Loading…
Loading…
Tender Value
₹653.4 Cr
EMD Value
₹13.1 Cr
Closing Date
11 Dec 2026, 2:30 pm
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
29/09/2026 14:30
Lowest to Highest
180 days
Expenditure
Capital (Works)
TENDER
13 conditions · 2 needing a document upload
As per RFP document attached.
As per RFP document attached.
6 conditions · 3 needing a document upload
As per RFP Document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per RFP and draft agreement document.
Engineering, Procurement and Construction (EPC) Tender for"Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 227.200) (total- 37.80 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway"
ECR-CAO-C-N-EPC-11-26-27~ECR
ECR-CAO-C-N-EPC-11-26-27
Open
Works - General
1380 Days
Purbi Champaran, Bihar
₹0
₹13.1 Cr
13 Aug 2026
13 Aug 2026
27 Nov 2026
29 Sept 2026
5 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,86,25,07,401.5 | ||
| of works as per | :- Execution | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EPCRXL-NKEDraftAgreement-EPC-11-26-27.pdf
ATTACHMENT
RFPEPC-11-26-27.pdf
ATTACHMENT
9.15mSpan-06.08.2026.pdf
ATTACHMENT
12.2PSCSLAB-06.08.2026.pdf
ATTACHMENT
30.5mSpan-06.08.2026.pdf
ATTACHMENT
SHEET-1CH188700-189060SIGNED.pdf
ATTACHMENT
SHEET-2CH188700-193700SIGNED.pdf
ATTACHMENT
SHEET-3CH193700-194370SIGNED.pdf
ATTACHMENT
SHEET-4CH194070-196760SIGNED.pdf
ATTACHMENT
SHEET-5CH196200-201200SIGNED.pdf
ATTACHMENT
SHEET-6CH201200-202800SIGNED.pdf
ATTACHMENT
SHEET-7CH202200-203780SIGNED.pdf
ATTACHMENT
SHEET-8CH203400-205600SIGNED.pdf
ATTACHMENT
SHEET-9CH205000-210000SIGNED.pdf
ATTACHMENT
SHEET-10CH210000-215000SIGNED.pdf
ATTACHMENT
SHEET-11CH215000-220000SIGNED.pdf
ATTACHMENT
SHEET-12CH220000-222400SIGNED.pdf
ATTACHMENT
SHEET-13CH221700-223000SIGNED.pdf
ATTACHMENT
SHEET-14CH222560-225500SIGNED.pdf
ATTACHMENT
SHEET-15CH224800-226400SIGNED.pdf
ATTACHMENT
SHEET-16CH225600-227760SIGNED.pdf
ATTACHMENT
Span6.10-06.08.2026.pdf
ATTACHMENT
Span18.30-06.08.2026.pdf
ATTACHMENT
Span45.7-06.08.2026.pdf
ATTACHMENT
TYPEPLANOF3.66m4.57m6.1m9.15mPSCSLABRXL-NKE.pdf
ATTACHMENT
TYPEPLANRCCBOXRXL-NKE.pdf
ATTACHMENT
6.1mPSCSlab-RDSO-BA-10257.pdf
ATTACHMENT
9.15mPSCSlab.pdf
ATTACHMENT
1636-4R_2.pdf
ATTACHMENT
2316RDSO-B-10362_12.2m_Abutmentupto4m.pdf
ATTACHMENT
2316RDSO-B-10363_12.2m_Abutmentfrom4to6mhigh.pdf
ATTACHMENT
10152-1R.pdf
ATTACHMENT
11753-1R3.pdf
ATTACHMENT
11753-2R4.pdf
ATTACHMENT
11753-3R3.pdf
ATTACHMENT
11753-4R3.pdf
ATTACHMENT
11753-5R3.pdf
ATTACHMENT
11753-6R2.pdf
ATTACHMENT
11753-R3.pdf
ATTACHMENT
17161alt-9.pdf
ATTACHMENT
17162.PDF
ATTACHMENT
17163.pdf
ATTACHMENT
17164.pdf
ATTACHMENT
17166-R1.pdf
ATTACHMENT
17167-R.PDF
ATTACHMENT
17169R.pdf
ATTACHMENT
17170-R.pdf
ATTACHMENT
17171-R.pdf
ATTACHMENT
17173R.pdf
ATTACHMENT
17175.pdf
ATTACHMENT
17176.PDF
ATTACHMENT
17177alt-3.pdf
ATTACHMENT
17178alt-3.pdf
ATTACHMENT
17181-_9R.pdf
ATTACHMENT
17181-_18_erection.pdf
ATTACHMENT
17181-_19_shipping_list.pdf
ATTACHMENT
17181-1.PDF
ATTACHMENT
17181-2.pdf
ATTACHMENT
17181-3.pdf
ATTACHMENT
17181-4RALT-2.pdf
ATTACHMENT
17181-5-RALT-3.pdf
ATTACHMENT
17181-6RALT-3.pdf
ATTACHMENT
17181-7_ALT-2.pdf
ATTACHMENT
17181-8RALT-3.pdf
ATTACHMENT
17181-10ALT-2.pdf
ATTACHMENT
17181-11ALT-2.PDF
ATTACHMENT
17181-12.PDF
ATTACHMENT
17181-13.pdf
ATTACHMENT
17181-14R.pdf
ATTACHMENT
17181-15ALT-2.PDF
ATTACHMENT
17181-16.PDF
ATTACHMENT
17181-17ALT-2.pdf
ATTACHMENT
17181-R.pdf
ATTACHMENT
26615RDSO-B-104661.pdf
ATTACHMENT
26615RDSO-B-10466-11.pdf
ATTACHMENT
2661117170-1.pdf
ATTACHMENT
B11753-7R1.pdf
ATTACHMENT
B-11760-R.pdf
ATTACHMENT
BHELWAESP.pdf
ATTACHMENT
CAO_Con_MHX_wingwall1-4.5m.pdf
ATTACHMENT
CBS-0045_Pathway_OWG.pdf
ATTACHMENT
CBS-0046.pdf
ATTACHMENT
FencingatLCgate.pdf
ATTACHMENT
GateLodgeOfLC_compressed.pdf
ATTACHMENT
GOKHULAESP.pdf
ATTACHMENT
HeightGaugeforRUBRDSOM-0001copy.pdf
ATTACHMENT
HexagonalBlockLevelcrossing1.pdf
ATTACHMENT
Highlevelpf.pdf
ATTACHMENT
KNGLIESP.pdf
ATTACHMENT
LCspeedbreker.pdf
ATTACHMENT
LineDiagramforProposedSheetPileworkatROB184.pdf
ATTACHMENT
Longitudinaldrain.pdf
ATTACHMENT
M-00003.pdf
ATTACHMENT
MARJADWAESP.pdf
ATTACHMENT
N_12714_1686036685666.pdf
ATTACHMENT
PrincipleSiteOfficeforAuthorityengg.pdf
ATTACHMENT
PurusottampurESP.pdf
ATTACHMENT
RDSO_B_10358_R2_9.15m_Pierupto4mhigh.pdf
ATTACHMENT
RDSO_B_10359_R_6.10m_Pierupto4mhigh.pdf
ATTACHMENT
RDSO_B_10375_12.20m_Pierupto4mheight.pdf
ATTACHMENT
RDSO_B_10376_12.20m_Piermorethan4.0mheight.pdf
ATTACHMENT
RDSO-10261-4.57m.pdf
ATTACHMENT
RDSO-10271-1R_12.20m_PSCSlab.pdf
ATTACHMENT
RDSO-10271R_12.20m_PSCSlab.pdf
ATTACHMENT
RDSO-10294_Footpathfor12.20m_9.15m_6.10m.pdf
ATTACHMENT
RDSO-10355_6.10mAbutmentupto4m.pdf
ATTACHMENT
RDSO-10356_6.10mAbutmentfrom4to6mheigh.pdf
ATTACHMENT
RDSO-B-1636-11HBeamsleepersforJunctions.pdf
ATTACHMENT
RDSO-B-10353_9.15m_Abutmentupto4mhigh.pdf
ATTACHMENT
RDSO-B-10354-9.15m_Abutmentfrom4to6mhigh.pdf
ATTACHMENT
RDSO-B-10357-R2_9.15m_Pierfrom4to6mhigh.pdf
ATTACHMENT
RDSO-B-10402-7.pdf
ATTACHMENT
RDSO-B-17165-R1_Alt-1.pdf
ATTACHMENT
RDSO-B-17168_Alt-3.pdf
ATTACHMENT
RDSO-B-17172Alt-3.pdf
ATTACHMENT
RDSO-B-171741.PDF
ATTACHMENT
RetainingWallonPileFDN3M4M.pdf
ATTACHMENT
ReturnWall_1.0mto2.0m.pdf
ATTACHMENT
RT-8970Ballasteddeckbridgesleeper.pdf
ATTACHMENT
RT-8971to8978Br.approachsleeper.pdf
ATTACHMENT
STComplexBulding_compressed.pdf
ATTACHMENT
SheetPile.pdf
ATTACHMENT
SIKTAESP.pdf
ATTACHMENT
SSIAGSBR47ACH195-7-8.pdf
ATTACHMENT
SSIAGSBR48CH-196-5-6.pdf
ATTACHMENT
SSIAGSBR48ACH198-5-6.pdf
ATTACHMENT
SSIAGSBR49ACH199-6-7.pdf
ATTACHMENT
SSIAGSBR49BCH-198-6-7.pdf
ATTACHMENT
SSIAGSBR49CCH198-13-14.pdf
ATTACHMENT
SSIAGSBR51CH202-5-6.pdf
ATTACHMENT
SSIAGSBR51BCH202-9-10.pdf
ATTACHMENT
SSIAGSBR52CH203-4-5.pdf
ATTACHMENT
SSIAGSBR53CH205-5-6.pdf
ATTACHMENT
SSIAGSBR-54ACH207-2-3.pdf
ATTACHMENT
SSIAGSBR54BCH207-9-10.pdf
ATTACHMENT
SSIAGSBR63CH215-9-10.pdf
ATTACHMENT
SSIAGSBR64CH219-2-3.pdf
ATTACHMENT
SSIAGSBR65ACH220-5-6.pdf
ATTACHMENT
SSIAGSBR67CH222-10-11.pdf
ATTACHMENT
SSIAGSBR68CH225-7-8.pdf
ATTACHMENT
SSIAGSBR69CH227-10-11.pdf
ATTACHMENT
SSIAGSBR-45CH190-6-7.pdf
ATTACHMENT
SSIAGSBR-46CH-192-1-2.pdf
ATTACHMENT
SSIAGSBR-46ACH-194-4-5.pdf
ATTACHMENT
SSIAGSBR-46BCH-193-11-12.pdf
ATTACHMENT
SSIAGSBR-46CCH-193-10.pdf
ATTACHMENT
SSIAGSBR-47CH-194-10-11.pdf
ATTACHMENT
SSIAGSBR49CH198-7-8.pdf
ATTACHMENT
SSIAGSBR-50CH201-10-11.pdf
ATTACHMENT
SSIAGSBR-51ACH202-8-9.pdf
ATTACHMENT
SSIAGSBR-52ACH205-3-4.pdf
ATTACHMENT
SSIAGSBR-54CH-206-3-4.pdf
ATTACHMENT
SSIAGSBR-54CH-208-4-5.pdf
ATTACHMENT
SSIAGSBR-54CCH-208-1-2.pdf
ATTACHMENT
SSIAGSBR-54DCH-208-4-5.pdf
ATTACHMENT
SSIAGSBR-55CH-208-8-9.pdf
ATTACHMENT
SSIAGSBR-55ACH-209-1-2.pdf
ATTACHMENT
SSIAGSBR-55A1CH-209-2-3.pdf
ATTACHMENT
SSIAGSBR-56CH-209-4-5.pdf
ATTACHMENT
SSIAGSBR-56ACH-209-7-8.pdf
ATTACHMENT
SSIAGSBR-57CH-209-10-11.pdf
ATTACHMENT
SSIAGSBR-57ACH-210-4-5.pdf
ATTACHMENT
SSIAGSBR-58CH-210-10-11.pdf
ATTACHMENT
SSIAGSBR-60CH-212-10-11.pdf
ATTACHMENT
SSIAGSBR-60ACH-213-4-5.pdf
ATTACHMENT
SSIAGSBR-60BCH-212-13-213-0.pdf
ATTACHMENT
SSIAGSBR-60CCH-214-2-3.pdf
ATTACHMENT
SSIAGSBR-62CH-214-8-9.pdf
ATTACHMENT
SSIAGSBR-63ACH-218-4-5.pdf
ATTACHMENT
SSIAGSBR-65CH-220-2-3.pdf
ATTACHMENT
SSIAGSBR-65BCH-221-10-11.pdf
ATTACHMENT
SSIAGSBR-65CCH-221-4-5.pdf
ATTACHMENT
SSIAGSBR-66CH-222-4-5.pdf
ATTACHMENT
SSIAGSBR-67ACH-223-4-5.pdf
ATTACHMENT
SSIAGSBR-67BCH-224-9-10.pdf
ATTACHMENT
SSIBR-59CH-211-9-10.pdf
ATTACHMENT
STbuildingatinterlockedgate.pdf
ATTACHMENT
TI-DRG-CIV-HGAUGE-RDSO-00001-05-0HEIGHTGAUGEUPTO7.3m.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].