Tender Value
₹2.4 Cr
EMD Value
₹4.7 L
Closing Date
10 Apr 2026, 3:00 pmClosed
GTL Div- OHE Modifications for the proposed Additional Loop line at S.Uppalapadu (SUPP) in Yerraguntla (YA) - Nandyal (NDL) Section
GTL-TRD-29-eTN-97-2025-26~SCR
GTL-TRD-29-eTN-97-2025-26
Open
Works - General
12 Months
Nandyal, Andhra Pradesh
₹0
₹4.7 L
10 Apr 2026
20 Mar 2026
27 Mar 2026
A2-FOUNDATION ITEMS (incl. Supply & Erection) 4868464.00 Below/P
Item Breakup - A1-OHE & PSI Items
Per Design and Drawing Track KM Total 200660.00 Item- 2 3(a)-Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/3(a)-Extra Charges for Erection of Traction MT Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations under Power Block. Total 55440.00 Item- 3 3(b)-Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/3(b)-Extra Charges for Erection of TTCs, MT Portals and Small Parts Steel (SPS) under Power Block Total 1984710.00 Item- 4 3(e) -Supply and Erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/3(e)-Extra Charges for Erection of Guy Rod Each Assembly under Power Block Total 185136.00 Item- 5 4(a)(i)-Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/4(a)(i)-Extra Charges for Erection of Single Each Cantilever Assembly for Conventional OHE under Power Block Total 1038150.00 Item- 6 4(a)(ii)-Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/4(a)(ii)-Extra Charges for Erection of Two Each Cantilever Assemblies on same structure or support for Conventional OHE under Power Block Total 48570.00 Item- 7 4(a)(iii)-Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/4(a)(iii)-Extra Charges for Erection of Three Each Cantilever Assemblies on same structure or support for Conventional OHE under Power Block Total 37180.00 Item- 8 6(a)-Supply and Erection of Regulated Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Per Supply/Material Track KM
Per Erection/Labour Track KM Total 181582.50 Item- 9 7(c)-Erection of Large Span Wire (130 Sq. mm) S No. Item Description of Item Unit Qty Rate Amount No GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Erection/Labour
32/7(c)-Extra Charges for Erection of Large Span Metre Wire (130 Sq. mm) under Power Block Total 66240.00 8(a)(v)-Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 10 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/8(a)(v)-Extra Charges Regulating Equipment With Counter-Weight assembly for Conventional OHE under Power Block Total 471498.00 8(a)(xii)-Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA Item- 11 locations. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1110.00 Item- 12 8(b)(ii)-Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/8(b)(ii)-Extra Charges Materials for Termination of Conventional OHE under Power Block Total 83528.00 9(a)-Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 13 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Material
32/9(a)-Extra Charges for Erection of Anti-creep Each with galvanized steel wire for Conventional OHE under Power Block Total 86232.00 Item- 14 11(a)(i)-Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/11(a)(i)-Extra Charges for Erection of 25 kV Each Solid Core Cut-in Insulator under Power Block Total 13124.00 Item- 15 11(a)(ii)-Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/11(a)(ii)-Extra Charges for Erection of 25 kV Each Solid Core Suspension Insulator under Power Block Total 12040.00 Item- 16 11(b)-Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Supply/Material
Erection/Labour
32/11(b)-Extra Charges for Erection of 25 kV Post Each Insulator under Power Block Total 18264.00 12(a)-Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional Item- 17 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/12(a)-Extra Charges for Erection of 25 kV Each Section Insulator Assembly for Conventional OHE Total 232656.00 13(a)-Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 18 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/13(a)-Extra Charges for Erection of 25 kV Each Single Pole Isolator without earth contact assembly under Power Block Total 91820.00 15(a)-Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) Item- 19 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/15(a)-Extra Charges for Erection of 50 sq.mm Each Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) under Power Block Total 14680.00 15(b)-Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) Item- 20 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour
32/15(b)-Extra Charges for Erection of 160 or Each 105 sq.mm Copper Jumper (Isolator Jumper, G- Jumper) under Power Block Total 20916.00 Item- 21 16(a)-Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 68220.00 Item- 22 16(b)-Supply and Erection of Longitudinal Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 17560.00 Item- 23 16(c)-Supply and Erection of Transverse & Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Erection/Labour Total 12770.00 Item- 24 16(d)-Supply and Erection of Structure Bond on Platform Area S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 119610.00 Item- 25 16(aa)-Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11770.00 Item- 26 17(a)-Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 29148.00 Item- 27 17(b)-Supply and Erection of Earth Bus S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 21040.00 31(a) -Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 28 Cantilever Assembly from old Mast or Support S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(a) -Extra Charges for Transfer of Overhead Each Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support under Power Block Total 299200.00 Item- 29 31(c) -Dismantling of Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Per Erection/Labour Track KM
Per 32/31(c) -Extra Charges for Dismantling of Track Overhead Equipment under Power Block KM Total 13957.00 Item- 30 31(e) -Splicing and Extension of Anchored OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(e) -Splicing and Extension of Anchored Set OHE under Power Block Total 10232.00 Item- 31 31(f) -Dismantling of Section Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(f) -Extra Charges for Dismantling Section Insulator under Power Block Total 10488.00 Item- 32 31(h) -Dismantling of an Isolator GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(h) -Extra Charges for Dismantling of an Each Isolator under Power Block Total 7120.00 Item- 33 31(i) -Dismantling of Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(i) -Extra Charges for Dismantling of Post Each Insulator under Power Block Total 8064.00 Item- 34 31(j)(i) -Dismantling of Suspension Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(j)(i) -Extra Charges for Dismantling of Each Suspension Insulator under Power Block Total 1976.00 Item- 35 31(j)(ii) -Dismantling of Cut-in Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(j)(ii) -Extra Charges for Dismantling of Cut- Each in Insulator under Power Block Total 2356.00 Item- 36 31(k)(i) -Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(k)(i) -Extra Charges for Dismantlement of Each OHE Mast or structure by cutting under Power Block Total 122480.00 Item- 37 31(k)(ii) -Dismantlement of Upright of TTC/Portal by cutting S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(k)(ii) -Extra Charges for Dismantlement of Each Upright of TTC/Portal by cutting under Power Block Total 280064.00 Item- 38 31(l)(i) -Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(l)(i) -Extra Charges for Retrieval of Each Traction Masts, Main Masts of Switching Station, TTC Uprights etc under Power Block Total 92160.00 Item- 39 31(n) -Dismantling of Guy Rod S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(n) -Extra Charges for Dismantling of Guy Each Rod under Power Block Total 12576.00 Item- 40 31(p)-Dismantling of Drop Arms/Booms/ Temporary Masts GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(p)-Extra Charges for Dismantling of Drop MT Arms/Booms/ Temporary Masts under Power Block Total 107180.00 Item- 41 31(r)-Dismantling of Cantilever Assembly including Insulators S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(r)-Extra Charges for Dismantling of Each Cantilever Assembly including Insulators under Power Block Total 4800.00 Item- 42 31(s) -Dismantling of Fabricated Steel or Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(s) -Extra Charges for Dismantling of MT Fabricated Steel or Small Parts Steel (SPS) under Power Block Total 7090.00 31(t)(i) -Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly Item- 43 for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(t)(i) -Extra Charges for Dismantling of a Each Regulating Equipment (Three-pulley type) with counter weight assembly for Conventional OHE under Power Block Total 30504.00 Item- 44 31(t)(iii) -Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(t)(iii) -Extra Charges for Dismantling of Each Anti-creep with galvanized steel wire or cadmium catenary wire under Power Block Total 8880.00 Item- 45 31(t)(iv) -Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(t)(iv) -Extra Charges for Dismantling of all Each types of Copper Jumpers under Power Block Total 5600.00 Item- 46 31(t)(v) -Dismantling of Termination for Conventional type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32/31(t)(v) -Extra Charges for Dismantling of Each Termination for Conventional type Overhead Equipment under Power Block Total 8240.00 Item- 47 31(t)(ix) -Re-adjustment of OHE Spans, including droppers S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
32/31(t)(ix) -Extra Charges for Re-adjustment of Each OHE Spans, including droppers under Power Span Block Total 700160.00 Item- 48 31(t)(x) -Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 8700.00 Item- 95 36(a)-Unloading of all types of Steel Structures S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 8400.00 Item- 96 36(b)-Loading of all types of Steel Structures S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 14400.00 Item- 97 37(a)-Unloading of all types of Copper & Aluminium conductors S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 360.00 Item- 98 37(b)-Loading of all types of Copper & Aluminium conductors S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 360.00 Item- 99 38-Transportation of OHE structures / Materials / Equipments S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 162400.00 Item- 39(a)-Erection of Released Guy Rod 100 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( a ) - Erection of Released Guy Rod Total 4480.00 Item- 39(b)-Erection of Released Cantilever Assembly 101 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( b ) - Erection of Released Cantilever Each Assembly Total 118600.00 Item- 39(c)-Erection of Released Regulating Equipment 102 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( c ) - Erection of Released Regulating Each Equipment Total 67152.00 Item- 39(d)-Erection of Released Termination 103 GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( d ) - Erection of Released Termination Total 22400.00 Item- 39(f)-Erection of Released 25 kV Post Insulator 104 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( f ) - Erection of Released 25 kV Post Each Insulator Total 4452.00 Item- 39(g)-Erection of Released Section Insulator 105 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( g ) - Erection of Released Section Each Insulator Total 35624.00 Item- 39(h)-Erection of Released 25 kV Single Pole Isolator 106 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( h ) - Erection of Released 25 kV Single Each Pole Isolator Total 32624.00 Item- 39(i)-Erection of Released Copper Jumper 107 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( i ) - Erection of Released Copper Jumper Each Total 6800.00 Item- 39(j)-Erection of Released Anti-creep 108 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour
32 / 39 ( j ) - Erection of Released Anti-creep Total 22470.00 Item- 40(a)-Supply and Erection of Number Plate (Enamel Type) 109 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 36960.00 Item- 40(b)-Supply and Erection of Number Plate (Retro-Reflective Type) 110 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 23960.00
Item Breakup - A2-FOUNDATION ITEMS (incl. Supply & Erection)
cum 2(a)(ii)-Concrete for foundations and plinth in Rocky Soil
cum 2(b)-Concrete for foundations and plinth in other than Hard and Rock Soil
cum 2(i)-Breaking of foundation up to 200 mm below track formation and drain / PF surface etc
cum Total 4868464.00
Item Breakup - B1-STEEL SUPPLY
MT 3(bs)-Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts
MT 3(cs)-Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Portals.
Item Breakup - B2-COPPER SUPPLY
Kg 6(ds)-Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire
Kg 7(cs)-Supply of 130 sq.mm Cadmium Copper Large Span Wire
Kg 15(as)-Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire
Kg 15(bs)-Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire
Item Breakup - B3-INSULATOR SUPPLY
Set GUNTAKAL DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 8(bx)-Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii)
Each 11(bx)-Supply of Post Insulator for Item no. 11(b)
Each 12(ax)-Supply of Sectioning and 9-ton Insulators for Item no. 12(a)
Set 13(ax)-Supply of Post and Operating Rod Insulators for Item no. 13(a)
Set Total 698355.00
Item Breakup - C -GENERAL ITEMS
Each Total 17040.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
97-2025-26TenderMasterdocument.pdf
ATTACHMENT
97-2025-26ExplanatoryNotes.pdf
ATTACHMENT
97-2025-26StandardGeneralConditionsofcontract.pdf
ATTACHMENT
GCCCorrectionSlips__compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .