Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Ok |
Tender Value
Refer Docs
Closing Date
31 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Regional officer, MoRTH Thiruvananthpuram
The Regional Officer MoRTH Government of India Regional Office Kerala Lakshadweep Region Public Office Building, Opposite to Museum Thiruvananthapuram 695 033
Consultancy Services for DPR Preparation for 2 Lane Paved Shoulder / 4 lane road including junction improvements and bypasses between km 62/100 (Anjilimoodu - Near Chenganur Town) to Kumily Km 215/450 of NH 183 in the state of Kerala
2025_MoRTH_875496_1
RW/TRI/OE/NH-183/239/2025-26
Open Tender
Civil Works - Roads
Item Rate
300 days
(Anjilimoodu - Near Chenganur)
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
As per RFP
Exempted
Office of RO MoRTH Thiruvananthapuram
27 Feb 2026
1 Sept 2025
3 Nov 2025
2 Sept 2025
31 Oct 2025
2 Sept 2025
10 Oct 2025
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total
Remuneration for Expatriate Staff
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Grand Total including goods and service tax (for all 3 phases)
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services Insurances shall not be allowed separately. These will be incidental to main items. Rates for all items shall be quoted in figures as well as in words.
BoQ_Ver3.0
Bidder Name :
Estimate of Local Currency Costs REMUNERATION FOR LOCAL PROFESSIONAL STAFF
NUMBER #
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Meterial cum Geotechnical Engineer - Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specilist
Quantity Surveyor / Documentation Expert
Land Acquistion Expert
Utility Expert
Sub Total
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
Note:*Payment shall be released as per rates quoted in above table. However, proof of remuneration paid to professional staffs in previous month shall be submitted along with current month's bill. The remunerationn to professional staff shall be paid by the DPR consultant after adjusting overhead charges as mentioned in Form II (Format of Financia proposal).
BoQ_Ver3.0
Bidder Name :
II. Support Staff
NUMBER #
Office Manager
Typist
Office Boy
Night Watchman
BoQ_Ver3.0
Bidder Name :
III.Transportation (Fixed Cost)
NUMBER #
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
BoQ_Ver3.0
Bidder Name :
IV.Duty Travel to Site (Fixed Costs)
NUMBER #
Duty Travel to Site (LS)
BoQ_Ver3.0
Bidder Name :
V.Office Rent (Fixed Costs)
NUMBER #
The office rent includes electricity and water charges, maintenance, cleaning, repairs, etc
BoQ_Ver3.0
Bidder Name :
VI. Office Supplies, Utilities and Communication ( Fixed Costs )
NUMBER #
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
BoQ_Ver3.0
Bidder Name :
VII. Office Furniture and Equipment ( Rental ) [ Fixed monthly cost ]
NUMBER #
BoQ_Ver3.0
Bidder Name :
VIII.Reports and Document Printing
NUMBER #
Draft Feasibility Report
Final Feasibility Report
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
BoQ_Ver3.0
Bidder Name :
IX. Survey and Investigation
NUMBER #
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
BoQ_Ver3.0
Bidder Name :
B. Investigation (Fixed cost)
NUMBER #
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Sub Total
BoQ_Ver3.0
Bidder Name :
C. NET WORK SURVEY AND GPR
NUMBER #
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
BoQ_Ver3.0
Bidder Name :
X Cost of supply and fixing boundary pillars
NUMBER #
BoQ_Ver3.0
Bidder Name :
XI. Land Acquisition Team including support staff and logistics/ transportation
NUMBER #
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (A)
Grand total (A)
B: Logistic for Land Acquisition Team :
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of logistics for land acquisition teams (B)
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Note: The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for easch 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team).
BoQ_Ver3.0
Bidder Name :
Estimate of Cost for Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances
NUMBER #
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-6
STAFF
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
RFP.pdf
Tender Documents • 4.51 MB
BOQ_920324.xls
BOQ • 0.91 MB
Reply_NH183.pdf
PDF • 0.10 MB
NH183.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .