Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-Finance LOCATION UTTARAKHAND UT | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹13.5 L+₹1,598.60 (0.12%)Rejected-Finance | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹13.7 L+₹20,580.90 (1.53%)Rejected-Finance HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | L3 | Rejected-Finance Third lowest bidder |
| Sl No | Description | Qty | Unit | Shri Ganesh Enterprises L3 | JAI LAKSHMI ASSOCIATE L2 | AJAY KUMAR CHAUHAN L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY | ||||||
| 2.00 | Stay clamp for SP23 double ended | 120 | Nos | 274 ₹32,880 | 275 ₹33,000 | 273 ₹32,760 Lowest |
| 3.00 | LT clamp with N&B ST pole SP-21 | 242 | Nos | 193 ₹46,706 Lowest | 195 ₹47,190 | 193 ₹46,706 Lowest |
| 4.00 | Stay clamp for SP-21 with N&B | 252 | Nos | 205 ₹51,660 | 200 ₹50,400 Lowest | 205 ₹51,660 |
| 5.00 | Earth wire clamp for SP-23 with N&B | 60 | Nos | 280 ₹16,800 | 270 ₹16,200 Lowest | 275 ₹16,500 |
| 6.00 | PP & clamp with N&B ST pole SP-23 | 243 | Nos | 160 ₹38,880 | 175 ₹42,525 | 150 ₹36,450 Lowest |
| 7.00 | Shackle insulator 75x90mm with nuts & Bolts | 242 | Nos | 60 ₹14,520 Lowest | 60 ₹14,520 Lowest | 60 ₹14,520 Lowest |
| 8.00 | Stay Insulator | 58 | Nos | 25 ₹1,450 | 23 ₹1,334 | 20 ₹1,160 Lowest |
| 9.00 | Bracing clamp top for SP-23 with N&B | 100 | Nos | 250 ₹25,000 | 250 ₹25,000 | 248 ₹24,800 Lowest |
| 10.00 | Bracing clamp bottom for SP-23 with N&B | 100 | Nos | 245 ₹24,500 | 239 ₹23,900 Lowest | 243 ₹24,300 |
Tender Value
₹13.5 L
EMD Value
₹41,000
Closing Date
30 Jan 2024, 4:00 pmClosed
EE,EDD,Ranikhet
EDD,Ranikhet
Construction of line for releasing new connection under EDSD,Dwarahat
2024_UPCL9_67223_1
11/2023-24
Open Tender
Electrical Works
Item Wise
365 days
Dwarahat
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE,EDD,Ranikhet
₹41,000
22 Jun 2026
8 Jan 2024
31 Jan 2024
8 Jan 2024
30 Jan 2024
8 Jan 2024
Amount
SUPPLY
Stay clamp for SP23 double ended
LT clamp with N&B ST pole SP-21
Stay clamp for SP-21 with N&B
Earth wire clamp for SP-23 with N&B
PP & clamp with N&B ST pole SP-23
Shackle insulator 75x90mm with nuts & Bolts
Stay Insulator
Bracing clamp top for SP-23 with N&B
Bracing clamp bottom for SP-23 with N&B
LABOUR CHARGE
Errection of Earthing rod
Fabrication of steel
Excavation of pit for stay set
Errection of LT stay set
Grouting of stay set
excavation of pit for pole
Errection of single SP-21 pole
Errection of single SP-23 pole
Errection of SP-23 double pole
Grouting of pole
Muffing of poles
Installation of 100 KVA DTR on pole structure
Installation of 63 KVA DTR on pole structure
Installation of 25 KVA DTR on pole structure
Laying of rabbit conductor in HT line
Laying of 3P 4 wire LT line (weasel)
Laying of 1P 2 wire LT line(weasel)
Cartage of SP-21/23 pole, 100-150 Km
Cartage of petty material ,100-150 km
Cartage of 16/25 KVA DTR 100-150 km
Cartage of 63 KVA DTR 100-150 km
Cartage of 100 KVA DTR 100-150 km
Head load cartage of SP-21/23 pole (1-3km)
Head load cartage of material (1-3 km)
Head load Cartage of 16/25 KVA DTR (1-3 km
Head loadCartage of 63 KVA DTR (0-1km
Head loadCartage of 100 KVA DTR(0-1 km
JAI LAKSHMI ASSOCIATE
Shri Ganesh Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .