Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.2 Cr+₹57.3 L (3.45%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹17.4 Cr
EMD Value
₹17.4 L
Closing Date
12 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PWD, Nacho Division
O/o Executive Engineer, PWD, Nacho Division, Upper Subansiri Dist. AP
C/o Road from Daporijo-Nacho BRO to ADC HQ. at Kodukha in Upper Subansiri Dist in Arunachal Pradesh (10.00 Km )
2022_PWDAP_870_1
ND/DB/NIT/CRIF/2022-23/01
Open Tender
Civil Works – Roads
Item Rate
730 days
Kodukha ADC Hq. Upper Subansiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE Nacho Division, PWD
₹17.4 L
Yes
28 Nov 2022
29 Aug 2022
12 Sept 2022
29 Aug 2022
12 Sept 2022
29 Aug 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SH:-Widdening(10.00Km)
Excavationin Hill Area in Soil by Mechanical Means (Excavationinsoil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres | 18,272.39 | Cum | 100 | ₹18,27,239 |
| 1.02 | Exacavation in Hilly Area in Ordinary Rock by Mechanical means not Requiring Blasting. (Excavation hilly area in ordinary rock not requiring ballasting by meachanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres | 1,64,451.47 | Cum | 100 | ₹1,64,45,147 |
| 2.01 | SH:-PREPARATION OF SUB - GRADE(10.00Km)
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.) | 63,000 | Cum | 10 | ₹6,30,000 |
| 2.02 | SH:-GSB(10.00Km)
Granular Sub-Base with Coarse Graded Materials (Table-2) (Construction of granular sub-base by providing coarse graded materials spreading in iniform layers with motor graded on prepared surface, mixing by in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
1. For Grading-I Materials | 6,300 | Cum | 10 | ₹63,000 |
| 3.01 | SH:-CONCRETE WORK(7.00Km)
Dry Lean Cement Concrete Sub- base (Constructionof dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blendingto be as per table 600-1,cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishingand curing.) | 4,042.5 | Cum | - | - |
| 3.02 | Cement Concrete Pavement (Construction of un-reinforced,dowel joint,plain cement concrete pavement over a prepared sub base with 43 grade cement @400kg per cum,coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not execeeding 25mm,mixed in a batching and mixing plant as per approved mixed design,transported to site ,laid with a fixed form or sliped form paver, spread ,compacted and finished in a continuose operation including provision of contraction ,expansion,construction and longitudinal joints,joint filler,separation membrane,sealant primer,joint sealant,debonding strip,dowel bar,tie rod,admixture as approved,curing compound,finishing to lines and grade as per drawing) | 4,042.5 | Cum | - | - |
| 4.01 | SH:-Slab Culvert 1.5 mtr span (11.00Nos)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
1. Ordinary soil
A. Manual means
(i). Upto 3 m depth | 186.1 | Cum | - | - |
| 4.02 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 17.73 | Cum | - | - |
| 4.03 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.
(b). Random rubble masonry | 45.74 | Cum | - | - |
| 4.04 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications | 4.32 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_978.xls
BOQ Document • 0.24 MB
104281141.pdf
Tender Document • 0.08 MB
TenderDocument.pdf
Tender Document • 3.66 MB
104281147.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .