Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
13 Jul 2026, 6:00 pm4d left
Executive Engineer
Providing Consultancy Services for Construction of New Weir On Narmada River between Bhadbhut Barrage and Garudeshwar Dam under jurisdiction of irrigation project sub division no.27,rajpipla Dis: Narmada
316017
9 of 2026-27
Open
Civil - All
Narmada
10 documents required · 10 mandatory
₹3,600
Executive Engineer, Irrigation Project Division 4, Rajpipla
₹2.5 L
22 Jun 2026
22 Jun 2026
22 Jun 2026
13 Jul 2026
22 Jun 2026
BILL OF QUANTITIES
BILLOFQUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50Cr.)
Name of Work: Providing Consultancy Services for Construction of New Weir On Narmada
River between Bhadbhut Barrage and Garudeshwar Dam under juridiction of
irrigation project sub division no.27,rajpipla Dis: Narmda
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to figures
book of specifications)
Jungle cutting for preliminary surveys
1. (a) Light jungle cutting (bushes, 36300 m2 13.44
FLY Level for connecting an
2. checking the B.M With double
Carrying out Sub soil investigation
3. for Soil Bearing Capacity test with
machine drilling of bore holes at
specified location including
collection of samples, laboratory
testing, submitting report including
transport and others. (Unit Rate
carried out for 10 m. depth of Bore)
Carrying out Sub soil investigation
4. for Soil Bearing Capacity test with
machine drilling of bore holes at
specified location(in big river ex.
Narmada ) including collection of
samples, laboratory testing,
submitting report including
transport and others.
Conducting a detailed bathymetric
5. survey of the river using a
calibrated echosounder for the
assessment of riverbed
morphology, channel geometry and
sedimentation characteristics. The
work shall include the mobilization
and demobilization of suitable
survey vessels or boats and all
hectare 3,500.00
associated survey equipment at site
by the contractor. The contractor
shall provide all vessels, qualified
personnel, tools, shackles,
mounting frames, survey
instruments, positioning and
navigation systems, accessories,
consumables, fuel, power supply,
and safety equipment necessary for
the complete execution of the
survey. The survey shall cover the
full width and length of the
designated river reach using a 5 mx
5 m survey grid, with proper
equipment calibration, water level
referencing, and quality control
procedures. The scope of work also
includes processing and analysis of
the collected data to generate
bathymetric contour maps at 0.5 m
vertical intervals, longitudinal (L-
section) profiles along the river
centerline, and cross-sections at
m intervals. All processed data shall
be used to develop digital
bathymetric models and to evaluate
riverbed conditions and sediment
deposition patterns. The contractor
shall submit all deliverables,
complete in all respects, in both
hard and soft copies, including
reports, drawings, digital models,
and raw survey data, in formats
acceptable to the Engineer.
Survey by using own DGPS
6. instrument for the topographical
and contour survey work in 10x10
mt grid with 0.5mt contour
interval, locating all existing hectare 2,402.00
features with preparation and
submission of survey drawing in
AO size sheet in one Hard & soft
copy etc complete.
Preparation of Pre-Feasibility
7. Report (PFR)and Detailed Project
Report(DPR)for the proposed
Gated or Ungated Weir, including
development of preliminary
engineering design, preparation of
relevant drawings, preparation of
detailed project cost estimates and
compilation of tender documents
for execution of the work under
Engineering, Procurement and
Construction(EPC)contract mode,
based on the survey data,
investigations and studies
carriedout under other items of this
contract, and in accordance with
applicable codes, standards and
departmental guidelines, complete
in all respects and suitable for
submission to the concerned
authorities for approval and
tendering purposes.
Providing Land Acquisition (LAQ)
8. consultancy services for all land
and assets falling with in the
submergence area of the proposed
weir. The scope includes side
identification and demarcation of
the submergence limits, verification 1.00
of land records, preparation of
cadastral and submergence maps,
and preparation of schedules of
affected land parcels, structures,
and assets. All deliverables shall be
submitted complete in all respects
in both hard and soft copies
Note : 1) The Price quoted in the tender are Exclusive of GST and GST Will be paid Separately.
2) Time schedule should be followed as mentioned in section
I/We/am/are willing to carry out the work at… ................. %above/below percent (Should
Be written in figures and words) of the estimated ate mentioned above Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender(For above INR 50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount(if any)%(in figure)………………………………
(C)Net Tendered Amount(A-B)(in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted asperprevailingrulesi.e.1%oftheworkdone.
3 GST and Income tax TDS will be deducted at a source while making payment so f bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt.as stated in
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost of
difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer Executive Engineer
Irrigation Project Sub Div. No.27 Irrigation Project Division No.4
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT narmada weir 202627.pdf
SBD of WEIR NARMADA (1).pdf
Item Wise specification Weir Narmada.pdf
BOQ Weir Narmada.pdf
Corrigendum -1 Uploaded Narmada Weir.pdf
CORRIGENDUM
Download all tender documents and submit your bid