| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MOIDUKUTTY EK L1 | faisal k L2 |
|---|---|---|---|---|---|
| 1.00RENOVATION WORK | |||||
| 1.00 | OD438555/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 17.28 | cum | 695.8 ₹12,023.42 | 700 ₹12,096 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.88 | cum | 330.4 ₹3,925.15 | 335 ₹3,979.80 |
| 1.00 | OD438574/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 27.84 | cum | 3,668 ₹1.0 L | 3,670 ₹1.0 L |
| 1.00 | OD438608/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 10.37 | cum | 1,576 ₹16,339.97 | 1,580 ₹16,381.44 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.75 | cum | 7,286.5 ₹12,744.09 | 7,290 ₹12,750.21 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.42 | cum | 8,483.4 ₹20,563.76 | 8,490 ₹20,579.76 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 2.7 | sqm | 354.6 ₹957.42 | 360 ₹972 |
Tender Value
Refer Docs
EMD Value
₹4,220
Closing Date
19 Feb 2026, 10:00 amClosed
Assistant Engineer
Assistant Engineer Municipal Office Perinthalmanna
Annual Plan-2025-26-PROJECT NO 620- IMPROVEMENT WORKS TO GMLP S C H O O L C E N T R A L A T PERINTHALMANNA MUNICIPALITYGeneral Civil Work
2026_LSGD_836036_7
14/ME/LIDandEW/PMNA/ET/2025-26
Open Tender
Civil Works - Roads
Perinthalmanna
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹4,220
Yes
25 Apr 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
RENOVATION WORK
OD438555/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD438574/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD438608/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
620.rar
Tender Documents • 1.68 MB
BOQ_1406985.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid