| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.1 LAccepted-AOC | ₹45.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹61.9 L+₹16.8 L (37.3%)Rejected-Finance COURT ROAD UTTARKASHI | ₹61.9 L+₹16.8 L (37.3%) | L2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical BHIKYASEN ALMORA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹45.1 L
EMD Value
₹90,000
Closing Date
7 Aug 2024, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Construction of 11 KV line and S/s work for providing NSC to Bayedi Pumping Peyjal Yojana under EDD Ranikhet
2024_UPCL9_72846_1
EDC(R)-1/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Ranikhet
Asper Tender Document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹90,000
28 May 2025
2 Jul 2024
8 Aug 2024
2 Jul 2024
7 Aug 2024
2 Jul 2024
Amount
NON-CENTRALIZED MATERIAL
PP & clamp for ST pole SP-23 with Nuts & Bolts.
Stay Clamp for Single ended SP-23 with Nuts & Bolts.
Stay Clamp for Double ended SP-23 with Nuts & Bolts.
Bracing Hold Clamp SP-23 with N&B T&B.
Bracing Clamp Bottom for SP-23 with Nuts & Bolts.
Earth Wire clamp SP-23 with Nuts & Bolts.
E Clamp
LABOUR PART
Cartage of T/F from store centre to constrution site with loading ,unloading at both points and proper stocking. distance 110 km
(A) STP SP-23 Pole
(B) Small Material
(C) T/F 11/0.4 KV 25 KVA
(D) T/F 11/0.4 KV 63 KVA
Head load cartage of following from road to site (Average lead 3 km )
(A) STP SP-23 Pole
(B) Small material
(C)T/F 11/0.4 KV 25 KVA
(D)T/F 11/0.4 KV 63 KVA
Excavation of pit for pole
Erection of single SP-23 Pole
Erection of SP -23 Double Pole
Grouting of Pole
Muffing of Pole
Excavation of pit for stay set
Erection of 11 KV Stay Set
Erection of L T Stay Set
Grouting of Stay Set
Installation of 25 KVA DTR on Pole structure
Installation of 63 KVA DTR on Pole structure
Laying of Rabbit conductor in HT Line
Fabrication of Steel
Erection of erthing rod
Lopping & Choppingof tree branches
Guarding of LT/11 KV Line
Painting of SP-21/23 Pole
Inst.of danger board/number plate
Erection of 11 KV VCB (O/G or B/C or I/C)Panel
Installation of HT PRMC
SHIV ELECTRICALS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .