Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | As L1₹22.3 LAccepted-AOC | As L1 | Accepted-AOC L1 | |
| 2 | As L5Rejected-Finance | As L5 | Rejected-Finance As L5 | |
| 3 | As L4Rejected-Finance | As L4 | Rejected-Finance As L4 | |
| 4 | As L2Rejected-Finance GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | As L2 | Rejected-Finance As L2 | |
| 5 | As L3Rejected-Finance 4 4 FAIRLIE PLACE ROOM NO 630A HMP HOUSE KOLKATA 700001 700001 CALCUTTA CENTRAL DIVISION WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | As L3 | Rejected-Finance As L3 |
Tender Value
₹37.5 L
EMD Value
₹74,999
Closing Date
6 Feb 2019, 9:00 amClosed
Executive Engineer PWD BDN ELEC DIVN
Room no 1081st fl purta bhawan salt lake kolkata
Design Supply Installation Testing and Commissioning of 50kWp Grid Tied rooftop Solar PV Power Plant at Office Building of Purta Bhavan Salt Lake Kolkata on turnkey basis
2019_WBPWD_206304_1
WBPWD/EE/BED/73/e-IT of 2018_19
Open Tender
ELECTRICAL WORKS M/R
Item Rate
45 days
Purta Bhavan
Please refer Tender documents.
4 documents required · 4 mandatory
₹74,999
Yes
23 Sept 2021
9 Jan 2019
8 Feb 2019
14 Jan 2019
6 Feb 2019
14 Jan 2019
Amount
Supply of Solar Photovoltaic Panels.Poly Crystalline. 335Wp – 150 Nos.(Make: Websole / SOVA/Goldigreen) The PV modules used must qualify to the latest edition of IEC PV module qualification test or equivalent BIS standards Crystalline Silicon Solar Cell Modules IEC 61215/IS14286 .The rated output power of any supplied module shall have tolerance of +/- 3%.The peak-power point voltage and the peak-power point current of any supplied module and/or any module string (series connected modules) shall not vary by more than 2 (two) per cent from the respective arithmetic means for all modules and/or for all module strings, as the case may be.The module shall be provided with a junction box with either provision of external screw terminal connection or sealed type and with arrangement for provision of by-pass diode. The box shall have hinged, weather proof lid with captive screws and cable gland entry points or may be of sealed type and IP-65 rated.
Module Mounting Structure: Hot dip galvanized MS mounting structures may be used for mounting the modules/ panels/arrays. Each structure should have angle of inclination as per the site conditions to take maximum insolation.The mounting structure steel shall be as per latest IS 2062: 1992 and galvanization of the mounting structure shall be in compliance of latest IS 4Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts. Aluminium structures also can be used which can withstand the wind speed of respective wind zone. Necessary protection towards rusting need to be provided either by coating or anodization.The minimum clearance of the structure from the roof level should be 300 mm
Supply of 1 Nos. PV Array Junction Box (AJB): a) The junction box is to be provided in the PV array for termination of connecting cables. The Boxes (JBs) shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium/M.S alloy with full dust, water & vermin proof arrangement. All wires/cables must be terminated through cable lugs. The JBs shall be such that input & output termination can be made through suitable cable glands.b) Each Junction Box shall have High quality Suitable capacity Metal Oxide Varistors (MOVs) / SPDs, suitable Reverse Blocking Diodes. The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups. Voltage: Max. 1000V DC Make: Power One Microsystems
Supply of ACDB & DCDB : Designed for 50kWp solar power plant with all protections as per MNRE guidelines.DC DPBs shall have sheet from enclosure of dust & vermin proof conform to IP 65 protection. The bus bars are made of copper of desired size. Suitable capacity fuse & MCBs/MCCB shall be provided for controlling the DC power output to the PCU along with necessary surge arrestors . AC Distribution Panel Board (DPB) shall control the AC power from PCU/ inverter, and should have necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in grid tied mode.All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III/ IS60947 part I, II and III. All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air - insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts, 50 Hz.All indoor panels will have protection of IP54 or better. All outdoor panels will have protection of IP65 or better.
Supply of Grid Connected Solar Inverter Rating : 50KW, 3Ph Inverter – 1 No., Make: SMA Germany / Power One Microsystems / Siemens; Controller : Microprocessor /DSP; Capacity of Each Inverter : 50kW String Inverter; Nominal AC output voltage and frequency : 415V, 3 Phase, 50 Hz.; Output frequency : 50 Hz.; Max. DC input Power 56kW; MPPT Voltage Range 250 - 950 VDC; Max. input current per MPPT 36A. Output Voltage Range - 280V - 480V AC. Grid Frequency Synchronization range : +/- 5 Hz. Ambient temperature considered : -20 deg C to 50 deg C. Humidity : 95 % Non-condensing. Protection of Enclosure :: IP-65(Minimum) for outdoor. Grid Frequency Tolerance range : +/- 5 Hz. Grid Voltage tolerance : 280 V to 480 V. No-load losses : Less than 1% of rated power. Inverter efficiency(minimum) : >93%. THD : < 3%. Efficiency Measurement IEC 61683/ Equivalent BIS Std.Environmental testing IEC 60068-2 (1,2,14,30) / Equivalent BIS Std.Interfacing with utility grid IEC 61727. Islanding Prevention Measurement IEC 62116. EMI/EMC : IEC 61000-6-3>16 Amps IEC 61000-6-4<16 Amps. Safety: IEC - 62109-1 (2010/4) C - 62109-2 (2011/6). All above IEC’s should be from NABL/ IEC Accredited Testing Laboratories or MNRE Approved Test Centers/ International laboratories.
Supply of System Earthings : Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-1987. In addition the lighting arrester/masts should also be earthed inside the array field, PCU, ACDB and DCDB should also be earthed properly. Earth resistance shall not be more than 5 ohms. It shall be ensured that all the earthing points are bonded together to make them at the same potential.
Supply of Remote Monitoring System (GPRS Type): The RMS system is integrated or External unit. The following parameters are accessible via the operating interface display in real time separately for solar power plant: AC Voltage., AC Output current, Output Power, DC Input Voltage, DC Input Current, Power produce, Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault. The data shall be recorded in a common work sheet chronologically date wise. The data file shall be MS Excel compatible. The data shall be represented in both tabular and graphical form. Simultaneous monitoring of DC and AC electrical voltage, current, power, energy and other data of the plant for correlation with solar and environment data shall be provided
charges for related civil works of grouting of for structural erection including other jobs necessary at the time of installation the system to complete the works in all respect as per direction of EIC
Installation & Commissioning of the total installation.
L.W.C. must be quoted manually @1% on the total quoted value else the total quoted rate shall be treated incl. LWC as per rule. N.B. Rate should be quoted inclusive of GST.
POWER ONE MICRO SYSTEMS P LTD
Sohum Industrial Sales Corporation
ENVIRON SOLAR PRIVATE LIMITED
Benchmark Infotech Services Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .