Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC ALUVA | KOTTAYAM | KERALA | 686102 | ₹8.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SOCIO ECONOMIC UNIT FOUNDATION L1 |
|---|---|---|---|---|
| 1.00Installation of Biogas plant | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 126.48 | sqm | 16 ₹2,023.68 |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 31.62 | cum | 184 ₹5,818.08 |
| 1.00 | OD254694/2023-2024:Engaging man mazdor for shifting, dispossal of unserviceble material or repair of unserviceble material to make them serviceble as per the direction of engineer in charge including all necessary arrangements. | 3 | each | 1,026 ₹3,078 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 50 | hour | 350 ₹17,500 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 138.72 | cum | 335 ₹46,469.53 |
| 1.01 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 47.11 | cum | 215 ₹10,128.87 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 3.12 | cum | 7,680 ₹23,992.32 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.95 | sqm | 380 ₹1,882.52 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 5.46 | cum | 10,240 ₹55,951.36 |
Tender Value
₹8.0 L
EMD Value
₹20,004
Closing Date
9 Mar 2025, 3:00 pmClosed
Asha Raj R
Office of the Assistant Executive Engineer LID EW
KSWMP Construction of Community level biogas plant at Ward No 9 Kayamkulam Market Kayamkulam Municipality Construction of Community level biogas Municipality Construction of Community level biogas plant General Civil Work
2025_LSGD_739157_1
PW1-1875/24
Open Tender
Civil Works - Others
KAYAMKULAM MUNICIPALITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Yes
₹20,004
Yes
Kayamkulam Muncipality
21 Jan 2026
17 Feb 2025
9 Mar 2025
17 Feb 2025
9 Mar 2025
17 Feb 2025
17 Feb 2025 - 5 Mar 2025
24 Feb 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1187320.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid