| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -25.00% | ₹1.1 L | L1 | Admitted-Finance |
| 2 | L1₹1.1 LAdmitted-Finance | -25.00% | ₹1.1 L | L1 | Admitted-Finance |
| 3 | L2₹1.2 L+₹14,675.66 (13.3%)Admitted-Finance | -15.00% | ₹1.2 L+₹14,675.66 (13.3%) | L2 | Admitted-Finance |
| 4 | L3₹1.2 L+₹14,690.33 (13.3%)Admitted-Finance | -14.99% | ₹1.2 L+₹14,690.33 (13.3%) | L3 | Admitted-Finance |
| 5 | L4₹1.4 L+₹26,416.19 (24.0%)Admitted-Finance | -7.00% | ₹1.4 L+₹26,416.19 (24.0%) | L4 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹2,940
Closing Date
6 Aug 2026, 6:00 pmClosed
XEN
Nowshera
Repair and maintenance of pip line from Sailsoo to Singri under District Capex Budget (BDC Mogla).
2026_PHE_318586_3
e-NIT No.12 of 2026-27
Open Tender
Civil Works
Percentage
21 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
XEN
₹2,940
Yes
10 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in
a) All kind of soil. | 14.4 | cum | 479.3 | ₹6,901.92 |
| 2 | b) Ordinory rock. | 3.6 | cum | 924.8 | ₹3,329.28 |
| 3 | Providing and fixing of G.I. pipes complete with G.I. fitting excluding trenching and refilling etc. (External work)
a) 40mm dia | 25 | Mtr | 434.65 | ₹10,866.25 |
| 4 | b) 25mm dia | 175 | Mtr | 311.95 | ₹54,591.25 |
| 5 | Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and left upto 1.5mtr. (Deduct for not rolling and watering the excavated earth) | 16.2 | cum | 180.55 | ₹2,924.91 |
| 6 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge 15mm to 40mm nominal bore. | 440 | Mtr | 109.65 | ₹48,246 |
| 7 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
a) 40 mm dia. G.I. pipes. | 240 | Mtr | 44.85 | ₹10,764 |
| 8 | b) 25 mm dia. G.I. pipes. | 200 | Mtr | 33.7 | ₹6,740 |
| 9 | Labour engage for rethreading, making ends and cutting of G.I.pipe including carriage etc.
a) Labour | 3 | Nos | 553 | ₹1,659 |
| 10 | b) Fitter | 1 | No | 734 | ₹734 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1050765.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .