| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 Cr
EMD Value
₹3.1 L
Closing Date
23 Mar 2026, 5:00 pmClosed
GM CIVIL
Main Administrative Building Sector-6 Noida
Maintenance of Drain (Construction of RCC Drain on MP-3 road from Parthala Chowk to Hindon Pusta Both side), Noida
2026_NOIDA_1122154_1
34/GM/SM-WC-6/2025-26
Open Tender
Civil Works
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.1 L
21 Apr 2026
6 Mar 2026
24 Mar 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m, The Contractor has to dectect different utilities like sewer line, water supply line, electric cable, telephone cable , gas pipe line etc, using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I. All kind of soil
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform.
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level
Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable /recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @340 kg/cum).
Earth work in embankment in ordinary soil embankment to be in 20cm layer breaking clods. Watering, rolling each layer with 1/2 tonne roller or wooden roller or steel rammer and rolling every third or top most layer with power roller or minimum 8 tonne including 1.5 m lift and all lead including cartage of earth by Mechinical Transportation and all T&P labour etc. required for proper completion or work. (earth shall be arranged by the contractor at his own cost from out side of Noida)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Cold twisted bars
Please Enable Macros to View BoQ information
CAPABILITY STATEMENT
* It is compulsory for the bidder to fill this statement and the bidder must upload only those document that support this statement
Tender Reference No :- 34/GM/SM-WC-6/2025-26
Name of Tenderer
TOTAL NIT COST OF PROJECT (In Rs.)
Minimum Value
SOLVENCY (Issued within a period of minimum six months).
EXPERIENCE (WITH GOVERNMENT/SEMI- GOVERNEMTN/ PSUs ONLY) completed works during the last 7 years ending last day of the month previous to the one in which applications are invited
NOT QUALIFIED
NOT QUALIFIED
Two similar completed works each costing not less than the amount equal to 60% of estimated cost put to tender
NOT QUALIFIED
One similar completed works costing not less than the amount equal to 80% of estimated cost put to tender
For Similar of works:- dsoy Hkou fuekZ.k@ lh0lh0 jksM@ QqVikFk@ Mzsu@ ckWDl dyoVZ@ lSUVzy otZ@ isfUVax@ lM+dksa dh lkekU; ejEer@ Hkou@ pkjnhokjh@ bUVjykWfdax VkbZy@ ukyh o lhesaV ls lEcfU/kr dk;Z ds vuqHko ekU; gksaxs A lhoj o tykiwfrZ ds vuqHko ekU; ugha gksaxsA
RESULT OF EXPERIENCE
TURNOVER (During the immediate LAST 3 consecutive financial years)
Average annual financial turnover on construction works should be atleast 30% of the estimate cost during the immediate last 3 consecutive fiancial years. Affidavit should be submitted by the contractor/ firm with C.A. certificate.
Required Technical Staff
Required Machinary
Character Certificate of Indivisual /partners /directors issued by District Megistrate
Affidavit of not blacklisted
Address Proof/Id. Proof of indivisual /partners/directors.
Registration certificate of G.S.T.Department
Filled in form Capability Statement.
Certified Copies of relevant pages of following documents:
Affidavit for no blood relation in Noida Authority employee .
stage.html
html • 0.04 MB
technical_2089226.pdf
techsummary_2089226.pdf
finance_2089226.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TD.pdf
Tender Documents • 5.16 MB
BOQ_2089226.xls
BOQ • 0.87 MB
Capability.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid