Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | ₹14.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.5 LRejected-AOC NO 1 684 10TH MILE IDUKKI | IDUKKI | KERALA | ₹16.5 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical ADIMALI G P | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical CHEMPANODA KATIKULAM ROAD PERAMBRA KOZHIKODE DISTRICT KERALA | KOZHIKODE | KERALA | 673525 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | SUNSIRIL ALEX L1 | ROY THOMAS L2 | Adimali Labour Contract Cooperative Soceity L4 | HIGH RANGE LABOUR CONTRACT COOPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|---|
| 1.00Building Construction | |||||||
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.61 | cum | 10,856 ₹50,024.45 | 11,500 ₹52,992 | 12,772.18 ₹58,854.21 | 12,400 ₹57,139.20 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 43.5 | cum | 11,425.81 ₹5.0 L | 11,100 ₹4.8 L | 13,442.14 ₹5.8 L | 13,200 ₹5.7 L |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 292.73 | sqm | 817.05 ₹2.4 L | 840 ₹2.5 L | 961.24 ₹2.8 L | 925 ₹2.7 L |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 102.84 | sqm | 648.44 ₹66,685.57 | 640 ₹65,817.60 | 762.88 ₹78,454.58 | 750 ₹77,130 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 61.6 | sqm | 857.26 ₹52,807.22 | 910 ₹56,056 | 1,008.55 ₹62,126.68 | 1,004 ₹61,846.40 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 9.57 | sqm | 701.08 ₹6,709.34 | 804 ₹7,694.28 | 824.81 ₹7,893.43 | 820 ₹7,847.40 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,468.32 | kilogram | 95.56 ₹4.3 L | 95 ₹4.2 L | 112.43 ₹5.0 L | 108 ₹4.8 L |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 30.71 | kg | 158.99 ₹4,883.06 | 180 ₹5,528.34 | 187.05 ₹5,744.87 | 180 ₹5,528.34 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 11.18 | cum | 6,556.5 ₹73,301.67 | 7,050 ₹78,819 | 7,713.54 ₹86,237.38 | 7,650 ₹85,527 |
Tender Value
₹16.9 L
EMD Value
₹42,373
Closing Date
14 Jan 2026, 4:00 pmClosed
ASSISTANT ENGINEER
LID and EW SECTION OFFICE, ADIMALI
ADLY-Plan 2025-26 Office Construction for Handed overed institution in adimali GP-381/2025-26
2026_LSGD_825805_1
LSGD/CELSGD/TR/135772/2025
Open Tender
Civil Works - Buildings
240 days
ADIMALI
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹42,373
Yes
5 Feb 2026
7 Jan 2026
16 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
Amount
Building Construction
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
OD350284/2025-2026:Roofing with GI Trafford profiled sheets 0.35mm thick,powder coated with overlaps of 150mm at ends and SS screws including plain washers and bitimen washers etc..complete
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
OD350369/2025-2026:Providing and Fixing of good quality granite name board with lettering including of all cost,conveyance,labour charges etc complete
ROY THOMAS (BID ID -2457852)
HIGH RANGE LABOUR CONTRACT COOPERATIVE SOCIETY (BID ID -2458020)
Adimali Labour Contract Cooperative Soceity (BID ID -2457935)
Bidder Name
SUNSIRIL ALEX
Adimali Labour Contract Cooperative Soceity
HIGH RANGE LABOUR CONTRACT COOPERATIVE SOCIETY
ROY THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.92 MB
BOQ_1384924.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid