Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹30.7 L (8.08%)Admitted-Finance | ₹4.1 Cr+₹30.7 L (8.08%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹51.4 L (13.5%)Admitted-Finance | ₹4.3 Cr+₹51.4 L (13.5%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 Cr+₹1.7 Cr (44.7%)Admitted-Finance 24 4 D SECTOR GOVINDPURA INDUSTRIAL AREA BHOPAL BHOPAL MADHYA PRADESH 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹5.5 Cr+₹1.7 Cr (44.7%) | L4 | Admitted-Finance |
| 5 | L5₹6.3 Cr+₹2.5 Cr (66.5%)Admitted-Finance 45 E SECTOR INDUSTRIAL AREA GOVINDPURA GOVINDPURA BHOPAL MADHYA PRADESH 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹6.3 Cr+₹2.5 Cr (66.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | T S Industrys L1 | Bansal Laboratories and Equipments Pvt Ltd L4 | Bhopal Engineering L5 | Shri Vishwakarma Fabricators L2 | SUDHIR BROTHERS L6 | Dunhil Products L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | PREFABRICATION MACHINING & FABRICATION OF LP CASING FRONTWALL DRG. 01073858100, REV-07 AND AS PER CBOM 01073858000 ITEM 1 ASSY OF ALL ITEMS I.E. ITEM 1-1 TO 1-49. | 2,62,448 | KG | 1,61,27,429.6 ₹1,90,30,366.93 | 1,28,59,952 ₹1,51,74,743.36 Lowest | 2,88,69,280 ₹3,40,65,750.4 | 1,73,21,568 ₹1,94,00,156.16 | 3,14,93,760 ₹3,71,62,636.8 | 1,90,79,969.6 ₹2,25,14,364.13 |
| 2.00 | PREFABRICATION MACHINING & FABRICATION OF LP CASING UPPER PART TURBINE SIDE DRG. 01074058100, REV-07 AND AS PER CBOM 01074058000 ITEM 1 ASSY OF ALL ITEMS I.E. ITEM 1-1 TO 1-63. | 1,09,368 | KG | 78,14,343.6 ₹92,20,925.45 Lowest | 1,64,05,200 ₹1,93,58,136 | 1,20,30,480 ₹1,41,95,966.4 | 94,05,648 ₹1,05,34,325.76 | 1,31,24,160 ₹1,54,86,508.8 | 84,97,893.6 ₹1,00,27,514.45 |
| 3.00 | PREFABRICATION MACHINING & FABRICATION OF LP CASING UPPER PART GENERATOR SIDE DRG. 01074058200, REV-00 AND AS PER CBOM 01074058000 ITEM 10 ASSY OF ALL ITEMS I.E. ITEM 10-1 TO 10-63. | 1,15,224 | KG | 82,32,754.8 ₹97,14,650.66 Lowest | 1,72,83,600 ₹2,03,94,648 | 1,26,74,640 ₹1,49,56,075.2 | 99,09,264 ₹1,10,98,375.68 | 1,38,26,880 ₹1,63,15,718.4 | 89,52,904.8 ₹1,05,64,427.66 |
Tender Value
Refer Docs
Closing Date
27 Jun 2026, 6:00 pmClosed
RAM JANAK
BHEL BHOPAL
PRE FABRICATION OF LP CASING FRONT WALL,UPPER PART TURBINE SIDE AND GENERATOR SIDE -03 ITEMS
2026_BHEL_62011_1
E2563013 PRE FAB. OF LP CASING FRONT WALL,UPPER PART TURBINE SIDE AND GENERATOR SIDE -03 ITEMS
Open Tender
Miscellaneous Services
Fixed-rate
70 days
BHEL BHOPAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
14 Jul 2026
6 Jun 2026
29 Jun 2026
6 Jun 2026
27 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PREFABRICATION MACHINING & FABRICATION OF LP CASING FRONTWALL DRG. 01073858100, REV-07 AND AS PER CBOM 01073858000 ITEM 1 ASSY OF ALL ITEMS I.E. ITEM 1-1 TO 1-49. | 2,62,448 | KG | - | - |
| 2 | PREFABRICATION MACHINING & FABRICATION OF LP CASING UPPER PART TURBINE SIDE DRG. 01074058100, REV-07 AND AS PER CBOM 01074058000 ITEM 1 ASSY OF ALL ITEMS I.E. ITEM 1-1 TO 1-63. | 1,09,368 | KG | - | - |
| 3 | PREFABRICATION MACHINING & FABRICATION OF LP CASING UPPER PART GENERATOR SIDE DRG. 01074058200, REV-00 AND AS PER CBOM 01074058000 ITEM 10 ASSY OF ALL ITEMS I.E. ITEM 10-1 TO 10-63. | 1,15,224 | KG | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.80 MB
TECHNICAL.pdf
Tender Documents • 0.16 MB
BOQ_67199.xls
BOQ • 0.28 MB
OTHERDOCUMENTS.pdf
Additional Documents • 35.06 MB
DRAWINGS.pdf
Other Document • 13.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .