Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
39 live11 closing this weekmost from East Central Railway and Department Of Panchayati Raj
39 results • Latest
Construction of Souvenir Shop, Cafeteria, toilets, Sitting arrangements, baby care room, accessibility for divyangs etc. at Kesariya Stupa (Job Work)
Engineering, Procurement and Construction (EPC) Tender for Track linking in Block section and Station yards (including work during NI) with contractor's own material (PSC Line Sleepers, Special PSC Sleepers, Points & Crossing switches & crossings with all matching fastening components, Glued joints, SEJs, Guard rails, Check Rails, Fishplates, Fish Bolts etc) including Rail Joints Welding, Ballast supply but excluding new 20 Rail Panel & SH Rail as per laid down specifications and other miscellaneous allied works - Total 57.340 KM (Km. 4.837-9.300, Km 9.900-32.600 and Km 33.400-63.577) in connection with doubling of Muzaffarpur-Sitamarhi section in Samastipur Division of East Central Railway
SUPPLY OF LOOSE BAGASSE ON DELIVERY BASIS TO HBL PLANT AT SUGAULI, EAST CHAMPARAN, BIHAR
CONTRACT FARMING AT HBL SUGAULI FARM LAND AT BAHURUPIYA, EAST CHAMPARAN, BIHAR
Potable Water Purification System DE - Ionization Based (Q3)
Potable Water Purification System DE - Ionization Based (Q3)
CONSTRUCTION OF BOUNDARY WALL OF UJIYARPUR-2(RUPAULI) COLONY
CONSTRUCTION OF BOUNDARY WALL OF UJIYARPUR-1(RAYPUR) COLONY
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Shoulder Builder Arm Wheel - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3) 3 3
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; Toyota Innova; 2024; 25, 000-50, 000 kms; A/C; 8, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; 2024; 25, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2024; 25
Twister - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Miscellaneous works, in PKA-PEH & SDBH-SNMY section involving Vaccum dewatered concrete for platform surface, Fencing of platform at stations, construction of toilets at platforms, Construction of station approach Road, Construction of Height Gauges, Water supply arrangement at platforms, PF sheds, Stainless steel benches, Retaining walls, Side drains, Chequerred pre-cast cement concrete tiles and Maintenance of track for 02 (Two) months after CRS inspection etc. under jurisdiction of Dy.CE/CON/KODERMA in connection of doubling work between PKA-PEH & SDBH-SNMY section in Dhanbad division of East central Railway
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) 3 3
Running contract for electrification work in connection with various ROBs in MFP-SGL- VKNR section, removal of HT infringement at SPJ workshop, LT/HT infringement removal work at Pipra ROB and any other location under Dy.CEE/CON/N/SPJ".
Design, Manufacturing, Supply, Installation, Testing and Commissioning of Distributed Electronic Interlocking System (Indoor & Outdoor) at HZBN (Hazaribagh Town) for distributed EI ( 1+3 ) architecture in Absolute Block working along with alteration in Existing KYOSAN Make EI at Banadag Goods Shed & Banadag RLS in connection with Hazaribagh - Banadag Doubling Work in Dhanbad Division of East Central Railway.
Engineering, Procurement and Construction (EPC) for"Construction of new B.G. railway line work including earth work,blanketing, minor bridges, major bridges, ROBs, LHS/RUBs, trackworks, platform work, station building, other buildings, andassociated miscellaneous works for 32.5 Ton DFC Standard Loadingfrom Chetar station to Banhardih captive mine of PVUNL New Linein Dhanbad Division of East Central Railway."
CONSTRUCTION OF 03 (THREE) Nos. PANCHAYAT SARKAR BHAWAN IN VILL - KARARIYA MAUJA - KARARIYA, VILL - BARHARWAKALA PASCHIM MAUJA - BARHARWA KALA AND VILL- BHOPATPUR UTTARI MAUJA - BHOPATPUR AT BLOCK KOTWA IN THE DIST - EAST CHAMPARAN FOR THE YEAR - 2026-27.
Renovation of E/W & E/I in OBC Boy's Hostel at Ambika Nagar, Motihari, Distt.-East Champaran.
Consultancy work for Project General Management Services (PGMS) for supervision of Project /contract works in the jurisdiction of CAO/C/RSP /East Central Railway.
Shifting of S&T Gears and Other Signalling & Telecommunication Installations Near Level Crossing (L.C.) Gate No.104 and Damodar Road Over Bridge (ROB) at Muzaffarpur Station in Connection with the Doubling Work of the Muzaffarpur- Sagauli Section of East Central Railway.
Construction of New B. G. Line between East Outer Cabin (EOC) and Fly Over Cabin (FOC) for DDU Bypass Line (2.666 KM).
Engineering procurement and Construction (EPC) of Construction of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, Animal Overpass, RUB/LHS, ROB, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated works for construction of new Double Line track for DFCC loading from Ch. 123.600 to 135.650 in Koderma Detour section in Sonnagar-Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway' .
Construction of Road Over Bridge and other related works in lieu of (1) level crossing no. 25 (spl) at kilometer : 104/37-39 between Mansi-Mahesh Khunt station., (2) level crossing No. 53 (spl) at Kilometer : 169/28-29 bet. Tilrath-Begusarai station. & (3) level crossing No. 30 (spl) at Kilometer : 115/28-30 between Khagaria-Mansi station, in the jurisdiction of Sonpur Division.
Engineering, Procurement and Construction (EPC) Tender for Track works, including supply of ballast and P-Way materials, laying and linking of track, and other related miscellaneous works in connection with the doubling of the Darbhanga (excluding)-Sitamarhi (excluding) section from Ch. 39.400 km to Ch. 103.850 km (total length: 64.450 km), for 25-tonne axle load, under Samastipur Division of East Central Railway
EOI for distributors attached to Motihari Bottling Plant for own load Transportation of Indane LPG Cylinders in vertical positioon unit rate basis Ex Motihari LPG Bottling
Yard remodelling of Sitamarhi Yard, Raxaul Yard and Narkatiaganj Yard on 2x25KV traction system including removal of OHE infringement in block section of Muzaffarpur (Excl.) -Sitamarhi (Excl.), Sitamarhi (Excl.) -Raxaul (Excl.), Raxaul (Excl.)-Narkatiaganj (Excl.) and Darbhanaga (Excl.) Sitamarhi(Excl.) in alignment of new doubling work of MFP-SMI, DBG-SMI, NKE- RXL section
Engineering procurement and Construction (EPC) of "Construction of doubling work including earth work, blanketing, minor bridges, major bridges, ROBs (With dismantling of existing ROBs), LHS/RUBs, track works, platform work, station building, FOBs, other buildings and associated miscellaneous works for 25T Indian Railway Standard Loading from Hazaribagh town station to Kuju station from Ch. 81.000KM to122.200KM (Total- 41.200 km) in connection with the doubling of the Koderma-Arigada section in Dhanbad Division of East Central Railway. "
Engineering, Procurement and Construction (EPC) " Tender for Construction of doubling work including Earth work, blanketing, important/mega bridges, major bridges, minor bridges, extension of level crossings, P-way work, Buildings, Electrification, Signalling and Telecommunication works and other miscellaneous works for 25T Indian Railway Standard Loading from Mansi to Saharsa (i.e. Ch:0.000 to 42.200) (total- 42.200 Km) in connection with doubling of Mansi - Saharsa section in Samastipur Division of East Central Railway.
Engineering procurement and Construction (EPC) of "Construction of New BG line work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, ROBs, track works, platform work, station building, FOBs, other buildings, and associated miscellaneous works for 25T Indian Railway Standard Loading from Ch. 1.350 KM (excluding Jhajha) to 22.000 KM (including BATIA station) (Total- 20.650 route km, 27.888 track km) in connection with the Jhajha Batia New line Project"
Rate contract for carrying out Final Location Survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of DPR (including Electrical, Signal, operating/ traffic works and preparation of EPC Bid package) in connection with survey for New line, Bye-pass line, Doubling/multitracking, flyover etc. in E.C.Railway including Providing facilitation to Competent Authority for Land Acquisition (CALA) for land acquisition work to the Railway Projects in jurisdiction of CAO/Con/North/MHX covering SEE & SPJ divisions of ECR
Engineering procurement and Construction (EPC) for "Construction of New line work between including earth work, blanketing, minor bridges, major bridges, ROBs, LHS/RUBs, track works, platform work, station building, FOBs, other buildings and associated miscellaneous Civil engineering works for 25T Indian Railway Standard Loading from Bikramshila (incl) to Katareah (incl) from ch. 0.50 KM to 24.274 KM with Shivnarayanpur to Shivnarayanpur Y-Link from ch. KM 1.10 to 2.933 KM and Katareah Y-Link to Naugachia from ch. KM 21.533 to KM 29.22 (Total :33.294 KM, civil engineering & P. way work including P. way work on important bridge from ch. KM 8.804 to KM 12.894. Total=4.09 KM) in connection with Bikramshila-Katareah New line Rail link Project.
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom Design, Manufacturing, Supply, Installation, Testing and Commissioning of Electronic Interlocking System (Indoor & Outdoor) including Telecom Work at 23 Stations in connection of Doubling work of Narkatiaganj-Raxaul-Sitamarhi- Darbhanga & Sitamarhi-Muzaffarpur Section in Samastipur Division of East Central Railway" (Total- 247 Km approx.) of East Central Railway."
Engineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, RUB/LHS, Tunnel/Cut-Cover, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated worksfor construction of new Double Line track for DFCC loading from Ch.158.00 to Ch.184 in Koderma Detour section in Sonnagar-Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway.
Engineering Procurement and Construction (EPC) for "Construction of doubling work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, track works, platform work, station building, FOBs, other buildings, associated S&T and Electrical Utility Shifting works and associated miscellaneous works for 25T Indian Railway Standard Loading from KARNAUTI station(including-Ch. 2.844 KM) to BIHAR SHARIF station(excluding-Ch 29.350 KM), from Ch. 1.900 KM to 28.192 KM (Total- 26.292 km) in connection with the Doubling of the Bakhtiyarpur-Rajgir - Tilaiya section"
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Engineering, Procurement and Construction (EPC) Tender for Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 225.600) (total- 36.20 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom works in connection with the 3rd and 4th line between Chirailapothu to Paharpur and Koderma to Pradhankhunta (exclusive) (Total- 242 km approx) of East Central Railway