| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹34.2 CrAccepted-AOC AT KRISHI UTPADAN BAZAR SAMITY KATRA BAZAR PATNA CITY PATNA 800008 | NA | NA | 800008 | ₹34.2 Cr | L-1 | Accepted-AOC AOC |
| 2 | L-2₹38.1 Cr+₹4.0 Cr (11.6%)Rejected-Finance | ₹38.1 Cr+₹4.0 Cr (11.6%) | L-2 | Rejected-Finance Rejected. Other than L-1 |
| 3 | L-3₹38.8 Cr+₹4.6 Cr (13.6%)Rejected-Finance SRI KRISHNA VIHAR COLONY ROAD NO 74 SHANTI KUNJ BEUR ANISHABAD PATNA 800 002 | PATNA | PATNA | BIHAR | 800002 | ₹38.8 Cr+₹4.6 Cr (13.6%) | L-3 | Rejected-Finance Rejected. Other than L-1 |
| 4 | L-4₹42.7 Cr+₹8.5 Cr (24.9%)Rejected-Finance 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | ₹42.7 Cr+₹8.5 Cr (24.9%) | L-4 | Rejected-Finance Rejected. Other than L-1 |
| 5 | L-5₹47.8 Cr+₹13.6 Cr (39.7%)Rejected-Finance | ₹47.8 Cr+₹13.6 Cr (39.7%) | L-5 | Rejected-Finance Rejected. Other than L-1 |
| Sl No | Description | Qty | Unit | SETH GHANSHYAM DAS LAKHMAMI AND CO L7 | NIRMAL SALES CORPORATION L3 | SHRISTI DEVELOPERS PRIVATE LIMITED | MAA BHAGWATI ASSOCIATES L6 | NARSINGH DEVELOPERS LLP L5 | UMAKANT SINGH L1 | M/s MATRISWA CONSTRUCTION PRIVATE LIMITED L2 | CHHABINDRA KUMAR PRADHAN L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00BUILDINGS & STRUCTURE (Sch 'A' PART-I) | |||||||||||
| 1.01 | Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 35,84,00,000.00 inserted by the MES in Schedule ‘A’ Part-I. | 1 | LUMP SUM | 49,42,84,500 ₹49,42,84,500 | 38,58,25,292.29 ₹38,58,25,292.29 | - | 50,00,00,000 ₹50,00,00,000 | 44,95,00,000 ₹44,95,00,000 | 33,36,41,520 ₹33,36,41,520 Lowest | 34,72,00,000 ₹34,72,00,000 | 43,50,20,000 ₹43,50,20,000 |
| 2.00EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | |||||||||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 64,06,967.70 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 33,25,200 ₹33,25,200 Lowest | 34,55,700 ₹34,55,700 | - | 51,00,000 ₹51,00,000 | 39,00,000 ₹39,00,000 | 79,66,087 ₹79,66,087 | 55,00,000 ₹55,00,000 | 38,44,180.62 ₹38,44,180.62 |
| 3.00INTERNAL ELECTRIFICATION (Sch 'A' PART-III) | |||||||||||
| 3.01 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 13,81,978.96 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 13,15,600 ₹13,15,600 | 15,43,845.6 ₹15,43,845.6 | - | 15,00,000 ₹15,00,000 | 15,89,000 ₹15,89,000 | 16,58,375 ₹16,58,375 | 11,85,000 ₹11,85,000 Lowest | 13,81,978.96 ₹13,81,978.96 |
| 4.00ROAD, PATH, CULVERT AND HARDSTANDING (Sch 'A' PART-IV) | |||||||||||
| 4.01 | Lump sum price worked out by the Contractor for “ROAD, PATH, CULVERT AND HARDSTANDING” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,45,25,416.38 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 1,82,52,660 ₹1,82,52,660 | 1,52,28,797.9 ₹1,52,28,797.9 | - | 1,88,00,000 ₹1,88,00,000 | 1,80,00,000 ₹1,80,00,000 | 1,67,04,228 ₹1,67,04,228 | 1,30,25,000 ₹1,30,25,000 Lowest | 1,45,25,416.38 ₹1,45,25,416.38 |
| 5.00AREA DRAINAGE (Sch 'A' PART-V) | |||||||||||
| 5.01 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 22,55,110.65 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 22,79,450 ₹22,79,450 | 23,83,685.98 ₹23,83,685.98 | - | 30,66,000 ₹30,66,000 | 24,95,000 ₹24,95,000 | 25,93,376 ₹25,93,376 | 19,25,000 ₹19,25,000 Lowest | 22,55,110.65 ₹22,55,110.65 |
Tender Value
₹43.5 Cr
EMD Value
₹15 L
Closing Date
17 Feb 2026, 6:00 pmClosed
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
PROVN OF TECHNICAL BUILDING AND ALLIED WORKS (PH-II OF TWO PHASES) AT KATIHAR UNDER AGE(I) KATIHAR
2025_MES_744172_1
98807BENG/SZ/E8
Open Tender
Civil Works
Lump-sum
730 days
KATIHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
AGE (I) KATIHAR
₹15 L
Yes
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA
1 Sept 2026
11 Dec 2025
24 Feb 2026
11 Dec 2025
17 Feb 2026
15 Jan 2026
11 Dec 2025 - 20 Dec 2025
26 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDINGS & STRUCTURE (Sch 'A' PART-I) | |||||
| 1.01 | Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 35,84,00,000.00 inserted by the MES in Schedule ‘A’ Part-I. | 1 | LUMP SUM | 35,84,00,000 | ₹35,84,00,000 |
| 2EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | |||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 64,06,967.70 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 64,06,967.7 | ₹64,06,967.7 |
| 3INTERNAL ELECTRIFICATION (Sch 'A' PART-III) | |||||
| 3.01 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 13,81,978.96 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 13,81,978.96 | ₹13,81,978.96 |
| 4ROAD, PATH, CULVERT AND HARDSTANDING (Sch 'A' PART-IV) | |||||
| 4.01 | Lump sum price worked out by the Contractor for “ROAD, PATH, CULVERT AND HARDSTANDING” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,45,25,416.38 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 1,45,25,416.38 | ₹1,45,25,416.38 |
| 5AREA DRAINAGE (Sch 'A' PART-V) | |||||
| 5.01 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 22,55,110.65 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 22,55,110.65 | ₹22,55,110.65 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_833283.xls
BOQ • 0.27 MB
Complete_Tender_Except_BOQ.pdf
Tender Documents • 4.84 MB
Drgs.rar
Additional Documents • 19.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .