.G. Rail line project along with its maintenance activities after opening of section.
Rockfall protection, slope stabilization and Debris Flow Protection alongwith other associated miscellaneous works for vulnerable locations from Kheraund (Excluding) to Major Bridge 108 (Excluding ) and Km. 41.500 to 42.220 (on Left Side in increasing chainage direction) & Km. 41.710 to 41.900 (on Right Side in increasing chainage direction) in connection with new BG Line between Tilaiya to Koderma under the jurisdiction of Dy.CE/Construction/ Dhanbad
Design, Manufacturing, Supply, Installation, Testing and Commissioning of Distributed Electronic Interlocking System (Indoor & Outdoor) (One centralized + Two end cabins) along with Telecom works at Sitamarhi, Riga, Raxaul and Narkatiyaganj Stations in SPJ Division of East Central Railway.
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom Design, Manufacturing, Supply, Installation, Testing and Commissioning of Electronic Interlocking System (Indoor & Outdoor) including Telecom Work at 23 Stations in connection of Doubling work of Narkatiaganj-Raxaul-Sitamarhi- Darbhanga & Sitamarhi-Muzaffarpur Section in Samastipur Division of East Central Railway" (Total- 247 Km approx.) of East Central Railway."
Design, Engineering, Supply, Erection Testing & Commissioning of 132 KV Double Circuit Transmission Line from 132/33KV GSS Saria to proposed Hazaribagh Road TSS including all associated works.
Maintenance of Dy.CE/C/Dhanbad office & Campus, Horticulture work and other associated required work in connection with construction of various Rail Line Project under Dy.CE/C/DHN for 2 years in Dhanbad Division of East Central railway.
Supplying including loading, transportation, unloading of 2,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the same at nominated place/location/stacks at Garhara Yard for B.G. Railway Track & loading the same into any type of railway wagons for various projects under CAO/Con/North, ECR.
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Outstation 24*7
Construction of Station Building, EI Building, others Building, Platform, FOB, PP shelter, Dismantling of existing building & Others structures and other ancillary civil works such as drain work, retaining walls, road works etc. from Gomoh CH 300.15 to Koderma CH 393.55 in connection with 3rd & 4th multitrack project between PKA-MPO section of Dhanbad Division of ECR under Dy.CE/HZME-I
OPEN TENDER ENQUIRY FOR SUPPLY AND INSTALLATION OF MOBILE DIGITAL WEIGHBRIDGE ON DOOR DELIVERY TO HBL PLANT SUGAULI EAST CHAMPARAN AND LAURIYA WEST CHAMPARAN BIHAR
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY OF SAFETY VALVES FOR HBL SUGAULI EAST CHAMPARAN AND HBL LAURIYA, WEST CHAMPARAN, BIHAR.
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, SUPERVISION FOR ERECTION AND COMMISSIONING OF JET COOKER PACKAGE FOR HBL LAURIYA, WEST CHAMPARAN, BIHAR
EXPRESSION OF INTEREST FOR LOAD TRANSPORTATION OF BUL PETROLEUM PRODUCTS MS/HSD/Branded Fuels for Dealers/Consumers (Bottom Loading) ex-Motihari Terminal
SUPPLY OF POWER AND CONTROL CABLES ON DOOR DELIVERY AND CALLUP BASIS AT HBL SUGAULI
Engineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, RUB/LHS, Tunnel/Cut- Cover, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated worksfor construction of new Double Line track for DFCC loading from Ch.158.00 to Ch.184 in Koderma Detour section in Sonnagar- Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway.
Engineering Procurement and Construction (EPC) for "Construction of doubling work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, track works, platform work, station building, FOBs, other buildings, associated S&T and Electrical Utility Shifting works and associated miscellaneous works for 25T Indian Railway Standard Loading from KARNAUTI station(including-Ch. 2.844 KM) to BIHAR SHARIF station(excluding-Ch 29.350 KM), from Ch. 1.900 KM to 28.192 KM (Total- 26.292 km) in connection with the Doubling of the Bakhtiyarpur-Rajgir - Tilaiya section"
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2), Watermist and Caf Fire Extinguisher Low Pressure Trolley Mounted (V2) (Q2), Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 (Q2) (3 (3 ))
Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 (Q2) (3 (3 ))
Engineering, Procurement and Construction (EPC) Tender for"Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 227.200) (total- 37.80 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway"
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom works in connection with the 3rd and 4th line between Chirailapothu to Paharpur and Koderma to Pradhankhunta (exclusive) (Total- 242 km approx) of East Central Railway