| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.8 LAdmitted-Finance | -27.27% | ₹64.8 L | L1 | Admitted-Finance |
| 2 | L2₹68.2 LAdmitted-Finance | -23.40% | ₹68.2 L | L2 | Admitted-Finance |
| 3 | L3₹69.0 LAdmitted-Finance | -22.52% | ₹69.0 L | L3 | Admitted-Finance |
| 4 | L4₹71.3 LAdmitted-Finance | -19.90% | ₹71.3 L | L4 | Admitted-Finance |
| 5 | L5₹74.8 LAdmitted-Finance | -15.98% | ₹74.8 L | L5 | Admitted-Finance |
Tender Value
₹89.1 L
EMD Value
₹2.1 L
Closing Date
12 May 2026, 5:00 pmClosed
GENERAL MANAGER (JAL)
Water Works Compound Sector-5 Noida
M/o Gangajal (Replacement of damaged G.Jal Water line at different places in Noida Area) Noida
2026_NOIDA_1143600_1
06/SM(GANGAJAL)/ET/2026-27
Open Tender
Civil Works - Others
180 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹2.1 L
26 May 2026
29 Apr 2026
13 May 2026
29 Apr 2026
12 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required.bituminous portion | 407 | Cum. | 2,613.35 | ₹10,63,633.45 |
| 2 | Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidation each deposited layer by ramming watering etc. and disposal of surplus layer by ramming watering etc. and disposal of surplus excavated soil as directed, within a lead of 50 m: all kinds of soil. pipes, cables etc. The contractor has to dectect different utilities like sewer line,water supply line,electric cable,telephone cable gas pipe line etc using utility dectecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge ( a ) exceeding 300 mm dia but not exceeding 600 mm | 400 | Mtr. | 286.67 | ₹1,14,668 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil -The contractor has to dectect different utilities like sewer line,water supply line,electric cable,telephone cable gas pipe line etc using utility dectecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge | 1,048.8 | Cum. | 136 | ₹1,42,636.8 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundaions etc. in layers not exceeding 20 cm in depth: consolidating earth deposited layer by ramming and watering, lead up to 50m and lift upto 1.50 m. | 1,048.8 | Cum. | 93 | ₹97,538.4 |
| 5 | P/F M.S. specials such as tee, bends, collars, Tapers, gap pieces, including Flange Ends as requered, Painting, cutting,welding as per site requirement of MS pipe thickness etc in all respect as per direction by the E/I. | 97,439.47 | Kg. | 72.63 | ₹70,77,028.71 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) | 31.05 | Cum. | 6,066.29 | ₹1,88,358.3 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.05 | Cum. | 6,753.45 | ₹2,09,694.62 |
| 8 | Hiring of Diesel Engine ( including cost of Diesel, lubricant & Operator)( For Dewatering) | 50 | Hours | 238 | ₹11,900 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TD06.pdf
Tender Documents • 2.28 MB
BOQ_2136301.xls
BOQ • 0.24 MB
Capability_06.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid