| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.4 LAccepted-AOC LOWGANG SANTIR BAZAR SANTIRBAZAR SOUTH TRIPURA PIN 799144 | SOUTH TRIPURA | TRIPURA | 799144 | ₹33.4 L | L1 | Accepted-AOC Awarded the work as lowest bidder has quoted his rate twenty two point two one percent below |
| 2 | L2₹46.0 L+₹12.6 L (37.8%)Rejected-AOC VILL P O DEBIPUR GAJARIA BELONIA SOUTH TRIPURA PIN 799155 | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | ₹46.0 L+₹12.6 L (37.8%) | L2 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
Tender Value
₹42.9 L
EMD Value
₹85,862
Closing Date
13 Feb 2026, 3:00 pmClosed
Executive Engineer
O/O. the Executive Engineer, PWD(RandB) Belonia Division, South Tripura
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
2026_CEPWD_69926_1
64/NIT/SE-III/R/PWDRandB/25-26
Open Tender
Civil Works - Roads
Percentage
90 days
B.C. Nagar R.D. Block area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹85,862
14 May 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of bituminous surface road
Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. | 15 | Cum | 18,324.5 | ₹2,74,867.5 |
| 2 | Excavation for Structures
A. Without dewatering.
Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
(I) Ordinary Soil
(i)Upto 3 m depth | 5.88 | Cum | 458.2 | ₹2,694.22 |
| 3 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200
(I) Sand filling | 0.84 | Cum | 1,361.06 | ₹1,143.29 |
| 4 | Providing concrete for plain concrete ( using jhama brick aggregate ) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)
(I) P.C.C grade M 10( using jhama brick aggregate)
(i) Nominal mix 1:3:6 | 0.84 | Cum | 9,484.8 | ₹7,967.23 |
| 5 | Brick masonry work in cement mortar in foundation complete excluding pointing & plastering as per drawing & MoRD technical specifications Clauses 600, 1202 & 1203.
(I) Brick masonry in 1:4 cement mortar | 3.5 | Cum | 9,701.29 | ₹33,954.52 |
| 6 | Brick masonry work in cement mortar in substructure complete excepting pointing & plastering, as per drawing & MoRD technical specification Clauses 602, 603, 604, 1202 and 1204.
(i) In 1:4 cement mortar | 5.25 | Cum | 10,172.19 | ₹53,404 |
| 7 | Plastering with cement mortar (1:4) 12 mm thick on brickwork / C.C. work including a finishing coat of neat cement punning with 2.75 Kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204 | 17.5 | Sqm | 231.13 | ₹4,044.78 |
| 8 | WBM Grading 3
Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MoRD Technical Specification Clause 405.
I. By Manual Means | 11.81 | Cum | 7,848.3 | ₹92,711.97 |
| 9 | Prime Coat
Medium porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.20 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502. | 157.5 | Sqm | 91.46 | ₹14,404.95 |
| 10 | Tack Coat
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503. | 157.5 | Sqm | 23.5 | ₹3,701.25 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71161.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_71161.xls
BOQ • 0.29 MB
DNIeT64.pdf
Tender Documents • 2.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .