Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.7 L+₹13,508.58 (3.79%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.8 L+₹19,011.82 (5.33%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.2 L+₹66,562.31 (18.7%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | Rajeev L1 | SHAJAHAN P L3 | JAYAKUMAR B L2 | J SUDHEEN PILLAI L4 |
|---|---|---|---|---|---|---|---|
| 1.00Maintanance of Muzhathangu Anganvadi | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 18.25 | cum | 217.13 ₹3,962.62 Lowest | 228.69 ₹4,173.59 | 225.35 ₹4,112.64 | 257.63 ₹4,701.75 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.65 | cum | 6,685.83 ₹24,403.28 Lowest | 7,042.02 ₹25,703.37 | 6,938.9 ₹25,326.99 | 7,932.89 ₹28,955.05 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.12 | cum | 7,784.07 ₹2,50,024.33 Lowest | 8,198.77 ₹2,63,344.49 | 8,078.7 ₹2,59,487.84 | 9,235.97 ₹2,96,659.36 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 58.4 | sqm | 707.61 ₹41,324.42 Lowest | 745.31 ₹43,526.1 | 734.4 ₹42,888.96 | 839.6 ₹49,032.64 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 391.86 | kilogram | 94.75 ₹37,129.11 Lowest | 99.8 ₹39,108.03 | 98.34 ₹38,535.91 | 112.43 ₹44,057.27 |
Tender Value
₹4.2 L
EMD Value
₹10,585
Closing Date
10 Nov 2025, 6:00 pmClosed
The Assistant Engineer, LSGD Section, Yeroor GP
The Assistant Engineer, LSGD Section, Yeroor GP
2025 26 Yeroor GP Annual Plan Fund Maintenance of Muzhathangu Anganwadi 188 2025 26
2025_LSGD_818204_7
08/2025/AE/LSGD/YER
Open Tender
Civil Works - Buildings
Item Rate
180 days
Yeroor GP
Please refer Tender documents.
6 documents required · 6 mandatory
₹935
Yes
₹10,585
Yes
3 Feb 2026
1 Nov 2025
12 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371243.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1371243.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .