| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC | ₹12.2 L | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹12.4 LRejected-Finance | ₹12.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹12.7 LRejected-Finance THOTTASSERI HOUSE ALIPPARAMBA POST MALAPPURAM 679357 | MALAPPURAM | MALAPPURAM | KERALA | 679357 | ₹12.7 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Shameem L2 | Mohammed Rafeeq T. L3 | M HUSSAIN L1 |
|---|---|---|---|---|---|---|
| 1.00INTERLOCKING WORK | ||||||
| 1.01 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 31.32 | cum | 241.13 ₹7,552.07 | 245.86 ₹7,700.30 | 236.63 ₹7,411.25 |
| 1.02 | 2.7.1
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 282.04 | cum | 484.71 ₹1.4 L | 494.22 ₹1.4 L | 475.67 ₹1.3 L |
| 1.03 | 16.78.1
Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 70.51 | cum | 3,119.85 ₹2.2 L | 3,181.09 ₹2.2 L | 3,061.68 ₹2.2 L |
| 1.04 | OD149849/2025-2026
55.22 Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. | 313.38 | sqm | 1,163.93 ₹3.6 L | 1,186.78 ₹3.7 L | 1,142.23 ₹3.6 L |
| 1.05 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 31.32 | cum | 3,737.76 ₹1.2 L | 3,811.13 ₹1.2 L | 3,668.07 ₹1.1 L |
| 1.06 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate
20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 43.5 | cum | 7,809.26 ₹3.4 L | 7,962.53 ₹3.5 L | 7,663.65 ₹3.3 L |
| 1.07 | 4.4.1
Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing.1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.06 | cum | 9,135.83 ₹18,847.23 | 9,315.14 ₹19,217.14 | 8,965.49 ₹18,495.81 |
| 1.08 | 10.26.3
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 159.84 | kg. | 211.53 ₹33,811.60 | 215.69 ₹34,475.25 | 207.59 ₹33,181.19 |
| 1.09 | OD63857/2025-2026
Fabrication, Supply, Conveyance & Installation of Granite Name board indicating the cost involved. the commencement, completion and inauguration date etc. | 0.68 | sqm | 3,644.96 ₹2,460.35 | 3,716.5 ₹2,508.64 | 3,577 ₹2,414.48 |
Tender Value
₹12.2 L
EMD Value
₹30,444
Closing Date
23 Sept 2025, 1:00 pmClosed
Sr. Manager
SILK FOUNDRY UNIT.PALAPPURAM P.O,OTTAPALAM.PALAKKAD- 679 103
Interlock works at KSRTC Depot Yard Malappuram, Malappuram Proposed by Hon.MLA Sri.P Ubaidulla-General Civil Work- Project No- 23060
2025_SILK_797773_1
SILK/FUO/TD/2025-26/15
Open Tender
Miscellaneous Works
360 days
Malappuram
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹30,444
Yes
6 Jun 2026
16 Sept 2025
24 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
16 Sept 2025 - 23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid