Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
393 results • Latest
CONSTRUCTION OF SUB REGISTRY OFFICE AT ARERAJ IN THE DISTRICT OF EAST CHAMPARAN FOR THE YEAR-2025-26.
SUPPLY OF POWER AND CONTROL CABLES ON DOOR DELIVERY AND CALLUP BASIS AT HBL SUGAULI
Proposal for lining up Rate Contract for emergency repair works such as pipeline leak, burst, pilferage and other miscellaneous maintenance activities in mainline jurisdiction of various PHBMPL stations into 5 Groups
DESIGN, ENGINEERING, MANUFACTURING AND SUPPLY, SUPERVISION OF ERECTION AND COMMISSIONING OF CENTRIFUGAL PUMPS AT HBL PLANT SUGAULI
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; as per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Sanitary Napkins Incinerator Machine with Smoke Control Unit; SANITIZER PAD BURNING MACHINE; Service Provider
Twister - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Outdoor Slide (V2) (Q4), Chest Press - Outdoor Gym Equipments (Q3), Leg Press - Outdoor Gym Equipments (Q3), Surf Board - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Garden Swings (Q3) 3 3
DESIGN ENGINEERING MANUFACTURING SUPPLY AND SUPERVISION OF ERECTION AND COMMISSIONING OF DDGS AND GHS BAG FILTERS AT HBL PLANT SUGAULI EAST CHAMPARAN BIHAR
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND ERECTION SUPERVISION OF BAGGING MACHINES FOR HBL PLANT SUGAULI
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Sanitary Napkins Incinerator Machine With Smoke Control Unit; SANITIZER PAD BURNING MACHINE; Service Provider
KIOSKS
Twister - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Chest Press - Outdoor Gym Equipments (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3) 3 3
Under Motihari Municipal Corporation area, Ward No. 26, from PWD Road to Shri Pramod Pandey's house, from PWD Road to Shri Narendra Singh's house, from PWD Road to Pradeep ji's house, Moku ji's street to Rakesh ji's street, Manibhushan ji's street, Kalavati ji's house to Sobit ji's house, Awadhesh Thakur's street and Vijay Yadav. Drain and PCC road construction work in GK Gali.
Construction work of drain and PCC road from Dharmendra Yadav's house to Raja Thakur's house, from Bablu Singh's house to Gopal ji's house and from Seema Devi's house to Sudama Prasad's house in Ward No. 24 under Municipal Corporation Motihari.
Construction work of RCC drain and PCC road from Chanda Madam's house to the road going to Chilvaniya via Ashok Gupta's house in Ward No. 24 under Motihari Municipal Corporation area.
Steel Bookcases conforming to IS 7761 (V2) (Q2) (3 (3 ))
SUPPLY OF ONLINE UPS AND UPS BATTERIES WITH RACK ON BUY BACK BASIS, ON DOOR DELIVERY BASIS AT HBL PLANT, SUGAULI (EAST CHAMPARAN) AND LAURIYA (WEST CHAMPARAN), BIHAR
SUPPLY AND INSTALLATION OF CCTV CAMERA SURVEILLANCE SYSTEM ON DOOR DELIVERY BASIS FOR CANE PURCHASE CENTRE (CPC) AT HBL SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
Safes (V3) ISIMarkedto IS550 (Q2)
Leg Press - Outdoor Gym Equipments (Q3), Chest Press - Outdoor Gym Equipments (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3) 3 3
Surf Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
eSewa Kendra
55PPM MFD PRINTER
Mantra Discrete L1 Fingeprint Scanner Registered Device for Aadhaar Authentication Brand: Mantra (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687755985883 dt.04/1
Servo Motor Operated Automatic Line Voltage Correctors Conforming to IS 9815 (Part 1) - Single Phase Applications (Q3) (3 (3 ))
Waste Container (V3) (Q4)
Waste Container (V3) (Q4)
Tap-water connection(Nal -Jal Connection) to the remaining houses in Ward Numbers 06, 07, 08A, 08B, 12, and 14 under Nagar Panchayat Areraj, new standposts in 07 and 08A, and the construction of motors and borings in 07, 08A, and 08B.
Tap-water connection(Nal-Jal connection) to the remaining houses in Ward Numbers 09, 10, 11, and 13 under Nagar Panchayat Areraj, and the construction of new standposts, motors, and borings in Wards 09, 11, and 13.
Construction work of drain and PCC from Motihari Municipal Corporation's Ward No. 23 PWD Path Station Road, next to Charkha Park, till the house of Shri Bhagyanarayan Thakur.
Construction work of RCC drain from NH 28 Shri Ram Path to Sariswa River under Raxaul area.
Construction of drain and road from Chandmari PWD Road Ramsharan Dwar to Harijan Hostel in ward number 25 of Motihari Municipal Corporation.
Construction of RCC Drain with Cover slab from Khesariya Road Hunuman Mandir via Ghaghnti to Lakhana River ward no. - 07 under Nagar Parishad Chakia
Construction work within Ward No. 08 of Areraj Nagar Panchayat, comprising: a PCC road and RCC drain from Pawan Kumar's house to Ganesh Sah's house; a PCC road and RCC drain from Vinod Upadhyay's house to College Road; an RCC drain from College Road to Bharat Prasad's house; a PCC road and RCC drain from Bharat Prasad's house to the hospital premises; and an RCC drain from the hospital premises to Lane No. 01.
STANDING ORDER / RATE CONTRACT FOR HIRING SERVICES OF HYDRA CRANE ON CALL UP BASIS AT HBL PLANT, SUGAULI, EAST CHAMPARAN, BIHAR
CONSTRUCTION OF MALE, FEMALE & HANDICAPT TOILET COMPLEX IN CAMPUS OF DISTRICT REGISTRY OFFICE AT CHHAURADANO IN THE DIST - EAST CHAMPARAN FOR THE YEAR - 2026-27
CONSTRUCTION OF SUB REGISTRY OFFICE AT PAKARIDAYAL IN THE DISTRICT OF EAST CHAMPARAN FOR THE YEAR-2025-26.
Digital VHF Repeater Set as per MHA QR (Q2) (3 (3 ))
PCC and drain construction work from Shri Bhola Singh's house to Rajkumar Singh's house in Ward No. 11 of Motihari Municipal Corporation.
Construction work of community toilet behind Sugauli police station in ward no. 09.
PROVIDING LIAISONING AND STATUTORY COORDINATION SERVICES AT HBL PLANT, SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
CONSTRUCTION OF BLOCK-CUM-CIRCLE OFFCIE BUILDING AT MOTIHARI BLOCK IN THE DIST EAST CHAMPARAN FOR THE YEAR-2025-26.
Cleaning Items
Surf Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
SUPPLY AND TRANSPORTATION ON DOOR DELIVERY BASIS OF WELDING MACHINE AT HBL SUGAULI PLANT
SUPPLY OF PROOF MACHINED GUN METAL BUSH ON DOOR DELIVERY BASIS AT INTEGRATED HBL PLANT SUGAULI
STANDING ORDER RATE CONTRACT FOR SUPPLY OF SPARE PARTS WITH SERVICE SUPPORT OF PLC DCS CARDS ON DOOR DELIVERY AND CALLUP BASIS AT HBL PLANT SUGAULI EAST CHAMPARAN BIHAR
Carrying out rerouting of existing 12.75 OD pipe section of PMBPL by Horizontal Directional Drilling (HDD) method hook up through hot tapping method on existing pipeline section at ch 49.926 km
DESIGN, CONSTRUCTION, SUPPLY, TESTING AND COMMISSIONING OF PIPED WATER SUPPLY SCHEMES FOR HABITATIONS LEFT OUT UNDER ''HAR GHAR NAL KA JAL'' NISCHAY YOJNA IN AREAS HAVING NO GROUND WATER QUALITY ISSUES; WITH ELECTRIC DRIVEN PUMPS ON TURN-KEY BASIS WITH 3 MONTHS TRIAL RUN PERIOD UNDER MUKHYA MANTRI GRAMEEN PAYJAL NISHCHAY YOJNA (NON QUALITY AFFECTED) IN DIFFERENT PANCHAYATS IN BLOCK- PAHARPUR, DISTRICT - EAST CHAMPARAN UNDER P.H. DIVISION, MOTIHARI FOR YEAR 2024-25. NUMBERS OF SCHEMES - 29
DESIGN, CONSTRUCTION, SUPPLY, TESTING AND COMMISSIONING OF PIPED WATER SUPPLY SCHEMES FOR HABITATIONS LEFT OUT UNDER ''HAR GHAR NAL KA JAL'' NISCHAY YOJNA IN AREAS HAVING NO GROUND WATER QUALITY ISSUES; WITH ELECTRIC DRIVEN PUMPS ON TURN-KEY BASIS WITH 3 MONTHS TRIAL RUN PERIOD UNDER MUKHYA MANTRI GRAMEEN PAYJAL NISHCHAY YOJNA (NON QUALITY AFFECTED) IN DIFFERENT PANCHAYATS IN BLOCK- ARERAJ (PART- 2), DISTRICT - EAST CHAMPARAN UNDER P.H. DIVISION, MOTIHARI FOR YEAR 2024-25. NUMBERS OF SCHEMES - 25