Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹42.3 L
Closing Date
4 Dec 2026, 2:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
Two Packet System
Normal Tender
Yes
14/10/2026 14:30
Lowest to Highest
120 days
Expenditure
Revenue
13 conditions · 2 needing a document upload
As per RFP document attached.
As per RFP document attached.
15 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In case the date of closing mentioned in the NIT Header of etender document is declared a holiday/bandh/strike etc. on any account, the date of closing tender online will not be changed as the application in the website of IREPS does not permit submission of any offer after closing date and time of the tender. However, opening of tenders online will be on the following working day after the closing date/time of tenders.
The tender shall be finalised based on submitted documents & no post tender correspondence shall be entertained. However, if any clarification is required by the Railway, the same will be sought from the tenderer which need to be provided by tenderer(s) within stipulated time failing which his/their offer(s) shall be dealt based on available information with Railways interpretation only.
It is the responsibility of the tenderer to keep watch on IREPS website regarding Addendum/Corrigendum etc. (if any) to tender notice up to the date of Bid closing. No separate intimation/ information shall be given in Newspapers or through any other means
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, labour, water etc. that may be encountered in course of execution of work.
The quoted rates shall be inclusive of all taxes, levies etc (including GST and royalty) leviable by State/Central Govt. or by local authorities. The rate shall be inclusive of all sales / turn over tax, Service Tax including all other cess etc., on contract by respective State Govt.
Rates quoted by the tenderer in the relevant fields of the Financial Bid only will be the ruling terms for deciding inter-seranking and any condition having financial repercussions, if quoted, anywhere else shall not be considered for deciding the inter-se- ranking.
Rate contract for carrying out Final Location Survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of DPR (including Electrical, Signal, operating/ traffic works and preparation of EPC Bid package) in connection with survey for New line, Bye-pass line, Doubling/multitracking, flyover etc. in E.C.Railway including Providing facilitation to Competent Authority for Land Acquisition (CALA) for land acquisition work to the Railway Projects in jurisdiction of CAO/Con/North/MHX covering SEE & SPJ divisions of ECR
ECR-CAO-C-N-ETN-08-26-27~ECR
ECR-CAO-C-N-ETN-08-26-27
Open
Works - General
36 Months
Purbi Champaran, Bihar
₹0
₹42.3 L
7 Oct 2026
7 Oct 2026
20 Nov 2026
14 Oct 2026
17 items across 2 schedules · ₹21,15,30,383.22 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | "Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signalling works, Electrical works & operating work for construction of a New line.The details of works to be executed are Annexure-A (for Civil Engineering works), Annexure-B (for S&T Engineering works), Annexure-C (for Electrical Engineering works) & Annexure-D (for Operating works).Note:(i) For Annexures please refer Chapter-9 of Annexed Document and(ii) For Salient Features regarding Work Orders, Completion Period, Mode of Payment, Penalty, Eligibility Criteria, Participation of JV, Quantities of work etc. please refer Chapter-10 of Annexed Document.Note: Detailed Project Report (DPR) should be prepared as per Railway Board letter no. 2022/W-1/Gen/DPR proforma (E-off 3404238) dt. 13.12.23 & No 2018-w1/Gen/policy dt 22.12.23 & No. 2018/W-I/Genl/Policy dated: 10/01/2024" | Kilometre | 390.00 | 2,66,095.2 | 10,37,77,128 |
| 2 | "Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signalling works, Electrical works & operating work for construction of Doubling line/3rd line or one additional line.The details of works to be executed are (i) Annexure-A (for Civil Engineering works), (ii) Annexure-B (for S&T Engineering works), (iii) Annexure-C (for Electrical Engineering works) & (iv) Annexure-D (for Operating works).Note:(i) For Annexures please refer Chapter-9 of Annexed Document and(ii) For Salient Features regarding Work Orders, Completion Period, Mode of Payment, Penalty, Eligibility Criteria, Participation of JV, Quantities of work etc. please refer Chapter-10 of Annexed Document." | Kilometre | 290.00 | 2,12,876.16 | 6,17,34,086.4 |
| 3 | "Extra to item no. NS-1 if the FLS is carried out for two lines i.e. New line project with doubling @ 25% of rate prescribed for Single line (282000X25/100=70500/-)" | Kilometre | 25.00 | 66,523.8 | 16,63,095 |
| 4 | "Extra to item no. NS-2 if the FLS is carried out for two lines e.g. 3rd and 4th line @ 25% of rate prescribed for doubling (225600X25/100=56400/-)" | Kilometre | 25.00 | 53,219.04 | 13,30,476 |
| 5 | "Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signalling works, Electrical works & operating work for construction of a New line in Hilly terrain and Forest Area.The details of works to be executed are Annexure-A (for Civil Engineering works), Annexure-B (for S&T Engineering works), Annexure-C (for Electrical Engineering works) & Annexure- D (for Operating works).Note:(i) For Annexures please refer Chapter-9 of Annexed Document and (ii) For Salient Features regarding Work Orders, Completion Period, Mode of Payment, Penalty, Eligibility Criteria, Participation of JV, Quantities of work etc. please refer Chapter-10 of Annexed Document." | Kilometre | 10.00 | 3,19,314.24 | 31,93,142.4 |
| 6 | "Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating work for construction of Doubling line in Hilly terrain and Forest Area.The details of works to be executed are (i) Annexure-A (for Civil Engineering works), (ii) Annexure-B (for S&T Engineering works), (iii) Annexure-C (for Electrical Engineering works) & (iv) Annexure-D (for Operating works).Note:(i) For Annexures please referChapter-9 of Annexed Document and(ii) For Salient Features regarding Work Orders, Completion Period, Mode of Payment, Penalty, Eligibility Criteria, Participation of JV, Quantities of work etc. please refer Chapter-10 of Annexed Document" | Kilometre | 10.00 | 2,55,451.39 | 25,54,513.9 |
| Schedule total | ₹17,42,52,441.7 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS-11toGCC-2022.pdf
ATTACHMENT
GCC-2022_compressed.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12.pdf
ATTACHMENT
RFPDOCUMENT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .