Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC UTTAR PRADESH UP | ₹1.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.9 Cr+₹4.1 L (2.24%)Rejected-Finance | ₹1.9 Cr+₹4.1 L (2.24%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 Cr+₹5.7 L (3.13%)Rejected-Finance | ₹1.9 Cr+₹5.7 L (3.13%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
16 Nov 2023, 3:00 pmClosed
Chairman and Administrator, Greater Sharda Sahayak
Chairman and Administrator, Greater Sharda Sahayak Command Area Development Authority/Project, 23C, Gokhale Marg, Lucknow (U.P.)
Construction of R.C.C. Lined Channel, Unlined Channel, R.C.C. Water Controlling Structures Works.
2023_GSSCA_857539_1
08/AGR./SNP-III/2023-24 dt 26-10-2023
Open Tender
Civil Works - Others
Item Rate
365 days
BAHRAICH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.8 L
12 Mar 2024
31 Oct 2023
16 Nov 2023
31 Oct 2023
16 Nov 2023
31 Oct 2023
Amount
Earth Work in construction of Gulls/ channel manually or by tractor where ever possible and applicable,including hard clay,chharri,bajri up to 5%, including all leads and lifts, excluding mechanical compaction but inclusive of manual compaction and dressing to profile and all T & P required for proper completion of work.
Providing and laying LDPE 200 micron thick film(1st grade) on sub grade before construction of lining, gulls,structure etc including material,labour etc required for proper completion of work as per direction of engineer-in-charge.
Providing and Laying cement concrete 1:4:8 (1 cement: 4 coarse sand FM>2.0 : 8 stone grit 40mm nominal size) in foundation with mechanical mixing including cost of all material with all leads and lifts including compaction and curing etc required for proper completion of work as per directions of engineer-in-charge.
Providing and laying reinforcement cement concrete 1:2:4(M-15), (1- cement: 2- coarse sand FM>2.0: 4.75mm- 20mm nominal size aggregate) excluding cost of steel but including cost of centering and shuttering, with mechanical mixing and mechnical compaction including cost of all material,expansion joints, all leads and lifts, T & P and curing etc. required for proper completion of work as per direction of engineer-in-charge.
Providing steel reinforcement TMT bars of Primary Steel or equivalent of required dia as per drawing, including straightening, cutting ,bending,binding including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
Providing and fixing of NP3 hume pipe 300mm diameter in position and alignment including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
Providing and fixing of NP3 hume pipe 350mm diameter in position and alignment including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
M/S RISHIK ASSOCIATES
RAI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .