Loading…
Loading…
Tender Value
₹30.0 L
EMD Value
₹29,997
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Dy.City Engineer
Repairing, Renovation and Maintanance work diff. Muni.Building, Muni.School and other Muni.Building in Shahibaug ward.
346937
Central Zone E-Tender Notice No.07/2026-2027 Tender No.163
Open
Civil Works - Others
Works
Ahmedabad
₹1,500
Municipal Commissioner, Ahmedabad
₹29,997
20 Sept 2026
20 Sept 2026
20 Sept 2026
28 Sept 2026
20 Sept 2026
Name of work: - bægÍtul Ntnectd Jtuzobtk bt^wvwht rJM<thbtk ytJuj ngt< Bgwrl. Nt¤tytu/Bgwrl. rcÕzedtu <ubs
y.Bgw.ftu. nM<flt yLgrcÕzedtubtk sYhe hevuhed/heltuJuNl/buLxulLm fhJtlt ftb ctc<. (yu.yth.me. xuLzh)
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate
sealed tenders from interested contractors for the following work at different locations
within the limit of A.M.C.
1 Name of work bægÍtul Ntnectd Jtuzobtk bt^wvwht rJM<thbtk ytJuj ngt< Bgwrl. Nt¤tytu/Bgwrl. rcÕzedtu <ubs
y.Bgw.ftu. nM<flt yLgrcÕzedtubtk sYhe hevuhed/heltuJuNl/buLxulLm fhJtlt ftb ctc<.
(yu.yth.me. xuLzh)
2 Estimated Tender Amount
Rs. 2999674.61 (exclusive of GST). GST will be paid extra
by AMC/Authority at prevailing rate to the contractor
3 Tender fee Rs. 1500/-
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
Tender Fee shall be submitted physically along with the Physical
4 Time Limit 12 Months (Excluding Moonsoon)
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E1” class having in Road Works in PWD in Govt. R&B / CPWD /
AMC or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit Rs.29,997.00 (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to in 10.0 below. Demand Draft/Bank Guarantee shall be from approved
list of AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for 120 days. E.M.D. shall be
submitted physically along with the Physical Submission.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be submitted
to Assistant Manager- Central Zone, 3rd Floor, B – Wing, Sardar Patel
Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as non
responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on
www.teder.nprocure.com website as per Schedule mentioned in Notice
inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ
Documents as per check list given in tender shall be submitted physically
in two copies (Original & duplicate) in sealed envelope as per Schedule
mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The tenders
Tenders. received after latest schedule date and time will not be entertained
under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified. Price Bid
shall be submitted physically duly signed & seal without mentioning
quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
Signature of bidder Page
Ahmedabad Municipal Corporation
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular. and the
issuing branch of bank guarantee shall be of Ahmedabad City only. The
validity of the Security Deposit shall be up to valid till 90 days beyond
Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of contract
attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 GST condition This rate shall be without GST. As Per New slab GST 18% Additional paid
when finally estimate approval. as per circular no.38 Dt.21.11.2022
19 Penelty Clause AMC Online modules ccrs complain with in sla time limit to work any
how completed, if not completed and indicate after converted to beyond
Sla in this case a penelty will have to be paid in deposited in Amc.
Penalty Clause mention for your knowledge at page no. 41 &
• All the circulars which were published by Authorities of AMC time by time will
be applicable on said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner
reserves the rights to reject any or all the tenders without assigning any
reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital
Signatory. In case authorized signatory holding Power of Attorney and
Digital Signatory are not the same, the bid shall be considered non-
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Signature of bidder Page
Ahmedabad Municipal Corporation
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- bægÍtul Ntnectd Jtuzobtk bt^wvwht rJM<thbtk ytJuj ngt< Bgwrl.
Nt¤tytu/Bgwrl. rcÕzedtu <ubs y.Bgw.ftu. nM<flt yLgrcÕzedtubtk sYhe
hevuhed/heltuJuNl/buLxulLm fhJtlt ftb ctc<. (yu.yth.me. xuLzh)
I/We the undersigned have carefully gone through and clearly understood the
Tender documents of above mentioned project comprising of Notice Inviting tenders,
Articles of Agreement, Scope of work, Definition of terms, notes
Instructions/Information to Bidder, Condition of Contract, special condition of contract,
Appendices, Specifications, Bill of Quantities, furnished by AHMEDABAD MUNICIPAL
I/We do hereby offer to execute and complete the whole of the work within
the time specified all in accordance with the specification, designs, drawing and
instruction in writing referred to in the said document and with such materials as
mentioned for, at the respective rates which I/we have quoted in the Price Bid or at
such other rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an
agreement and when required, execute the contract, according to your form 1 of
agreement as or in default where of I/we bound myself/ourselves to forfeit the
"Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days
or as decided by AMC from the date of receipt of letter of acceptance, you will forfeit
the earnest money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money
Deposit", for the sum as mentioned in NIT, the full value of which is to be absolutely
forfeited to the Employer If I/We fail to commence the work specified. Otherwise the
Employer shall retain the said sum, as on account of such Security Deposit as provided
for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be
approved in accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the
lowest or any tender, which are received. I / We also understand & agree that
Municipal Commissioner Reserves the right to allot number of tenders to successful
bidders at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within
days from the date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters
mentioned in the tender terms and conditions. I am also bound to submit all
supporting Genuine Original documents as and when asked and if any discrepancy
found in such documents as well as in the executed Work with respect to
Quality/Quantity at any stage of work or even after completion of work, it will be solely
my Responsibility. I am bound to prove originality of all documents submitted by me
Signature of bidder Page
Ahmedabad Municipal Corporation
and if any Documents found false/fake then Municipal Commissioner/AMC has right to
take any action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any
inferior quality and/or the construction of road is found to be of an inferior quality
under this contract than in such case Municipal Commissioner/AMC has right to debar/
blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and
State), Octroi duties, Royalty on material (i.e. Aggregate, Sand etc.) And any other
taxes prevailing and from time to time on such items on which the same are leviable
and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of bidder Page
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad
Municipal Corporation (referred to as Employer in these documents) invites
sealed bids for the construction of works (as defined in these documents and
referred to as “the work”) detailed in the table given in the Invitation for Bid
(hereinafter called as IFB.) from competent bidder. The bidders may submit
bids for the works detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility
criteria as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned
in the Clause-14. An agency that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of
its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or
the firms those are blacklisted/ debarred for specified period by AMC,
Governement of Gujarat, Government of India or any other entity controlled by
it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register “D” class having in Road Works in PWD in
Govt. R&B / CPWD / AMC or equivalent register with any other state Govt. or
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they
are subject to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits
and attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delays in completion, litigation history, or
financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices
for the purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer
and other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder
changes his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
Signature of bidder Page
Ahmedabad Municipal Corporation
• The envelope does not show on the outside the reference of bid and thus gets
opened before the due date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause
of Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the
bidder(s) for their misleading or false representations in the forms statements
etc. for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission
of his Bid. Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit,
examine and familiarize himself with the site of Works and its surroundings
including source of earth, water, road aggregates etc. and obtain all
information that may be necessary for preparing the Bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at
the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of
compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work
changes and thereby total amount of work increases / decreases up to any
changes and thereby total amount of work increases / decreases up to any
• If the works gets delayed / postponed for some administrative / technical
decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if
remain idle and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and
addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
Signature of bidder Page
Ahmedabad Municipal Corporation
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, forms, Annexes in the bid
document. Failure to comply with the requirements of bid documents shall be
at the bidder’s own risk. Bids which are not substantially responsive to the
requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the
bidding documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be
placed on website www.nprocure.com The prospective bidder shall refer to
website to check any addendum before 24 hours of opening of bids. AMC will
not give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum
into account in preparing their bids, the Employer may, at his desecration,
extend as necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails
to do so than also the changes made through such addendum shall be
applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following
documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance
with these Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-
Above original documents in physical form in two copies, one marked as
“original” and other marked as “Duplicate”, shall be submitted in a sealed
envelope by 18:00 Hrs on the date of physical submission of bid and addressed
to the addressee given in the NIT duly super scribed “Name of Work, Bid due
date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based
on the percentage rate in the Bill of Quantities submitted by the bidder..
Signature of bidder Page
Ahmedabad Municipal Corporation
• All duties, taxes, and other levies payable by the contractor under the contract,
or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder, except otherwise stated in the Bid document.
Employer will not compensate the bidder (contractor) for any change in duties,
taxes and other levies payable by the contractor under the contract and any
• The percentage rate and bid price quoted by the bidder shall be fixed up to the
completion of Work and shall not be subject to adjustment on any account,
except where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall
be made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A
bid valid for a shorter period shall be rejected by the Employer as non-
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the
Employer may request that the bidders may extend the period of validity for a
specified additional period. The request and the bidders' responses shall be
made in writing or by cable. A bidder may refuse the request without forfeiting
his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid, but will be required to extend the validity of his
bid security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of
IFB as part of his bid, in the form of Demand Draft / pay order / Bank
Guarantee in favour of Municipal Commissioner, Ahmedabad valid for
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad /
Gandhinagar City only.
A. As per Government of Gujarat G.R. No. - FD/MSM/e-file /4 /2023/ 4020/D.M.O.
Date: 11/03/2024 & Circular of Finance Department, AMC no. 10 Date: 05-08-
2024, approved Banks are Guarantees issued by following banks will be
accepted as SD/EMD on permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period up
to March- 31, 2025. The validity cut-off date in the GR is with respect to the
date of issue of Bank Guarantee irrespective of the date of termination of Bank
1. Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
Signature of bidder Page
Ahmedabad Municipal Corporation
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the
Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be
treated as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3
bidders will be returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest
tenders, will be returned when the successful bidder has furnished the
required security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder
has signed the Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid
Signature of bidder Page
Ahmedabad Municipal Corporation
b) in the case of a successful Bidder, if the Bidder fails within the specified time
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing
branch of the bank guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial
Stamp papers of requisite value in accordance with the stamp Act applicable to
that particular state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security
shall clearly indicate in (block letters) his name, designation, Power of Attorney
No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly
signed/initialed by the executing officers and the last page shall be signed in
full, indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in
separate envelopes and the three sealed envelopes shall be sealed in an outer
envelope. The Bid envelopes shall be marked as follows:-
• Complete Tender Document with stamp all necessary qualification related
documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as
“Technical Bid” and sealed. This Outer envelope should mention the name of
firm of bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c)Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume
no responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be
received by the Employer at the address specified in bid information not later
than the date indicated on the face sheet of the document. In the event of the
specified date for the submission of bids declared a holiday for the Employer,
the Bids will be received up to the appointed time on the next working day. The
Bidder is further required to submit Documents in Physical Form on or before
Signature of bidder Page
Ahmedabad Municipal Corporation
the Bid Due Date and before the time of submission as specified in NIT, at the
following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through
(n) procure e-tendering portal on account of delay in submission at bidder's
end. Bidder shall ensure that they submit the bid well before the "Due Date &
Time of Bid- Submission". AMC shall not be responsible if bidder is not able to
submit the bid on account of failure in network/internet connection or any
other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with respective Clause, in which case all rights and
obligations of the Employer and the bidders previously subject to the original
deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment /
corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be
rejected and returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be
returned unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by writing, facsimile or
e-mail confirmed by registered letter. This letter (hereinafter and in the
Conditions of Contract called the “Letter of Acceptance” will state the sum that
the Employer will pay the Contractor in consideration of the execution,
completion, and maintenance of the Works by the Contractor as prescribed by
the Contract (hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject
only to the furnishing of a Security Deposit in accordance with the provisions of
The agreement will incorporate all correspondences between the Employer
and the Successful Bidder. It will be signed by the Employer and the Successful
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement
within 28 days after the successful bidder (hereinafter called the Contractor)
receives the Letter of Acceptance, unless they agree otherwise, subject to
furnishing the security deposit before signing the Agreement with the
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful and
release their Earnest Money Deposit / Bid Security.
Signature of bidder Page
Ahmedabad Municipal Corporation
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder
shall deliver to the Employer a security deposit in the form of Bank Guarantee
for an amount equivalent to 5% of the Contract Price valid for the period of
valid till 90 days beyond Date of completion of work. The Security Deposit shall
be payable in 10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of
Rs.10.0 Lacs and above)from date of receipt of LOA failing which interest @ 4%
per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of
the Employer, from Ahmedabad branch of any Banks mentioned in the clause
no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill
including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late
submission of security deposit or late renewal of bank guarantee for the
number of days delayed for submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be
same verbatim as per the format. Bank Guarantee shall be submitted on right
value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause
22.1 shall constitute sufficient grounds for cancellation of the award and
forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing
value of the contract the BG value shall be enhanced accordingly. Validity of BG
shall be commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the
Employer under the terms of this Contract or any other contract or on any
other account whatsoever may be deducted from Security Deposit. Also in the
event of the Contractor's Security Deposit being reduced by reasons of such
deductions, as aforesaid, the Contractor shall, within 14 days of receipt of
notice of demand from the Engineer-in-Charge, make good the deficit in
Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of
validities of Bank Guarantees as may have been furnished by the Contractor
from time to time, are required to be extended/renewed, the Contractor shall
get the validity periods of such guarantees extended/renewed, and furnish
these to the Engineer-in- Charge one month before the expiry date of the
aforesaid Guarantees originally furnished failing which the existing Bank
Guarantees shall be invoked by the Engineer – in – charge. Also in case of any
deficit in securities on any account as might occur or is noticed, the Contractor
shall forthwith recoup/replace the same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever
activities as per contract are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the
contractor after 45 days of completion date / Final Bill paid date which ever is
later. No interest on the amount of Security Deposit shall be paid to the
Contractor at the time of release of Security Deposit as stated above.
Signature of bidder Page
Ahmedabad Municipal Corporation
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an
agreement at Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner,
Ahmedabad shall be final and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or
arbitration resulting from Contractors completed or under execution by him
over last five years. If the details of Litigation History are hidden by the Bidder
and later on it comes to the knowledge of the Employer, the Bidder shall be
disqualified for the proposed work and other appropriate actions shall be taken
against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Value of showing
Name of Reasons/Details for
Year Employer the Project
Project litigation/arbitration Present
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents
otherwise the same shall be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or
any partner of a joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it
comes to knowledge of the employer the bidder shall be disqualified for the
proposed work and other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder
Additional City Engineer
Date: Ahmedabad
Municipal Corporation
Signature of bidder Page
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended
time limit, the Contractor shall pay penalty of 10% of amount of actual
remaining work. The amount of work for which the scope of contractor is
reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no.
Date: 23/05/2017 and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money.
Such retention money shall be released in the final bill of the said work.
AMC reserves right to deduct any amount to compensate the poor
performance of the contractor i.e. poor quality or abandoned / incomplete
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not
subcontract any portion of Work without the approval of the Employer’s
Representative. Any subcontracting shall not relieve the Contractor from
any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for
which the name of the subcontractor and scope of works activities to be
performed by him is already stated in the contract or supply of material or
engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Bid document to carry out the functions
stated in the Schedule or other personnel approved by the Engineer. The
Engineer will approve any proposed replacement of key personnel only if
their qualifications, abilities, and relevant experience are substantially equal
to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning
reasons thereof, for his misconduct or inadequacy of technical skills and
experience, who is a member of the Contractor’s staff or his work force, the
Contractor shall ensure that the person leaves the Site within seven days
and has no further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts
shall not be erected on the site of work and contractor shall make his own
arrangements to provide such accommodations as per the rules of the local
bodies. He shall make his own arrangements for housing, stores, field office
etc. He shall submit a site layout plan indicating the location of various site
facilities to be created by him at his cost for the execution of work. The
Owner shall in no way be responsible for any delay on this account and no
claim on this account whatsoever shall be entertained. All Basic amenities
shall be provided by the Contractor to Labours as per the prevailing labour
Signature of bidder Page
Ahmedabad Municipal Corporation
5.1 The Contractor shall have full regard throughout execution, completion and
defects liability period to following safety aspects and shall take all
necessary steps to ensure that danger to safety is avoided all the time in
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or
indirectly engaged by him for the works
• Safety of all the employees including persons working on other contracts of
Employer at the same site of the Employer and Engineers employees
engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards,
fencing, warning signs, barricading, and cones; when and where necessary,
or required by Engineer in Charge or by any duly constituted authority for
the protection of the works or for the safety and convenience of the public
5.3 The Contractor shall take all reasonable steps to protect the environment
on and off the site and avoid damage or nuisance to persons or property of
the public and others arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout
execution, completion, and defects liability period. The contractor shall be
responsible for and to make good all injuries, damages and repairs,
rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall
be provided by the contractor. Nothing extra shall be payable on this
account. It shall be provided strictly with double scaffolding system with all
the accessories etc. with adjustable suitable working platforms to access the
areas, with ease for working and inspection. It shall be designed to take all
incidental loads. It should cater to the safety features for workmen. It shall
be ensured that no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and
displayed during day as well as night time by the contractor, wherever
required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection
required, by him, shall be made by the Contractor at his own cost and also
necessary permissions directly from relevant Owners shall be obtained by
him under intimation to the Owner. Also all initial and running charges and
security deposit, if any in this regard shall be borne by him. The Contractor
shall abide by all the rules/ bye laws applicable in this regard and he shall be
solely responsible for any penalty on account of violation of any of the rules
and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety
precautions, the same shall be completely contractor’s responsibility. All the
losses due to such accidents and expenses of legal matters shall be borne by
Signature of bidder Page
Ahmedabad Municipal Corporation
5.9 The Contractor shall be responsible for maintenance and watch and ward of
the complete installation and shall also be responsible for any pilferage,
theft, damage, penalty etc. in this regard. The Contractor shall indemnify
the Owner against any claim arising out of pilferage / theft, damage, penalty
etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for
the work. Necessary protective and safety equipments shall be provided to
them by the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean.
All wreckage rubbish, excess materials, temporary works no longer required
will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment,
surplus materials, rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a.The schedule-B shall contain Memorandum showing items for the
construction, installation, testing, and commissioning work to be done by
the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The
Contractor shall be paid only quantities calculated after taking
measurements of executed work. The rate stated in the schedule B for each
item of work shall apply. The works shall be measured by the Contractor
jointly with the authorized representative of the Engineer and all particulars
required by the representative of the Engineer shall be supplied by the
c. The work shall be measured net. No allowance for general or local custom,
working space etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form,
quality or quantity of the works or any part thereof that may, in his opinion,
be necessary and for that purpose, or if for any other reason it shall, in his
opinion, be appropriate, he shall have the authority to instruct the
Contractor to do and the Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the
Change any specified sequence or timing of construction of any part of
9.2 No such variation shall in any way vitiate or invalidate the contract, but the
effects, if any, of all such variations shall be valued in accordance with the
following sub clauses. Provided that where the issue of an instruction to
vary the Works is necessitated by some default or breach of contract by
Signature of bidder Page
Ahmedabad Municipal Corporation
contractor or for which he is responsible, any additional cost attributable to
such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of
the Engineer. No instruction is required for quantities varying from those
provided for the items in the contract schedule B.
10.1 The basis for the valuation of variations for addition to the Contract Price
shall be as follows in the same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate
b) The contractor shall be bound to execute extra items of work as directed by
the Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities
where there is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be
carried out by the Contractor and he shall be paid at the rate fixed by
Employer which shall be fixed as lowest of the rates derived by rate analysis
based on the following three methods. , the priority of the documents
forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department,
Year 2021-22, the rate of extra item shall be that rate and premium (above
or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery
and equipment, the cost of all temporary and incidental works, the
overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour
costs, the cost of use of all plant, machinery, and equipment, the cost of all
temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the
Contractors profit shall be taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and
prices as are, in his opinion appropriate and shall notify the Contractor
accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on
account payments to be included in the Interim Payment Certificates, until
rates and prices are agreed as final by the Employer, the Contractor, and the
10.6 The Contractor shall not be entitled to additional payment for costs, which
could have been avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
Signature of bidder Page
Ahmedabad Municipal Corporation
under the law. The Employer shall pay the Contractor the amounts certified
by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to
corrections in previous certificates or as a result of an award from disputes
review experts, Contractor shall be paid such amount only. The Contractor
shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be
paid for by the Employer and shall be deemed covered by other rates and
prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central,
State and Local Governing bodies prevailing on the date of award of the
contract. The Contractor will have to pay all such taxes and duties for the
performance of this Contract. The Employer will deduct from the
Contractor’s monthly and other payments all taxes and duties, which he is
bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the
Central & State and local Governing bodies, all orders, decrees of bodies,
tribunals having any jurisdiction or authority which in any manner affect
those engaged or employed, and anything related to carrying out the work.
All the bye-laws lay down by AMC/AUDA and any other local bodies while
executing the work shall be adhered to. All taxes of local bodies shall be
borne by the contractor. The Contractor shall arrange to give all notices
required by any authority and to pay to such authority all the fees that may
have to be paid for the material, plants, equipments etc. The Contractor
shall also adhere to all traffic restrictions notified by the local authorities.
He shall protect and indemnify the Owner and its officials & employees
against any claim or liability arising out of violations of any such laws,
ordinances, orders, decree, whether by himself or by his employees or his
authorized representatives. Nothing extra shall be payable on these
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R.
No. CWA/2004-1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable)
shall be deducted from every bills which shall be deposited to Govt. Labour
Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
Signature of bidder Page
Ahmedabad Municipal Corporation
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works
between the Start Date and the end of the Defects Correction periods shall
be remedied by the Contractor at the Contractor's cost if the loss or damage
arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of
Completion of the Works and the Engineer will do so upon deciding that the
Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to
Bid after receipt by him of a Notice to this effect from the
Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after
received notice
3. Has failed to comply with a notice issued or an instruction issued within
days after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to
continue performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior
written permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors, or
carries on business under receive, trustee or manager for the benefit of his
creditors, or if any act is done or event occurs which (under applicable Laws)
has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving
days notice to the contractor, terminate the contract and expel the
contractor from the site. However, in the case of sub-paragraphs (h), the
Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any
other rights of the Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange
for any other entities to do so. The Employer and these entities may then
use any goods, contractor’s documents and other design documents made
by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the
(a) the Contractor stops work for 14 days when no stoppage of work is shown
on the current Program and the stoppage has not been authorized by the
Signature of bidder Page
Ahmedabad Municipal Corporation
(b) the Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within
a reasonable period of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days
for which the maximum amount of liquidated damages becomes payable as
defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering,
giving, receiving or soliciting of anything of value to influence the action of a
public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of the Borrower, and includes collusive practice among Bidders
(prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Borrower of the benefits of free
and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed above, the Engineer shall
decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for
18.9 If the Contract is terminated the Contractor shall stop work immediately,
make the Site safe and secure and leave the Site as soon as reasonably
possible and handover the site to the Employer including all materials and
plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for
the accuracy of the same. He shall also be responsible for the correctness of
the positions, levels, dimensions, and alignment of all parts of the structures
as per instructions given to him. If at any time any error shall appear during
the progress of any part of the work, the contractor shall at his own
expense rectify such error if called upon to the satisfaction of the Engineer
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation
arises out of or under this Contract against the contractor the same may be
deducted by the Municipal Corporation from any sum then due or which at
any time thereafter may become due to the contractor under this contract
and failing that under any other contract with the Municipal Corporation or
from any sum due to the contractor with the Municipal Corporation (which
may be available with Municipal Corporation), or from his retention money,
or he shall pay the claim on demand. The Municipal Corporation reserves
the right to carry out post payment audit and technical examination of the
final bill including all supporting vouchers, abstracts, etc.
Signature of bidder Page
Ahmedabad Municipal Corporation
20.2 The Municipal Corporation further reserves the right to enforce recovery of
any over payment when detected notwithstanding the fact that the amount
of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is
discovered in respect of any work done by the Contractor or alleged to have
been done by him under the contract, it shall be recovered by the
Municipal Corporation from the contractor by way of all the means
prescribed above or if any under payment is discovered by the Municipal
Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at
any time thereafter become due before payment is made to the contractor
from him to the Municipal Corporation on any other contract account
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to
dismantle any part for reasons other than on account of bad or imperfect
work, the materials obtained from dismantling will be the property of the
A.M.C. and will be disposed of as per instruction of Engineer-in-charge in
the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the
following matters, whether such disputes arise during the progress of the
work or after the completion or abandonment thereof, shall be referred an
independent Arbitrator appointed by AMC as far possible in consultation
with the agency if it is necessary and such disputes shall be settled in
accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in
or upon the works of the site thereof or belonging to the contractor or
procured by him and intended to be used for execution of the work or any
part thereof possession of which may have been taken by the Engineer-in-
charge under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause
from the items of works not accepted as completed fully in accordance with
the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with
the instructions of the Engineer-in-charge under clause 14 and the rates for
which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be
purchased by the contractor before receipt of notice given by the Engineer-
in-charge under clause 15 and/or amount of compensation payable to the
contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay
under clause 17 in the event of this failure to rectify, remove or reconstruct
the work within the period specified in the written intimation or the amount
of expenses incurred by the Engineer-in-charge under the said clause17 in
Signature of bidder Page
Ahmedabad Municipal Corporation
rectifying, removing or re-executing the work or in removing and replacing
the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under
clause 17 for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as
estimates and assessed under clause
(viii) The amount payable to the contractor for the work carried out under
clause 33 in accordance with the instructions and the requirement of the
Engineer-in-charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving
reasons and calculations to every item of claims. The decision will have to
be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal
Corporation approaching on Court of Law. It shall be within the jurisdiction
where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge
under clause 5 to take possession of all or any tools, plants, materials and
stores in or upon the works of site thereof belonging to the contractor or
procured by him and intended to be used for the execution of the work or
any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by
the contractor in any work or from removing such materials to other places,
during the period the work is stopped or suspended in pursuance, of notice
given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in
accordance with the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when
asked by AMC. No separate payment will be made to the contractor for this.
. The contractor shall have to submit the same in hard copy as well as soft
copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon,
except those permitted under clause 59.1, shall be taken, or permitted to
be taken by the Contractor or by any of his employees or any employees of
his sub-Contractors without the prior approval of the Engineer in writing.
No photographs/ videography shall be published or otherwise circulated
without the approval of the Engineer in writing.
Seal and Signature of the Bidder
AdditionalCity Engineer
Date: Ahmedabad
Municipal Corporation
Signature of bidder Page
Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg
mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu
ybœtJtœ BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gtœebtk hSMxuNl fhtJJtlwk
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj
xuLzh mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug
<ubs ftb fhJt mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt
ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj
bkswhe ylwmth <&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc
ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t
yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt<
hM<t, vtKe btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle
juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt
<&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu,
rcÕzekd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk
ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u
btufjujt œM<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth
Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
Signature of bidder Page
Ahmedabad Municipal Corporation
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu
xuLzh mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh
ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf
fu VhuVth fhJtbtk ytJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn,
<ultk jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh
Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht
vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk
ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au.
J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu
mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR
ftuz y&Jt vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk
bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk
ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
Signature of bidder Page
Ahmedabad Municipal Corporation
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl.
frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve
Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtuu
fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh
>ltu y&o ftb ytve œuJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu
hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt
fumbtk Nçœtuubtk sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ
vºtflt Ftltbtk&e hfbbtk Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu
ylu œhlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF
mw^elt ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk
ftb btxu yuj.ytu.ytR. ytÃg <theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t
<u œhBgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t
mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su
ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.1,00,00,000.00 mw^elt xuLzhle bkswheltu XhtJ
vtzgt ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk rm¾gtuhexe
zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk
Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem
RLJtRxuz xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh
ctfe ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY
Signature of bidder Page
Ahmedabad Municipal Corporation
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb
«btKu yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 &e 3,00,000.00 Mþ^elt ftbtu btxu 1 btm
(2) Yt.3,00,000.00 &e 5,00,000.00 Mþ^elt ftbtu btxu 2 btm
(3) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 3 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb
btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe,
Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu
ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu
xtkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykdult <ublt ftuR œtJt ægtlbtk
juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu
(vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu
yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek. <ublw xuLzh ChJt <&t
<ubtk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu
l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e WCt &<t
ftuR stuFb fu sJtcœthebtk&e Axfe NfNu lnek. mœh ftbbtk ftuR vK ò<lt
ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb
bwsc fhJtbt ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk
mh¾gwjh «btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh
(xuLzh bwsclwk vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk
ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt<
fhJtle &Nu <u bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt
fhth mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt
rfMmtbtk leau œNotJuj ¢btlwmth œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt
ytJNu.fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t
mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
Signature of bidder Page
Ahmedabad Municipal Corporation
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu
rJmkd<<t ykdule ltuk^ bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele
bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle
fturNN l fhJe ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu
mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb
yuf mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR
mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle
vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt
òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ
&tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule
sJtc>the vK vtujem Vrhgtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu
mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu
Mx[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem
Vrhgtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcœth hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu
rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u
søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao
ftuLx[tfxhu CtudJJtltu hnuNu.<&t atjw ftb œhBgtl yuLSlegh Rlatso îtht
ybœtJtœ Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt
sKtJJtbtk ytJu <tu ftuLx[t¾xh îtht <ulw vtjl fhJtlw hnuNu.
Signature of bidder Page
Ahmedabad Municipal Corporation
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^
^x &tg <tu rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl
1btk vh< jR sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb
bwsc ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult
ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e
btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc
sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt
bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm
MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu
«Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc
xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk
Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk
vevzt, œtuhzt Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu
mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo sJtc>the
ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe
y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e
ftgoJtne <&t vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk
œhhtus fhuj ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt
ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu
<u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe
yuLSlehgh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj
<&t btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l
ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd
fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu
Signature of bidder Page
Ahmedabad Municipal Corporation
ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ
WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb
cejbtk&e ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt
mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle
xtEb jebex J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch
rJduhu ftuLx[t¾xhu VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu
jd<tk ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs
buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mh¾gwjh lkk.38, <t.21/11/2022 <&t
mûtb m<tle b¤uj bkkswhe bwsc Syumxe rmJtg dK<hebtkk juJtbt ytJuj <&t «Jo<btl
rlgb bwsc Syumxe awfJJt vtºt &Nu. su ægtlu jR <btb rczomu xuLzhtu ChJtlt hunNu.
(35) mœh xuLzh ykk<od<olt ftb mkkjøl y.Bgw.ftuvtuo.btkk «Jo<btl <btb rlgbtu/mh¾gwjhtu jtdw
vzNu, <ubs JF<tu JF< <h mw^thtytu vK jtdw vzNu. suule ltuk^ jR xuLzhtu ChJtlt
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj
ftbdehelt sÚ&t bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle
bkkswhe bégu&e Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM<
vKu vtjl fhJtlw hunNu.
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h
xuLzh vife yjd yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u
œN søgtyu sYhegt< bwsc ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe,
bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto
vqJuo ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
Signature of bidder Page
Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk
buk/ybu M&¤le bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe
ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu
ylu xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc
<ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu
Signature of bidder Page
Ahmedabad Municipal Corporation
GENERAL DETAILS SPECIFICATION OF MATERIAL
1.1 Water shall not be salty or brackish and shall be clean reasonably
clear and free from objectionable quantities of silt and tract of oil and
injurious alkalis, salts, organic mater and other deleterious materials
which will either weaken the mortar or concrete or cause efflorescence
of attach the steel in R.C.C. Container for transport, storage and
handling of water shall be clean. Water shall conform to the standards
specified in I.S. 456-1978.
1.2 If required by the Engineer-in-charge it shall be tested by
comparison with distilled water. Comparison shall be made by means
of standard cement tests for soundness, time of setting and mortar
strength as specified in I.S. 269-1976. Any indication of unsoundness,
change in time of setting of 30 minutes either more or decrease of
more than 10 percent in strength of mortar prepared with water
sample when compared with the results obtained with mortar
prepared with distilled water shall be sufficient cause for rejection of
water under test.
1.3 Water for curing mortar, concrete or masonry should not be too
acidic and also not too alkaline. It shall be free of elements which
significantly affect the hydration reaction or otherwise interfere with
the hardening of mortar or concrete during curing or those which
produce objectionable stains or other unsightly deposits on concrete or
mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar for
preparing or concrete.
2.1 Cement shall be Ordinary Portland, Ordinary Portland cement as
per I.S. 269-1976 or Portland slag cement as per I.S.455-1976.or
Sulphate Resistant Cement as per IS-12330 latest Revision.
2.2 Testing of Cement : It should be specifically noted that the
cement brought by the contractor at site of work shall be used after
the same is tested at the approved laboratory as per the direction of
the Engineer-in-charge. Such approved laboratory may be located at
Ahmedabad. All the charges for transport and testing of the samples
shall have to be borne by the contractor. The frequency of testing of
such materials shall be in accordance to the relevant Indian standard as
directed by the Engineer-in-charge.
Sand shall be natural sand, clean, well graded, hard strong, durable and
gritty particles free from injurious of dust, clay, kankar nodules, soft or
flaky particles shale, alkali salts, organic matter, loam, mica or other
deleterious substances and shall be got approved from the Engineer-in-
charge. The sand shall not contain more than 8 percent of silt as
Signature of bidder Page
Ahmedabad Municipal Corporation
determined by field test. If necessary the sand shall be washed to
3.2 COARSE SAND :
The fineness modulus of coarse sand shall not be less than 2.5 and shall
not exceed 3.0. The sieve analysis of coarse shall be as under:
I. S. Sieve Percentage by I. S. Sieve
Designation weight passing Designation weight
sieve through sieve.
3.3 FINE SAND :
The fineness modulus shall not exceed 1.0. The sieve analysis of fine
sand shall be as under :
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight
through sieve through sieve.
2.36 mm 100 300 Micron 5 -
M-4 STONE GRIT :
4.1 Grit shall consist of crushed or broken stone and be hard, strong
dense, durable, clean, of proper gradation and free from skin or
coating likely to prevent proper adhesion of mortar. Grit shall for as
possible flaky elongated pieces shall be avoided.
It shall generally comply with the provisions of I. S. 383-1970. Unless
special stone of particular quarried is mentioned. Grit special stone of
particular quarries is mentioned. Grit shall be obtained from the best
black trap or equivalent hard stone as approved by the Engineer - in -
charge. The grit shall have no deleterious reaction with cement.
4.2 The grit shall conform to the following gradation as per sieve
I. S. Sieve Percentage passing I. S. Sieve Percentage
Designation through sieve Designation through sieve
Signature of bidder Page
Ahmedabad Municipal Corporation
4.3 The crushing strength of grit will be such as to allow the concrete in
which it is used to build up the specified strength of concrete.
4.4 The necessary tests for grit shall be carried out as per the
requirements of I. S. 2386 (Parts I to VIII) 1963, as per instruction of the
Engineer-in-charge. The necessity of test will be decided by the
Engineer-in-charge.
M-5A STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
5A.1 Coarse aggregate shall be of machine crushed stone of black trap or
equivalent and be hard, strong, dense, durable, clean and free from
skin and coating likely to prevent proper adhesion of mortar.
5A.2 The aggregate shall generally be cubical in shape. Unless special
stones of particular quarries are mentioned, Aggregates shall be
machine crushed from the best black trap or equivalent hard stone as
approved. Aggregate shall have no deleterious reaction with cement.
The size of the coarse aggregate for plain cement concrete and
ordinary reinforced cement concrete shall generally be as per the table
given below. However in case of reinforcement cement concrete the
maximum limit may be restricted to 6 mm less than the minimum
lateral clear distance between bars of 6 mm. less than the cover
whichever is smaller.
I.S. Sieve Percentage Passing for I.S. Sieve Percentage
Designation single sized aggregates Designation single sized
of nominal size of nominal size
NOTE :- The percentage may be varied by the Engineer-in-charge
when considered necessary for obtaining better density and strength
5A.3 The grading test shall be taken in the beginning and at the charge of
source of materials. The necessary tests indicated in I.S. 383-1970 I. S.
456-1978 shall have to be carried out to ensure the acceptability. The
aggregates shall be stored separately and handled in such a manner as
to prevent the inter mixed on different aggregates. If the aggregates
are covered with dust, they shall be washed with water to make them
M-5B BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
Signature of bidder Page
Ahmedabad Municipal Corporation
5B.1 Aggregate for Design Mix concrete : Coarse aggregate shall be of
machine crushed stone of black trap or equivalent hard stone and be
hard, strong, dense, durable clean and free from skin and coating likely
to prevent proper adhesion of mortar.
5B.2 The aggregates shall generally be cubical in shape. Unless special
stones of particular quarries are mentioned, aggregates shall be
machine crushed from the best, black trap or equivalent hard stones as
approved. Aggregate shall have no deleterious reaction with cement.
5B.3 The necessary tests indicated in I. S. 383-1970 and I.S.456-1978 shall
have to be carried out to ensure the acceptability of the material.
5B.4 If aggregate is covered with dust it shall be washed with water to
6.1 The bricks shall be hard or machine moulded and made from
suitable soils and kiln burnt. They shall be free from cracks and flaws
and nodules of free lime. The shall have smooth rectangular faces with
sharp corners and shall be of uniform colour.
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm to
20 mm deep on one of its flat sides. The bricks shall not break when
thrown on the ground from a height of 600 mm.
6.2 The size of modular bricks shall be 190 mm x 90 mm.
6.3 The size of the conventional bricks shall be as under :
6.4 Only bricks of one standard size shall be used on one work.The
following tolerance shall be permitted in the conventional size adopted
in a particular work.
Length : = 1/8" (3.0 mm) Width : = 1/16" (1.50 mm)
Height : = 1/16" (1.50 mm)
6.5 The crushing strength of the bricks shall not be less than
Kg/Sq.cm. The average water absorption shall not be more than
percent by weight. Necessary tests for crushing strength and water
absorption etc. shall be carried out as per I.S. 3495 (Part-I to IV) -
M-6A FLY-ASH LIME BRICKS :
The fly ash lime bricks shall conform to Grade-1 or Grade-2 of IS-3812-
1981. The frog of the 80 to 100 mm x 40 mm x 10 to 20 mm size.
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 225 mm x 110 mm x 75 mm.
Only bricks of one standard size shall used on one work. The following
tolerances shall permitted in the conventional size adopted in a
particular work:
Length : + 3 mm
Height : + 2 mm
The physical characteristic of bricks shall be as follows.
Signature of bidder Page
Ahmedabad Municipal Corporation
The minimum compressive strength of fly ash lime bricks shall not be less
than 75 Kg/Sq.Cm. and the test shall be conform to IS-3495 (Part-
The average drying shrinkage of the brick when tested by the method
described in IS 4139-1989 being shall not exceed 0.15 percent.
The averages water absorption not more than 20 percentage by mass and
the test shall conform to IS-3495 (Part-3):1992.
M-7 MILD STEEL BARS :
7.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S.
432 ( Part-II ) 1966 and shall be tested quality. It shall comply with
relevant part of I.S.456-1978.
7.2 All the reinforcement shall be clean and free from dirt, paint,
grease, mill scale or loose of thick rust at the time of placing.
7.3 For the purpose of payment the bar shall be measured correct upto
10 mm length and weight payable worked out the rate specified below
1. 6 mm 0.22 Kg./Rmt. 8. 20 mm
2. 8 mm 0.39 Kg./Rmt. 9. 22 mm
M-8 TMT FE-500 STEEL BARS FOR REINFORCEMENT :
8.1 Reinforcement bars shall conform to IS-432, IS-226 or IS-1786 with
its latest amendment and welded wire fabrics to IS : 1566. Only TMT
bars for reinforcement in RCC duct shall be used which shall be clean,
free from pitting, oil, grease, paint, loose mill scale, rust, dirty dust or
any other such substance that will destroy or reduce bond.
It permitted by the Engineer-in-charge reinforcement shall be done in
accordance with IS-2751 or IS-9147 as applicable.
8.2 Other provision and requirements shall conform to specification No.
M-7 for mild steel bars.
M-9 MILD STEEL BINDING WIRE :
9.1 The mild steel wire shall be of 1.63 mm or 1.22 mm (16 or 18 gauge)
diameter and shall conform to I.S. 280-1972.
9.2 The use of black wire will be permitted for binding reinforcement
bars. It shall be free from rust, oil paint grease, loose mill scale or any
other undesirable coating which may prevent adhesion of cement
M-10 STRUCTURE STEEL :
Signature of bidder Page
Ahmedabad Municipal Corporation
10.1 All structural steel conform to I.S.226 - 1965. The steel shall be free
from the defects mentioned in I.S. 226-1975 and shall have a smooth
finish. The material shall be free from loose mill scale, rust pits or other
defects affecting the strength and durability. Rivet bars shall conform
10.2 When the steel is supplied by the contractor test certificate of the
manufacturers shall be obtained according to I.S. 226-1975 and other
relevant Indian Standards.
M-11 SHUTTERING :
11.1 The shuttering shall be either of wooden planking of 30 mm.
minimum thickness with or without steel lining or of steel plates
stiffened by steel angles. The shuttering shall be supported on battens
and beams and props of vertical ballies properly cross braced together
so as to make the centering rigid. In places of bullie props, brick pillar
of adequate section built in mud mortar may be used.
11.2 The form work shall be sufficiently strong and shall have camber, so
that it assumes correct shape after deposition of the concrete and shall
be able to resist forces caused by vibration of live load of men working
over it and other incidental loads associated with it. The shuttering
shall have smooth and even surface and its joints shall not permit
leakage of cement grout.
11.3 If at any stage of work during or after placing concrete in the
structure, the form sags or bulges out beyond the required shape of
the structure, the concrete shall be removed and work redone with
fresh concrete and adequately rigid form work. The complete form
work shall be got inspected by and got approved from the Engineer-in-
charge, before the reinforcement bars are placed in position.
11.4 The props shall consist of bullies having 100 mm minimum diameter
measured at mid length and 80 mm at thin end and shall be placed as
per design requirement. These shall rest squarely on wooden sole
plates 40 mm thick and minimum bearing area of 0.10 Sq.m. laid on
sufficiently hard base.
11.5 Double wedges shall further be provided between the sole plate
and the wooden props so as to facilitate tightening and easing of
shuttering without jerking the concrete.
11.6 The timber used in shuttering shall not be so dry as to absorb water
from concrete and swell or bulge nor so wet to shrink after erection.
The timber shall be properly sawn and planned on the sides and the
surface coming in contract with concrete. Wooden form work with
metal sheet lining or steel plates stiffened by steel angles shall be
11.7 As far as practicable, clamps shall be used to hold the forms
together and use of nails and spikes avoided.
11.8 The surface of timber shuttering that would come in contact with
concrete shall be well wetted and coated with soap solution before the
concreting is done. Alternatively coat of raw linseed oil or oil of
approved manufacture may be applied in place of soap solution. In
case of steel shuttering either soap solution or raw linseed oil shall be
Signature of bidder Page
Ahmedabad Municipal Corporation
applied after thoroughly cleaning the surface. Under no circumstances
black or burnt oil shall be permitted.
11.9 The shuttering for beams and slabs shall have camber of 4 mm per
meter (1 in 250) or as directed by the Engineer-in-charge so as to offset
of subsequent deflection for cantilevers the camber at free end shall
be 1/50 of the projected length or as directed by the Engineer-in-
M-12 HARD DRAWN WIRE :
The Hard drawn steel wire should confirming to IS-432 (Part 2), Hard
drawn steel wire shall be manufacture and its chemical composition
should be as per para 3.0. The finished wire should be free from
defects and finished in a workman like manner. Nominal sizes,
Tolerances, Physical requirements are as per IS : 432 (Part-II) latest
edition. Hard drawn steel wire should be tested as specified in IS :
(Part-II) latest edition.
Note : All the B.I.S. mentioned above shall be with its latest
addition as well as amendment.
Signature of bidder Page
Ahmedabad Municipal Corporation
ITEM TECHNICAL SPECIFICATIONS:
Name of work:- bægÍtul Ntnectd Jtuzobtk bt^wvwht rJM<thbtk ytJuj ngt< Bgwrl. Nt¤tytu/Bgwrl.
rcÕzedtu <ubs y.Bgw.ftu. nM<flt yLgrcÕzedtubtk sYhe hevuhed/heltuJuNl/buLxulLm
fhJtlt ftb ctc<. (yu.yth.me. xuLzh)
Item No : 01 Excavation for pipe line trenches for water supply, sewerage line,
manhole etc. all with shoring and struting if required as per required
gradient and line including safety provisions using site rails and
stacking excavated stuff including up to all required lead cleaning
the site etc. complete for all lifts and strata as specified. In all sorts
of soil and soft murrum.
0 to 1.5 meter depth.
1.5 to 3 meter depth.
3 to 4.50 meter depth.
Any soil which generally yields to the application of ackaxes and
shoves, phawaras rakes or any such ordinary excavating implement or
organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all
obstructions, loose stone, materials and rubbish of all kind, bush, wood and
trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed.
within 50 M. lead. The roots of the trees coming in the sides shall be cut and
coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of
earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the
Engineer-in-charge. The contractor shall assume full responsibility for
alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the
reference marks and bench marks and shall maintain them as long as
required and directed.
The excavation in foundation shall be carried out in true line and
level and shall have the width and depth as shown in the drawings or as
directed. The contractor shall do the necessary shoring and shutting or
providing necessary slopes to a safe angle, at his own-cost. The payment
for such precautionary measures shall be paid separately if not specified.
The bottom of the excavated area shall be 1 evened both longitudinally
and transversely. as directed by removing and watering as required. No
earth filling will be allowed for bringing it to level, if mistake or any other
Signature of bidder Page
Ahmedabad Municipal Corporation
reason excavation is made. deeper or wider that shown on the plan or
directed. The extra depth or width shall be made up with concrete of same
proportion as specified for the foundation concrete at the cost of the
contractor. The excavation up to 1.5 m. depth shall be measured under this
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the
trenches and plinth or leveling the ground in layer including ramming and
The balance of the excavated quantity shall be removed by the
contractor from the site of work to a place as directed with lead upped
M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be
made according to the sections of trenches shown on the drawing or as per
sections given by the Engineer-in-charge. No payment shall be made for
surplus excavation made in excess of above requirements or due to
slopping and sloping back as found necessary on account of conditions of
soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Mode of Measurement shall be on cubic meter basis.
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and
curing complete, excluding the cost of form work and reinforcement for reinforced
concrete work in:
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand
broken stone aggregates 40mm nominal size) and curing complete excluding cost of
formworkin (A) Foundation and Plinth (upto 10 ton)
Item No.4 Providing and laying in position Ready Mixed M-200 grade concrete for reinforced
cement conctere work, using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work intransit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of
concrete, improve work ability without impairing strength and durability as per direction of
theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 400 kg )
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work ability without impairing strength and durability as
Signature of bidder Page
Ahmedabad Municipal Corporation
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 400 kg )
Providing form work of ordinary timber planking so as to give a rough finish including
centering shuttering, strutting and propping etc. height of propping and centering below
supporting floor to celling not exceeding 4 m. and removal of the same for in site reinforced
concrete and plain concrete work in foundations, footing, bases of columns, and mass
concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall
not be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete. Adequate
arrangements shall be made by the contractor to safe guard against any settlement of the form work
during the course of concreting and after concreting. The form work of shuttering, centering, scaffolding
bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form
before the concrete is placed and the form work in contact with concrete shall be cleaned and
thoroughly wetted or treated. The surface shall be then coated with soap solution applied before
concreting is done. Soap solution for the purpose shall be prepared by dissolving yellow soap in water
to get consistency of paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture
may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall be applied after
thoroughly cleaning the surface. Care shall be taken that the coating does not get on construction joint
surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of
following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Signature of bidder Page
Ahmedabad Municipal Corporation
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced
concrete surface. Before the soffits form work and struts are removed, the soffits and the concrete
surface shall be exposed where necessary in order to ascertain that the concrete has sufficiently
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute
safely of the form work and concrete work before, during and after pouring concrete. Watch should be
kept to see that behavior of centering and form work is satisfactory during concreting. Erection should
also be such that it would allow removal of forms in proper sequence without damaging either the
concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the
loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before
concreting. But this will not relieve the contractor of his responsibility for strength, adequacy and safety
of form work and centering. If there is a failure of form work or centering, contractor shall be
responsible for the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be
provided and removed on completion work by contractor at his own expense. The scaffolding, hoisting
arrangements and ladders etc. shall be strong enough to with stand all live, dead and impact loads
expected to act and shall be subject to the approval of the Engineer-in-charge. However, contractor
shall be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and
afford easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost
of materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering
propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to
beams, columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Item No.6:- Providing & Applying Tri mix with De watering Machine and floter machine on
constructed CC work for finishing the surface as per requirement. The rate
including all machinaries, labours, loading , unloading, transportion etc complate
as direction given by engineer incharge.
For detailed specification refer R & B Dept. Booklet for General Technical Specification
for building works (P.31,Item No.9.1)
Signature of bidder Page
Ahmedabad Municipal Corporation
Item No.7:- Making 15 mm Groove on RCC work on road and fill it with poly sulfied selant and
finished it good include all labour charges etc Comp as directed.
Making 15 mm groove in RCC work on road and filling it with polysulfied selant and
finished it good incl.all labour charges etc comp as directed.
The mode of measurement shall be on Rmt of basis.
Item No. 8 :- Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level (upto 10 ton).
The scope of work consists of providing and laying mild steel reinforcement and TMT
CRS Fe-500 reinforcement for RCC works of various components of the structure. This
may be Tisco or any other approved manufacturer branch and corrosion resistant steel
bars approved by the Engineer Incharge. This includes cuttings, bending, binding,
placing, with all equipments and labour required for the work as directed by the City
Engineer, Ahmedabad and all operations covered within the intent and purpose of the
Being of Reinforcement
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings
and conforming to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the City
Engineer, AMC, Ahmedabad using a proper bar bender, operated by hand or power to
attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work;
they shall not be heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
S.No. Operation Size TMT CRS-Fe-500
1 Bend Upto 22 mm dia 3d
Over 22 mm dia 4d
2 Rebend Upto 10mm dia 4d
Over 10 mm dia 5d
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the
drawings, and shall be securely held in position during placing of concrete by annealed
binding wire not less than 1 mm in size and conforming to IS:280 and by using stays
blocks or metal chairs, spacer, metal hangers, supporting wires or other approved
devices at sufficiently close intervals. Bars will not be allowed to sag between supports
nor displaced during concreting or any other operation over the work. All devices used for
positioning shall be of non-corrodible material. Wooden and metal supports will not
extend to the surface of concrete, except where shown on the drawings, placing bars on
Signature of bidder Page
Ahmedabad Municipal Corporation
layers of freshly laid concrete as the work progresses for adjusting bar spacing will not be
allowed. Pieces of broken stone, brick or wooden blocks shall not be used. Layers of bars
shall be separated by spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until
completely embedded in concrete. Special care shall be exercised to prevent any
displacement of reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on
the drawings. All bars protruding from concrete to which other bars are to be spliced and
which are likely to be exposed for an indefinite period shall be protected by a thick coat of
neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with timber
templates having slots accurately cut in for bar position. Such templates shall be removed
after the concreting has progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of
size not less than 1 mm and conforming to IS;280 in such a manner that they do not slip
over each other at the time of fixing and concreting. As far as possible, bars of full length
shall be used. In case this is not possible, overlapping of bars shall be done as directed
by the City Engineer, AMC, Ahmedabad. When practicable, overlapping bars shall not
touch each other, but be kept apart by 25 mm or 1 ¼ times the maximum size of the
coarse aggregates whichever is greater, by concrete between them. Where this is not
feasible, overlapping bars shall be bound with annealed steel wire, not less than [1 mm
thickness twisted tight in eight shape around the lapped bars. The overlaps shall be
staggered for different bars and located at fixed locations only along the span where
neither shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement
bars shall be butt welded so as to transit their full strength. Welded joints shall preferably
be located at points where steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section, not more
than 33 per cent of the rods are welded. No –pre-warning or post heat treatment is
necessary. Interpass temperature should be limited to 200º C with low heat input and
equivalent strength low hydrogen type electrode. Suitable means shall be provided for
holding the bars securely in position during welding. It must be ensured that no voids are
left in welding and when welding is done in 2 or 3 stages, previous surface shall be
cleaned property. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint
and other foreign matter before welding. Only competent welders shall be employed on
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual
site and their number and frequency of tests shall be as directed by the City Engineer,
AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the
Engineer Incharge
Alternate immersion test
Salt spray test
Atmospheric exposure test
Signature of bidder Page
Ahmedabad Municipal Corporation
Sulphur dioxide test
Potentio dynamic test
The rate shall be for a unit of Kg basis.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :5 - fine sand) (B)
Conventional (upto 10 ton)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6.
Brick shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:5 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours
before use or as directed. The cessation of bubbles, when the bricks are wetted with water is an
indication of through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used
except when necessary to complete to bond; closer in such case shall be cut to required size and used
near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall
first be properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side
face shall be flushed with mortar before the next brick is laid and pressed against it. On copletion of
course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical
joint shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the
other. The thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of work for
frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected
brick work shall be kept not more than one meter over the rest of the work. Where this is not possible,
the work shall be raked back according to bond (and not left toothed) at an angle not steeper than
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built
in wall shall be embedded in cement mortar.
Signature of bidder Page
Ahmedabad Municipal Corporation
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed
mm. The face joints shall be raked out as directed by taking tools daily during the progress of work,
when the mortar is still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for
a period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all
loose materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete
footing, the top of concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’
approval for the foundation bed, before foundation masonry is started. When puccas flooring is to be
provided flush with the top to plinth, the inside plinth offset shall be kept lower than the outside plinth
top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to
plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for
embedding in masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional
area does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed
Cms. and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes
etc. for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of
jambs, throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Signature of bidder Page
Ahmedabad Municipal Corporation
Masonary work using Aerated light weight concrete block having crushing strength not less
than 35 kg/sqcm for super structure above plinth level upto floor two level in cement mortar 1:5
( 1 cement : 5 fine sand ) complete as per Technical Specification
The rate shall be for a unit of Sq. Mt.
Half brick masonry in common brunt clay building bricks having crushing strength not less
than 35 Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-
graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc.
complete including the cost of form work but excluding the cost of reinforsement for R.C.C
work in (iv) Slabs having more than 8 cm and upto 10 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Providing and fixing 35 mm thick panelled, glazed or panelled and glazed shutters for Doors
windows and clear story windows including anodised alluminium But hinges with necessary
screws and indian teak wood shutters with.
(A) Plywood sheet panels. (upto 10 ton)
(B) Particle board panels (upto 10 ton)
(C) Hard board panels. (upto 10 ton)
(D) Asbestos sheet panels. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S.
flats at required spacings and frame alround, square or round bars with round headed bolts
and nuts or by screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm
braced with flat iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm
with 38 mm dia steel pulleys complete with bolts, units, locking arrangements, stoppers,
handles, including a priming coat of red lead paint & approved make.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in cement
concrete on floor and lintel. The anchor bolts shall be placed approximately at 45 mm centers
alternatively in the two flanges of the T iron. In the bottom runner (T-iron) shall be embedded in the
floor and proper groove shall be formed along the runner for the purpose. The collapsible gate shall be
fixed at the sites by fixing the end double channels in the T-Iron rail and also by hold fasts bolted to the
end double channel and fixed in the masonry of the side walls or the otherwise.
In case where the collapsible gate is not required to the lintel beams or slop above, a tee iron
suitably designed may be fixed at the top embedded in masonry and provided with necessary clamps
and roller arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing
work without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust,
scales, dust etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured
as the length of double channels and breadth from outside to outside of the end fixed double channels
in open position of the gate. The rate includes providing handles, locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Providing & Fixing in position Alluminium doors with frame using approved quality anodised
extruded alluminium section as approved by Engg.in charge(Jindal alluminium)(a) Frame
sections 101.6x44.45 mm (b) Shutter bottom vertical & top section 83.5x44.45 (wt.1.31 kg/mt.)(at
1.31 kg/mt) (c) Shutter bottom section at 114.3x44.45 mm at (1.37 kg/mt) Shutter middle section
at 100x44.3 wt.(1.37 kg/mt) incl.providing & installing 5 mm thick approved color Acrylic sheet
of standard quality fixed with glazing chips on upper pannel & Laminated sheet on lower pannel
(wtt.0.13 kg/Rmt) etc.comp.as direction of engg.in charge
Metalic Color Anodized Aluminum alloy used in the manufacture of extruded sections for the
fabrication of doors, windows, ventilators shall confirm to designation HE9-WP of IS:733.
Transparent sheet glass shall confirm to the requirements of IS:2835. Wired and figured glass
shall be as per IS:5437. Builder's hardware of fittings & fixtures shall be of the best quality from
approved manufacturers.
All aluminum doors, windows, ventilators and partitions shall be of the type and size as
specified. The doors, windows, ventilators shall confirm to the requirements of IS: 1948. Aluminum
windows, shall confirm to IS: 1949, if so specified. All aluminum units shall be supplied with Metallic
color anodized finish. The minimum anodic film thickness shall be 0.015 mm. Doors, windows and
ventilators shall be of an approved manufacture. Fabrication of the units shall be with the extruded
sections, cut to correct lengths, mitred and welded at the corners to a true right angle conforming to the
requirements of IS: 1948. Tolerance in overall dimensions shall be within ± 1.5mm. The frames and
shutters shall be free from warp or buckle and shall be square and truly plane. Punching of holes, slots
and other provisions to install fittings or fixtures later shall be made at the correct locations, as per the
Signature of bidder Page
Ahmedabad Municipal Corporation
Aluminium swing type doors, aluminum sliding windows, partitions shall be as specified. IS: 1948 and
IS: 1949 shall be referred to incorporates the sizes, shapes, thickness and weight per running meter of
extruded sections for the various components of the units. However, new sizes, shapes, thickness
with modifications to suit snap-fit glazing clips etc. are being continuously being added by various
leading manufacturers of extruded sections, which are available in the market. As such, the sections of
the various components of the unit proposed by the Contractor, will be reviewed by the GSDWICL and
will be accepted only if they are equal to or marginally more than that given in the codes/as specified.
Specific provisions as stipulated for steel doors, windows, and ventilators under related clause shall
also be applicable for this item work. Glazing beads shall be of the snap-fit type suitable for the
thickness of glazing proposed as indicated in the items of works prepared by the Contractor. A layer of
clear transparent lacquer shall be applied on Aluminium sections to protect them from damage during
installation. This lacquer coating shall be removed after the installation is completed.
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing and fixing sheet glass, selected quality (Type-C) bedded in putty and fixed with
wooden beading including the cost of wooden beadings of first class teakwood and
necessary cutting of glass.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and landing laid
on a bed of 12 mm thick cement mortar 1:3 (1- cement:3-coarses and) finishing with flush
pointing in white cement. (upto 10 ton)
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and
plumb. The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm.
thick backing of cement mortar in specified proportion shall be applied on the surface in true like and level
generally as per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after
the flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Signature of bidder Page
Ahmedabad Municipal Corporation
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of
skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe
white glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have
sufficient plasticity for laying and there shall be no hard lumps that would interfere with the evenness of bedding
the base shall be cleared with well wetted. The mortar shall then be spread in thickness not less than 10 mm at
any place and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at 3.3 Kg/Cement
/Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges of the tiles
be smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden mallet till
they are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints. The
joints between the tiles shall be as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming
in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size
tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure
straight and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a depth of
mm. and loose material removed. White cement shall be used for pointing the joints., After fixing the tile finally in
an even the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor
has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be
taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring
shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The
paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any opening
in the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same
The rate shall be for a unit of one sq. metre.
Providing and laying Ceramic tiles 6 mm thick in flooring treads of steps and landing laid on a
bed of 12 mm thick cement mortar 1:3 (1-cement :3-coarses and) finishing with flush pointing in
white cement. (upto 10 ton)
Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Ceramic tiles shall be of approved colour and quality. The tile shall be even, sound regular in
shape and generally uniform in colour. It shall be without any soft veins, cracks of flows.
All angles and edges of the slabs shall be true square and free form chippings and giving plain
surface. The thickness shall be 10 mm to 15 mm. as
specified in the item but not less than 10 mm. at any
Claddding for the ceramic tiles shall be cement mortar 1:3 (1 cement : 3 coarse sand) as given in the
description of the item. Sub grade shall be cleaned, wetted and mopped. Mortar of the specified mix
and 10 mm thickness shall be then be spread. Top surface of the mortar shall then be corrected by
adding fresh mortar at hollows or depressions. The mortar shall then be allowed to harden bit. Over
this surface, cement slurry of honey like consistency shall be applied. The slab shall then be gently
Signature of bidder Page
Ahmedabad Municipal Corporation
place in position and tapped with wooden mallet till it is properly pedded in level with and close to the
adjoining slab. The joint shall be as fine as possible. The tiles fixed in the floor adjoining the wall shall
enter not less then 10 mm. under the plaster skirting or dado. The junction between the wall floor shall
be finished neatly. The finished surface shall be true to levels and slopes as directed.
The cladding shall be kept wet for a minimum period of 7 days. So that joints set properly.
The floor shall then be washed clean with water. The holes required for Nahni traps, pipes any other
fittings shall be made without any extra cost.
Mode of measurements & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along
the finished faces of risers, skirting or dado. Height
shall be measured from finished level of treads or
floor to top. Lining of pillar shall be measured under
The rate shall be for a unit of sq. metre
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid
over and jointed with grey cement slurry mixed with pigment to match the shade of slab
including rubbing and polishing etc. complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Marble stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth
and even surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be
fully in contact with it. Chisel dressing shall also be done on top surface to remove any waviness. The
sides and top surface to granite slabs shall be machine polished and molding etc. complete before
using. All angles and edges of slabs shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The
tolerance shall be 15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or
cement mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in
description of item. Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be
washed clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with
other slabs. It shall then be lifted and laid a side. The top surface of the mortar shall then be corrected
by adding fresh mortar at hollows, or depressions. The mortar shall then be allowed to harden it over
this surface cement slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of
slabs already paved shall be buttered with grey cement. The slab shall then be gently placed in
position and tapped with wooden mallet till it is properly bedded in level with and close to the adjoining
slab. The joints shall be as fine as possible : Surplus cement on the surface of the slabs shall be
removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm. under the plaster
skirting or dado. The junction between the walls and floors shall be finished neatly. The finished
surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth
shall be measured between the finished face of skirting or dado or wall plaster. No deduction shall be
made not extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall
Signature of bidder Page
Ahmedabad Municipal Corporation
be paid for laying stone at different levels in the same room. Treads and steps of stairs paved with
granite stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half
brick walls for interior plastering up to floor two level and finished even and smooth in (i)
Cement mortar 1:3 (1-cement :3-sand)
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground
level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and 12 mm th.
Backing coat in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for spray od sand for
plastering etc comp as directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be
properly examined before erection and use Stage
scaffolding shall be provided for ceiling plaster, which shall
be independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and
other foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is
not hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied
to the form work, the surface shall be roughened by wire brushing and all the resulting dust and loose
particles cleaned off and care shall be taken that none of the retarder is left on the surface. Trimming of
projections on brick/concrete surface where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before
carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes
dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work are
ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling
plaster shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the
finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the
specified thickness, then brought to a true surface by working a wooden straight edge reaching across the
gauges with small upward and sideways movement at a time. Finally, the surface shall be finished off true
with a trowel or wooden float according as a smooth or a sandy granular texture is required. Excessive
trowelling or overworking the float shall be avoided. All corners, arrises, angles and junctions be truly vertical
or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners, arrises
junctions etc. shall be carried out with proper templates to the size required.
Signature of bidder Page
Ahmedabad Municipal Corporation
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is
partially set shall be rejected and removed forthwith from
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally
and vertically. When recommending the plaster, the edges of the old work shall be scraped clean and wetted
with cement putty before plaster is applied to the adjacent area to enable the two to properly joint together.
Plastering work shall be closed at the end of the day on the body of the wall and nearer than 15 cm. To any
corners or arrises. Horizontal joints in plasterwork shall not also occur on parapet tops and copings as these
invariably lead to leakage. No portion of the surface shall be left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided
and only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or
windward side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags on
the outside of the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height shall
be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with minimum
10 mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of
cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and
not exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each
and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster
around ends of joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
When two faces of wall are plastered with different types of plasters or if one faces is plastered and
the other pointed, deductions shall be made from the plaster or pointing on the side of frame for
door, window etc. on which width or reveals is less than that on the other side but no deductions
shall be made on the other side. Where width of reveals on both faces of all are equal, deductions
of 50% of area of opening on each face shall be made from area of plaster and/or pointing as the
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening
shall be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and
sills shall be measured.
The rate shall be for a unit of one sq. metre.
Signature of bidder Page
Ahmedabad Municipal Corporation
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall
surface smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Scraping oil paint from steel and other metal surface and making the surface even (with Hand
Scraping.) Scraping oil paint from steel and other metal surface and making the surface
even (with Hand Scraping.)
The rate shall be for a unit of Smt. The work should be done as specified in above item.
White washing with lime on undecorated wall surfaces (TWO coats) to give an even shade
including thoroughly brooming the surface to remove all dirt, dust mortar drops and other
foreign matter.
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably
tinted where required for use under coloured distemper if required. Glue shall conform to I.S. 852-1969
(Specifications for animal glue).
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-
1973. Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash.
Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for
preparation of white wash. Pigments: mineral colours, not affected by lime shall be sued in preparing
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred with
about five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed to stand
for a period of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. of gum
dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of ultramarine
blut (Upto 3 gms. Per kg. of lime) shall also be added to the last two coats of white wash solution and
the whole solution shall be stirred thoroughly before use.
Preparation of surface :
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters
before white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall
be rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust,
dirt and shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular
patches and plastered again after raking the masonry joints properly. Such portion shall be wetted and
allowed to dry. They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with
materials similar in composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as
possible on part of scaffolding shall rest against the surface to be white or coloured washed. A properly
secured strong and well tied suspended platform (Zoola) may be used for white washing. Where
ladders are sued, pieces of old gunny bags shall be tied at top and bottom to prevent scratches to the
floors and walls. For white washing of ceilings proper stage scaffolding shall be erected where
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the
brush shall be from top downwards, another from bottom upwards over the first stroke and similarly
one stroke from the right another from the left, over the first stroke brush before the it dries. This will
from one coat. Each coat shall be allowed to dry before next coat is applied. Number coats as specified
in item shall be applied. It shall present smooth and uniform finish free from brush marks and it should
not come off easily when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the
surface cleaned.
Signature of bidder Page
Ahmedabad Municipal Corporation
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke
soot removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and
kitchen and patch repairs to plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not
exceeding 0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding
0.5 sq. mt. each in area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in
area deductions and additions shall be made as under :
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq.
mt. each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish
around ends of joints, beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame
for door, windows etc. on which width of reveals is less than that of the other side, where width of
reveals on both faces of wall are equal, deduction of 50% of area of opening on each face shall be
made from total area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if
the width of reveal on the treated side is less than that on the untreated side, but if the width of the
reveal is equal or more than on the untreated side neither deductions nor additions be made for
reveals, jambs, soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs,
soffits, shall be measured.
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be
increased by the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be
girthed and included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in
all the operations described above.
The rate shall be for a unit of one sq. metre.
Signature of bidder Page
Ahmedabad Municipal Corporation
Distempering with dry distemper of approved brand and manufacture (two coats) and of
required shade on wall surfaces of given an even shade, over and including a priming coat of
whiting after thoroughly brooming the surface free from mortar dropping and other foreign
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required
shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all
grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of
required shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of
all grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre. Same For Item NO.33
Painting two coats (excluding priming coat) on external surface of new rain water, soil,
waste and vent pipes and fittings with ready mixed bituminous brushing, black, anti
corrosive to give an even shade including cleaning of all dirt, dustand other foreign
matter.(75 mm dia)
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or
equivalent & two coats of primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered smooth.
The rate shall be for a unit of one sq. metre
Finishing wall with Apex Ultima Acrylic paint of " Asian Paint " on wall surfaces (two coats) to
give required even shade after application of Exterior Primer of Approved Brand &
Manufacturers after thoroughly brushing the surface to remove all dirt & remains of loose
powdered materials.
The rate shall be for a unit of one sq. metre
Dismantling the following including loading, unloading and disposal of unserviceable material for
all lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling
the resulting trenches and pits complete.
Demolishing work shall be carried out as per instructions given by the Engineer in charge.
Demolishing of stone slab pavement or any other type of paving, proportion of cement or lime, sorting out
materials, carting them up to lead of 60 mts. & Stacking the different materials separately as directed by the
Engineer in charge of work. The work shall be done carefully.
The Mode of measurement and rate shall be given as per one square meter basis.
Signature of bidder Page
Ahmedabad Municipal Corporation
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats
architraves, hold fasts and other attachment etc. complete and stacking the material within all
lead and lift.(i) Not exceeding 3 Sq.M. in area.
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats
architraves, hold fasts and other attachment etc. complete and stacking the material within all lead and
lift.(i) Not exceeding 3 Sq.M. in area.
The rate shall be for a unit of Each. The work should be done as specified in above item.
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing
tank etc. including stacking the materials with all lead and lift
Dismantling santtary fittings like wash basin . W.C. pan Indian and Europe an type, flushing
tank etc. including stacking the materials with all lead and lift
The rate shall be for a unit of Each. The work should be done as specified in above item.
Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting with cement and
sand slurry 1:Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting
with cement and sand slurry 1:3 (1-cement 3-sand ) (upto 10 ton)
Cutting out cracks of roof terrace to V-section, cleaning out, wetting, grouting with cement and
sand slurry 1:3 (1-cement 3-sand ) (upto 10 ton)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Cutting out cracks roof terrace to V-Section cleaning out and filling solidly with a hot
mixture of bitumen and clean dry sand (1:1 by weight) (up to 10 ton)
Cutting out cracks roof terrace to V-Section cleaning out and filling solidly with a hot mixture of bitumen
and clean dry sand (1:1 by weight) (up to 10 ton)
The rate shall be for a unit of Rmt. The work should be done as specified in above item.
Providing and fixing 1.20 Metre high fencing with 2.0 Metre long M.S. Angle posts 40 mm x
mm x 6 mm and oil painting 3 coats fixed at 2.5 Mt, C/c. with five Horizontan lines and two
diagonals of galvanised steel barbed wire weighting 9.38 Kg. per 100 Metre, strained and fixed
to posts with G.I, staples including fixing the posts in ground with 0.5 M x 0.5.M x 0.5 M. block
in C.C 1:5:10 etc complete.
Providing and fixing 1.20 Metre high fencing with 2.0 Metre long M.S. Angle posts 40 mm x 40 mm x
mm and oil painting 3 coats fixed at 2.5 Mt, C/c. with five Horizontan lines and two diagonals of
galvanised steel barbed wire weighting 9.38 Kg. per 100 Metre, strained and fixed to posts with G.I,
staples including fixing the posts in ground with 0.5 M x 0.5.M x 0.5 M. block in C.C 1:5:10 etc
The rate shall be for a unit of Rmt
Signature of bidder Page
Ahmedabad Municipal Corporation
Carring out timber treatment to all wood work including drilling holes and spraying oil based
chemical solution on surface of timber work for termite control including labour and material
etc. complete. Using Chlordene 20 EC. As Per 6113_part III Consentration Weight 1.00 percent
is recommended one litre chemical emulsion dillute with 9 liter of kerosene precent
concentration. Total dillute concrentration will be 10 litre inclusive of the litre chemical
emulsion appication 0.75 / Litre chemical per one Sqmt printed two coat wood surface.
Carring out timber treatment to all wood work including drilling holes and spraying oil based chemical
solution on surface of timber work for termite control including labour and material etc. complete. Using
Chlordene 20 EC. As Per 6113_part III Consentration Weight 1.00 percent is recommended one litre
chemical emulsion dillute with 9 liter of kerosene precent concentration. Total dillute concrentration will
be 10 litre inclusive of the litre chemical emulsion appication 0.75 / Litre chemical per one Sqmt printed
two coat wood surface.
The rate shall be for a unit of Smt
Carring out plinth treatment to post construction / existing structure by spraying chemical
solution for termite control treatment including labour and material consist ment with I.S.
specification. Using Chlordene and Chior purfiles 20 EC. As Per 6131_paret-II Consentration
Weight on percentis recommended i.e one litre 20 EC chemical emulsion with 19 liter give 1%
concrentration inclusive of one litre chemical emulsion appication attherate of 5 Litre chemical /
Sqm of surface is recommended as per I.S
Carring out plinth treatment to post construction / existing structure by spraying chemical solution for
termite control treatment including labour and material consist ment with I.S. specification. Using
Chlordene and Chior purfiles 20 EC. As Per 6131_paret-II Consentration Weight on percentis
recommended i.e one litre 20 EC chemical emulsion with 19 liter give 1% concrentration inclusive of
one litre chemical emulsion appication attherate of 5 Litre chemical / Sqm of surface is recommended
The rate shall be for a unit of Smt
Item No. 47 Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following dia.
Including fittings of standard make as approved by Engineer-in-charge.
Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following
dia. Including fittings of standard make as approved by Engineer-in-charge. The pipe is strong
and this is for the small connection work during drainage work. All bend and other solution for
the connection of pipe is include in the cost.
M/s. shall be on Rmt basis.
Applying general insecticide pest control treatment to floors, cup boards etc including labour material
etc. complete. Using Heptachloride 20 EC. As Per 6113_pests Consentration Weight 0.50 percentis
recommended one litre chemical emulsion dillute with 39 liter of water will give. Total dillute
concrentration will be 40 litre inclusive of one litre chemical emulsion appication 0.5 Litre chemical /
Sqm of surface is recommended as per I.S
Applying general insecticide pest control treatment to floors, cup boards etc including labour material
etc. complete. Using Heptachloride 20 EC. As Per 6113_pests Consentration Weight 0.50 percentis
recommended one litre chemical emulsion dillute with 39 liter of water will give. Total dillute
Signature of bidder Page
Ahmedabad Municipal Corporation
concrentration will be 40 litre inclusive of one litre chemical emulsion appication 0.5 Litre chemical /
Sqm of surface is recommended as per I.S
The rate shall be for a unit of Smt
Providing and fixing water closet squatting Pan (Indian type W.C.Pan) size 580 mm (Earth work,
bed concrete, foot rest and trap to be measured and paid for separately) (A) Vitreous China. (I)
Long pattern = White colour
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Each
Providing and fixing wsh down water closet (Europe an type, W.C.Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement Mortar1:1 (1-Cement:1-fine sand) (Seal and
cover to be measured and paid for separately) (A) vitreous China Pattern :(i) in white colour
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing and fixing screw down bib taps of following size. (A) Brass screw down bib tap
polished bright. 15mm & 20 mm
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing and fixing screw down bib taps of following size. © Gun metal screw down bib
tap.15mm & 20 mm
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing and fixing chromium plated brass half trun flush cock of approved quality including
fixing in pipe line etc. complete.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and fixing Kitchen sink with C.I. or M.S. brackets, painted white including cutting
holes in walls and making good the same but excluding fittings. © Vitreous China Sink. (i)
mm x 450 mm x 150 mm size
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of No
Providing erecting and fixing double coated Syntex PVC.(ISI) water tank of required capacity
each with all necessary fittings and connection etc. complete on terrace.
Providing erecting and fixing double coated Syntex PVC.(ISI) water tank of required capacity each with
all necessary fittings and connection etc. complete on terrace.
The rate shall be for a unit of Litre
Providing and Fixing 1 H.P. Electrical monoblock or submarcible water pumps withmotor and
required cable and switch board of approved brand and make etc.comp.as directed.
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Set
Conveyance Charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated
rock, fly ash, aggregates of any kind executed outside the road site. Rate also includes spreading &
levelling etc complete. Internal conveyance above 50 mt done within the work site is not payable.
a) Lead up to 1 Km.
b) Lead From 1Km to 2 Km.
c) Lead From 2 Km to 3 Km.
d) Lead From 3 Km to 4 Km.
e) Lead From 4 Km to 5 Km.
f) Lead From 5 Km to 10 Km.
g) Lead From 10 Km to 15 Km.
The surplus earth, which is left on site after refilling and proper watering of the trenches, shall be
carted away up to a distance within lead upon 5 kmts. All surplus earth should be carted away
immediately after the instruction or orders of the engineer in charge within 24 hours. The surplus
earth shall be spread at the site shown where it is carried. If the work is not carried out by the
contractor as above AMC may carry out the same at the risk and cost of contractor and the same
may be deducted from the dues to the contractor in any form.
The measurement of the surplus earth shall be paid for as per arithmetical calculations.
Nothing extra shall be paid for the bulk age of the excavated earth.
Signature of bidder Page
Ahmedabad Municipal Corporation
Labour work for fixing Interlocking Blocks / any kind of pavement on up to 50 mm th sand bedding,
levelling, watering and fixing in line & level as well cleaning the site etc.comp. as
The reinstatement of W.T. & kerb or water table or C.C. Block or ladi on av. 3 cm. Thick sand
bedding in cement in pointing 1:2 incl. Nece. Watering consolidation etc.comp. Necessary excv’n shall
be made to the depth level & grade as shown to the contractor. foundation shall be watered &
consolidated before the sand conc. Is laid. The W.T. kerb & C.C. Block & ladi shall be leveled with &
filling av. 3 cm.th sand bedding so as bring w.t. kerb in line & level as dire. The sand shall be clean
& coarse The surplus earth shall be laid on top of this conc. Surface with cement mortar 1:2 prop. The
slab shall be laid in such a way that surface shall be line & gradient joint should be 3/8” to ¾”
thickness staggering of the joints shall be req. No. part of the slab/ladi should be projected above the
sanction. For pointing all the joints shall be recede out to be req. depth while the mortar has set
during the laying of
slab/ladi. The jointing shall be finished with the neat cement so that the surface may be smooth &
flush with slab watering shall be done for 7 days. For pointing prop. One cement Two sand to full
depth as and where
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as mentioned in the drawing/instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of flooring work only. It should be laid in such a way that the
no cutting of the paver block to be necessary. if cutting of paver block necessary then it should be cut by
machine only and carting. The finished surface of the paver block shall have resonably good, plain finished.
Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5cms thick sand beddding.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various Retail outlets.
The work includes :Verification of the existing site condition and advising our project in charge to lay suitable
base course if required.
Contractors are required to satisfy themselves with quality of sub grade, sub -base course before the paver
blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.Manufacturing of
paver blocks in your plant as per requirements in technical specification enclosed.Supplying of paver blocks at
site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification, within shortest possible time the site
is public place hence care should be taken to ensure that the routine activities shall not be disturbed. The job of
laying may required to be carried out during night also.
Signature of bidder Page
Ahmedabad Municipal Corporation
Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test results as per
requirements in Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests
to be borne by party.The contractor shall guarantee that all material and components designed, fabricated,
supplied and laid by him shall be free from any type of defect due to faulty material and/or
workmanship/erection for a period of One year from the date of completion of work. However, the contractor
One years shall render free mintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by
application of hydraulic compaction and also by high intensity vibration to the moulds. The machine should
have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be
mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped
with automatic control panel for maintaining water cement ratio from batch to batch to obtain concrete of
uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer
and conveyor belt for transportation of concrete from mixer to concrete block making machine to maintain
quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
1.4 Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1). Systematic record of test results of various paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by weight
Signature of bidder Page
Ahmedabad Municipal Corporation
of cement. The colour shade shall be “RED” as selected by AMC before commencement of the work. White
cement shall be used for colored pavers to obtain the desired colour shade. The job also includes providing
mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the
date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver S urface.
The concrete mix design should be followed for each batch of materials separately and automatic batching
plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications for
coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm Shape Unirregular (Uniform Shape with no Hollow Or Cracks) Uni, I shape, tri hex or directed
Chamfer 4mm to 6mm along top edges Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured pavers”
(+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
Signature of bidder Page
Ahmedabad Municipal Corporation
(Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 35 N/Sqmm for 60mm
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks..
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be Min. 35 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles) – Appendix C.
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles) – Appendix D.
Water Absorption
Signature of bidder Page
Ahmedabad Municipal Corporation
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I
(Specifications for Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than
blocks, shall be divided into ten approximately equal groups. Three blocks shall be drawn
from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the
designated section of part thereof, and the consignment represented by the sample, are
clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until
they have been tested. The testing shall be carried as soon as possible, after the sample
has been taken. As soon as practicable after sampling. The samples shall be stored in
water at 20 degree C ± 5 degree C for 24 hours prior to testing.
The mode of measurement shall be on Smt. basis.
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken
pieces of glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to
bring mortar creme out upto surface using white cement including rounding off junctions and
extending them up to15 cm along the wall, clearing with water and oxalic acid etc.asdirected.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved
patterns, with precies leveling and setting curvatures with necessary tools and templates, using
white/coloured broken ceramic tile chips, set in pigmented cement mortar 1:4, as directed, finishing in
line, level and to required slope, flushing with appropriate pigimented cement grout, curing and
finishing with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level
with a backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and
scrub the same vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark
out total design on the designated area. Estimate the quantity of Chips of different colous and ensure
its uninterrupted supply before starting the work. Lay the chips flat on the bedding coat and fix tightly
be light hammering. Remove grey cement from the joints by scrapping before final set of cement.
Signature of bidder Page
Ahmedabad Municipal Corporation
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall
be finished with first class workmanship. The surface should finally cleaned, given a mild acid wash for
gain the luster of China Chips.
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist
artisan, preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two
places of decimal.
Item NO. 65:- The Item as Described in Table.
The Material should be of zindal make and all the aluminium Sections must be anodized. The Design
and Pattern will be as per Instructions of Add.City Engieer. The Unit shall be Measured in Smt.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for Footpath in M-20 grade using
mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well equipped with vibratory system for kerb stones of approved
design including curing, etc. complete, including the cost of formwork etc. complete. The rate shall also
include necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints of
the kerbstones. Filling of zari alone the sides of the kerb stone fixed with Bituminous concrete mixed in
proper position as directed by Engineer in change to form a portable mixture. In any case Gravel or such type
of materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding.
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality
20 mm. nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include excavation and erecting and fixing the kerbs in position
with necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints
including kerb stones of approval design (Sample must be got approved). In any case Gravel or such type of
materials shall not be allowed for production .a) Laying on 5 Cms thick Sand Bedding Kerb Stone Fixing
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality
mm. nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include excavation and erecting and fixing the kerbs in position
with necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints
including kerb stones of approval design (Sample must be got approved). In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 Cms thick Sand Bedding
Water shall conform to M-1. Cement to M-2. Sand to M-5. Grit to M-7. Graded stone aggregate 20 mm.
nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the Precast blocks. These machineries should be compatible to
Signature of bidder Page
Ahmedabad Municipal Corporation
produce blocks of required strength and dimensions. The machine shall contain hydraulic Press or advanced
equipment to generate required compaction & Grade and finish. Moulds/ Steel Plates/ Dies of the machine
shall be dimensionally checked & to be got approved before commencing the production. Contractor shall
prepare proper Drying Yard for keeping the blocks before curing. The drying yard shall be levelled and covered
so that no shrinkage cracks are formed. Contractor shall prepare adequate size curing pond to cure the blocks
for not less than 21 Days. No other means of curing shall be allowed. The technical specification of concrete
shall confirm to IS 456-2000. The concrete mix is not required to be designed and only nominal mix as per IS :
456-2000 shall be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement : 1.5 coarse sand :
graded stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete
surface or as specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per I.S.
corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by volume
respectively. The ingredients required for ordinary concrete containing one bag of cement of 50 Kg. by weight
(0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. The proportion of the aggregate for
the kerb stone shall be modified as per the approval of the engineer-in-charge. The water cement ratios shall
not be more than those specified as per IS. The cement of the mix shall be increased, if the quantity of water
in a mix has to be increased to overcome the difficulties of placement and compaction so that the water
cement ratio specified in the table is not exceeded. The maximum size of coarse aggregate shall be as large as
possible within the limits specified but in no case greater than 1/4th of the minimum thickness of the
member, provided that the concrete can be placed without difficulty so as to surround all reinforcement
thoroughly and to fill the corners of the form. For reinforced concrete work, coarse aggregates having a
nominal size of 20 mm. are generally considered satisfactory. Admixture shall be used in concrete only with
approval of the Engineer-in-charge based upon the evidence that with the passage of time, neither the
compressive strength of concrete is reduced nor are other requisite qualities of concrete impaired by the use
of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
Kg. weight. The volume of one such bag being taken as 0.0342 m3. Boxes of suitable sizes shall be used for
measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and 38 cm. deep. While
measuring the aggregate and sand, the box shall be filled without shaking ramming or hammering. The
proportioning of sand shall be on the basis of its dry volume and in case of damp sand, allowances for bulk age
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. Measured quantity of
aggregate, sand and cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry-mixing, measured quantity of water required
for each batch of concrete mix shall be added gradually and mixing continued for another one and a half
minute. Mixing shall be continued till materials are uniformly distributed and uniform colour of the entire
mass is obtained and each individual particle of the coarse aggregate shows complete coating of mortar
containing its proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes
after all ingredients have been put into the mixer. Mixers which have been out of use for more than
minutes shall be thoroughly cleaned before putting in a new batch. Unless otherwise agreed to by the
Engineer-in-charge, the first batch of concrete from the mixture shall contain only 2/3rds of normal quantity
of coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of cement to
Signature of bidder Page
Ahmedabad Municipal Corporation
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of 10 mm.
to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow or ice immediately before
placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the Precast blocks. All the edges of the Precast blocks
shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly.
Moulds shall be regularly checked for correctness of dimensions of Blocks, twists, bends due to handling, etc..
before starting every days work.
Care shall be taken to set all formwork/Mould in perfect line, level (or in required camber or slope as
specified) and plumb. Formwork/Mould propping shall be strong, rigid and sturdy. The formwork/Mould shall
be as per pattern & design shown in drawings. Formwork/Mould shall be done accurately and precisely so as
to achieve neat, clean and smooth concrete surface, in line, level and plumb. Clinks, twists, offsets, warps,
riveting etc. in plates or forms shall not be allowed. Before placing concrete, forms shall be thoroughly cleaned
off of all rust, dust and loose materials. Colorless oil or grease of approved quality shall be applied before
placing steel. Also the formwork material will be of wood/plywood/steel or any sort of such material, as
approved by the Engineer in charge, so that all exposed concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge)of cement
Removal of Moulds: Specific time shall be identified for removal of moulds, such that the concrete of the
Precast blocks shall gain strength to withstand the stresses generated due to self weight and handling to
drying yards without any deformation to shape/ dimensions/ edges.
Drying Period: Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site:
Water should be drained of from the block before it is actually sent to the site. Time should be
provided for proper draining of water which may be present in the block kept for curing in the pond.
Signature of bidder Page
Ahmedabad Municipal Corporation
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to
breaking of block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 0.15 M in width and required depth shall first be excavated, true to line and level.
The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled with a
layer of 0.05 M. thick sand bedding. The curbs then shall be placed in position of which 50mm. shall be below
road. Care should be taken to maintain proper line and level. The joints between the kerbs shall be pointed
with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested
i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample,
for testing at 7 days and the remaining 5 at 28 days. The samples of concrete shall be taken on each day of the
concreting as per above frequency. The number of specimens may be suitably increased as deemed necessary
by the Engineer-in-charge when procedure of tests given above reveals a poor quality of concrete and in other
special cases. The average strength of the group of cubes cast for each day shall not be less than the specified
cube strength of 200 Kg/cm2. at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete
made in accordance with the proportions given for a particular grade, does not yield the specified strength,
such concrete shall be classified as belonging to the appropriate lower grade. Concrete made in accordance
with the proportions given for a particular grade shall not, however, be placed in a higher grade on the ground
that the test strength are higher than the minimum specified. If rock pockets/honeycombs in the opinion of
Engineer-in-charge are of such an extent or character so as to effect the strength of the structure, materially
or to endanger the life of the steel reinforcement, he may declare the concrete defective and require the
removal and replacement of the portion of the structure affected.
Precast Kerb Stones :
The relevant specifications of concreting as per item above shall be followed except that work shall be
carried out for precast concrete kerb stones as specified in the item. All Precast members shall be cast at
workshop. Sufficient curing shall be done before placement of the same The method of transporting and
placing the precast members shall be as approved by the Engineer-in-charge. Members shall be so
transported that no breakage or undue stresses are induced in them. If required, all members shall have a key
provided on both the faces i.e. top and bottom surfaces, of adequate size so as to fill the same with concrete
while laying. The function of this key is to avoid the leakage through the joint between the precast member
and the member on which it is laid.
Signature of bidder Page
Ahmedabad Municipal Corporation
Mode of Measurements and Payment :
The rate shall include cost of formwork but exclude the cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
Mode of measurements and payment: The rate shall be for a unit of Rmt.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve the desired density as per Codal
Wet Mix Macadam :- This item is for Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing the Material with water at OMC in
mechanical mix plant or at any convinent place and carriage of mixed Material by tipper / tractor or
by any other means to site, laying in uniform layers with paver / grader / tractor pavadi in sub- base
/ base course on well prepared surface and compacting with vibratory / static roller to achieve the
desired density as directed by engineer in charge of work.
(A) Supply of WMM
(B) Laying of WMM
Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the activity of
excavation, ramming, Laying on sand bedding as per requirement to fix the Nibhada Stone in Line &
Level with cement pointing in cement mortar 1:2 etc complete as directed.
1.Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the stone
shall be of ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A), 2.0 page no.-
Mode of measurment shall be on smt basis
Signature of bidder Page
Ahmedabad Municipal Corporation
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
As per Instrcution of Engg. Incharge
Item No : 71 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM
1:3, finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter.
The sewet trench shall be excavated to the alignment and gradient shown on the plan
and section. In all storts soil including oil masonary asphalt roads and wet. excavation
. The sewer excavation shall be commenced at the down stream end of the sewer and
be continued upto the gradient as directed. The trench shall not open more than
meters in advace of the completed sewer only when directed by the Engineer in
charge looking to the progress of the work in obtaining the formation of the bottom
of the trenches the usual methods of suing sight rails and bonning roads shall be
adopted during the whole of the process. The center line of uniform height shall be
carried clearly on each rail. The depth of the excavation and invert of the sewer shall
be checked by means of bonning road of appropriate length and also straight edge.
The bed of the trench be shall well remmed before starting laying of sewer ines and
cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable
imbering of shorting work looking to the nature of soil near big or important
structures, the sides of the trenches shall be closely and securely timbered. If any
settlement of the building is anticipated the timbering shall be left in the ground. The
various materials excavated shall be separately stacked so that in refilling the may be
relaid on the same order as before and least possible damage shall be done carpet on
the public roads and private properties. Surface covering consisting of asphalt carpet
shall be kept on one side and preserved for reinstatement. The excavated earth shall
not heaped near the trenchers so as to caused unnecessary obstruction along the
pulling inspection, trenches etc. shall be tunneled under only as necessary. The side of
the trenches shall be nearly vertical and plumb & red light shall be placed at each end
at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not
placed nearer than 3 meters from the outer edge of the excavated trench. The utmost
shall have to be taken in refilling the trenches so that no damage may be done no
sewer no lump shall be allowed to be put around the sewer. The remming of the
filling shall be done and well watered. The surplus earth shall be removed directed
within 30 meters lead. The measurement of the work shall be exact length and width
of the trench as specified or as per City Engineer instruction and depth shall be
measured vertical as per section upto invert or the pipe lind The City Engineer
Signature of bidder Page
Ahmedabad Municipal Corporation
reserves the right of extra excavation on either side if considers necessary for the
safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all
directions before any concrete in India. In case the excavation is done deeper than
required no filling shall be allowed to bring the formation to proper level but
contractor shall have to lay cement or lime be concrete of filling or other acceptable
materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per
instruction of C.E. necessary arrangements for watering trenches must be provided be
contractor and without proper watering trenches will not be allowed to be tilled to
further. Contractor shall have to make arrangement for acees to invert of the sewer
and for inspection of the ware as ordered by the Engineer. If is required to shired or
after the alignment section of diameter of the pip the contractor shall carry or altered
the alignment section or diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor
shall not claim any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the
recess time except in and other holiday the case of bad grounds such as running sand
where the work must be executed various day night without intruption when so
ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which
do not in the opinion of Engineer required to be charged in location shall be
supported and protected from injury by the contractor. The contractor shall be liable
to pay all damages to water pipe, drains electric and telephone cables and to private
property during the execution of this contract and the same will be recovered from
the running bills or thedeposit of work whenever it becomes necessary in the opinion
of the Engineer in charge location of any existing sewers drains etc. not otherwise
from in these specification the contractor shall do the work of making such change
and the work shall be paid for as extra work. All places of public utility etc. shall be
kept accessible for use.
No extra payment shall be made for land sides and side slopes done without prior
approval of the Engineer in charge.
Wherever natural soil commends winder excavation the mentioned above the same
shall be given after approved C.E. The rate for excavation for easy jointing and
caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test
practicable of the lines are checked and approved of and order given by the Engineer
in charge. The refilling shall be accompanied by through watering the layers of
metrs. Further refilling shall be done there after and process should be repeated till
trenches are completely refilled. Temping and ramming with rammers shall have to
be done at all place of important work where ordered by Engineer in charge. After the
trench is give the trenches shall have to be refilled within 4 days with complete
watering. If the contractor fails to do watering satisfactory corporation shall get it
done at the risk and cost of the contractor with or without giving any notice and the
expenses incurred in doing so recovered from the contactor either in cost or from his
payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal
size. These shall be free from earth and shall be got app. use. Sand shall be clear coarse,
Signature of bidder Page
Ahmedabad Municipal Corporation
sharp and free from earth and other impurities. Mixing shall be done on brick or stone
platform or of brickbats to mortar shall be measured in heaps by brick height irregular
measure. If ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the
contractor for before commencing the brick work. over boxes, concrete shall be well
watered. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-
13, water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement,
part of sand and 10 parts of coarse agg. by volume. and the work shall be carried out as
per inst. of Engineer in charge and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD
Hand book NO. 2. These shall be well burnt and free from all defects and shall be got
approved by the Engineer in charge before the work is started. Cement to be used for
mortar shall comply with PWD Hand book specifications, cement mortar in the brick
work shall be 1 part of cement, 5 parts of sand. Every brick well sacked in water is
required to be laid I full & closed joints of cement mortar the thickness of which shall
not exceed 1.25 cms. If on removal of centering any open joint shall be found, these
shall be pointed immediately. Special care shall taken to make the face of brick work
smooth brick work shall be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per
1974-75 latest plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed according
to the plan working proper dimention & as directed by the Office in charge from time
to time. Brick should be thoroughly wetted in water before use. All brick work to be
cleaned & wetted before laying cement mortar shall be prepared in special iron pals.
And mixed bag of 1.25 cft. or 1 cft. as measured as the case may be. All materials shall
be stacked in one side so as not to obstruct traffic in any way. The masonry should be
constructed in proper workmanship like manner with jointing plumb etc. to confirm
with the general specification No. 45 PWD Hand Book. The face work should be nearly
finished. The shall be kept watered for a week at least three days after the date of
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be
carried out in accordance with latest version of IS 456 unless otherwise specified in this
Signature of bidder Page
Ahmedabad Municipal Corporation
specification. The slab of manhole shall be cast with shutters lined with plywood and
smooth finished. For avoiding surface cracks due to variation in atmospheric
temperature and exposure to direct sunlight, RCC slab of manholes after casting shall
be kept wet. M 15 grade of concrete used for construction of RCC manholes shall have
minimum cement content of 360 kg/cum of concrete. Bar bending schedule for
reinforcement shall be prepared by contractor and got approved from owner/ engineer
before proceeding with the work. Minimum cover to the reinforcement shall be
The rate includes cost of all labour, materials, tools and plant etc. required for
satisfactory completion of this item as described above.& the drawing as per A.M.C Dr.
S.O.R shall be final. The rate shall be for a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to
attain proper radius of bends. Bars shall not be bent or straightened in a manner that
will injure the material. Bars bent during transport or handling shall be straightened
before being used on the work. They shall not be heated to facilitate bending. Unless
otherwise specified, a ‘U’ type hook at the end of each bar shall invariably be provided
to main reinforcement. The radius of the bend shall not be less than twice the diameter
of the round bar and the length of straight part of the bar beyond the end of the curve
shall be at least four times the diameter of the round bar. In case of bars which are not
round and in case of deformed bars, the diameter shall be taken as the diameter of
circle having an equivalent effective area. The hooks shall be suitably encased to
prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires
or other approved devices at sufficiently close intervals,. Bars shall not be allowed to
sag between supports nor displaced during concreting or any other operations of the
work. All devices used for positioning shall be of noncorrodible material. Wooden and
metal supports shall no extend to the surface of concrete, except where shown on
drawings. Placing of broken stone or brick and wooden blocks shall not be allowed.
Signature of bidder Page
Ahmedabad Municipal Corporation
Pieces of broken stone or brick and wooden blocks shall not be used. Layers of bars
shall be separated by spacer bars, precast mortar blocks or other approved devices.
reinforcement after being placed in position shall be maintained in a clean condition
until completely embedded in concrete. Special care shall be exercised to prevent any
displacement of reinforcement in concrete already placed. To prevent reinforcement
from corrosion, concrete cover shall be provided as indicated on drawings. All the bars
producing from concrete and to which other bars are to be spliced and which are likely
to be exposed for a period exceeding 10 days shall be protected by a thick coast of neat
Bars crossing each other where required shall be secured by binding wires (annealed)
of size not less than 1 mm in such manner that they do not slip over each other at the
time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible,
overlapping of bars shall be done directed. When practicable, overlapping bars shall
not touch each other, but be kept apart by 25 mm or 1.25 mm times the maximum size
of the coarse aggregate whichever is greater by concrete between them. Where not
feasible, overlapping bars shall be bound with annealed wires not less than 1 mm thick
twisted tight. The overlaps shall be staggered for different bears and located at points
along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall
be joined by coup lings which shall have a cross-section sufficient to transpit the full
stresses of bars. The ends of the bars that are joined by coupling shall be upset for
sufficient length so that the effective cross section at the base of threads is not less
than norma l cross-section of the bar. Threads shall be standard threads. Steel for
coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be
butt-welded so as to transmit their full stresses. Welded joints shall preferably be
located at points when steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. Only electric are welding using a process
which excludes air from the molten metal and conforms to any or all other special
provisions for the work shall be accepted. Suitable means shall be provided for holding
bars securely in position during welding. It shall be ensured that no voids are left in
welding and when welding is done in two or three stages, previous surface shall be
cleaned properly. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint
and other foreign matter before welding. Only competent welders shall be employed
on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded
pieces of reinforcement shall be tested. Specimen shall be taken from the actual site
and their number and frequency of test shall be as directed.
R.C.C. Bedding :
Cement concrete for the bottom portion of manhole shall consist of one part of cement
two parts of sand four parts of black trap metal of other approved material of 0.6 to
cms size from well graded as per instruction. The rate includes all necessary materials
Signature of bidder Page
Ahmedabad Municipal Corporation
mixing lifting placing ramming watering etc. the exposed faces to be neatly finished
smooth with cement as per instructions. The concrete work to kept constantly watered
for at least fortnight.
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement &
parts of sand in uniform thickness with surfaces trely in plums. The work in general
shall comply with general specifications for plaster No. 64 in PWD hand book. The
plaster surfaces to be kept damp at least for a fortnight. All internal sides of the
manholes including soffit of the arch shall be provided with cement plaster.
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 : 2 :
4 prop. alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing
the direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions. The
rate includes mixing the same in position as directed PVC foot steps of approved design
and quality shall have to be fixed if so ordered by C.E. without extra charges. PVC steps
shall be fixed at interval of 37 cm. vertically & 22 cm. horizontally starting from the
invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Item no. 72 Provdg. & laying S.W. Gully trap with brick masonry chamber & water tight
G.T.Stone including fixing of covervSquare mouth trap 100 mm x100 mm size P-Trap
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND
INSTRUCTIONS GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Nos.
Item no. 73 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling,
transporting pipes to work site, unloading lowering in trnch such as cementsand, hemp bitumen
as directed, incl. watering the trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints in
C.M.1:1 proportion in proper position , grade and alignment at all level as directed by Engineer-
in- charge including conveyance from stone to site of work, Jointing material etc.comp.
A)…………do…….(b)10 cm dia line
B)………do……….(c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
Signature of bidder Page
Ahmedabad Municipal Corporation
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make
and shall be brought on site after approval. (The pipes shall be laid in grade as per
instruction.)Contractor shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped
in hot asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing
pipes and jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be
done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation. The sewer
excavation shall be commenced at the down stream end of the sewer and be continued up to the
gradient as directed. The trench shall not open more than 60 mts. in advance of the completed sewer
only when directed by the engineer in charge looking to the progress of the work in obtaining the
formation of the bottom of the trenches the usual methods of using sign rails and boning roads shall be
adopted during the whole of the process. The centre line of uniform height shall be carried clearly on
each rail. The depth of the excavation and invert of the sewer shall be checked by means of boning
road of approved length and also by straight edge. The bed of the trench shall be well rammed before
starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of
shorting work looking to the nature of the soil near big or important structure, the sides of the
trenches shall be closely and securely timbered, if any settlement of the buildings in anticipated the
timbering shall be left in the ground. The various materials excavated shall be separately stacked so
that in refilling that may be relayed on the same order as before and least possible damage shall be
done carpet on the public roads and private properties. Surface covering consisting of asphalt carpet
shall be kept on side and preserved for reinstatement. The excavated earth shall not be heaped near
the trenches so as to caused unnecessary obstruction along the trenches during inspection trenches
etc. shall be tunneled under only as necessary. The side of the trenches shall be nearly vertical and
plumb and red light shall be placed at each end at intervals and instructions and further protected by
rope fence. Necessary caution boards shall also be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed
nearer than three meters from the outer edge of the excavated trenches. The utmost shall have to be
taken in refilling the trenches so that no damage may be done no sewer, no lump shall be allowed to be
put around the sewer. The ramming of the filling shall be done and well watered.
The surplus earth shall be removed directed within 30 meters lead. The measurements of the
work shall be exact length and width of the trenches as specified or as per City Engineer instruction
and depth shall be measured vertical as per section up to invert or the pipeline. The City Engineer
reserves the right of extra excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before
any concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to
bring the formation to proper level but contractor shall have to lay cement or lime concrete of filing or
other acceptable materials as directed by the City Engineer at contractor own cost so as to come to
proper formation. In case bad formations are met with the work shall have to be done as per instruction
of City Engineer. Necessary arrangements for watering trenches must be provided by contractor and
without proper watering trenches will not be allowed to be filed to further Contractor shall have to
Signature of bidder Page
Ahmedabad Municipal Corporation
make arrangement for access to invert of the sewer and for inspection of the work as ordered by the
engineer. If it is required to shift or after the alignment section of diameter of the pipe the contractor
shall carry out the altered work at the rates quoted by him for the original work for items and
contractor shall not claim any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess
time except in and other holiday the case of bad grounds such as running sand where the work must be
executed vigorous day night without interruption when so ordered by the engineer. All existing water
pipe storm drains sewer line railway track, electric cables etc. which do not in the opinion of engineer
required to be changed in location shall be supported and protected from injury by the contractor. The
contractor shall be liable to pay all damages to water-pipe, drains electric and telephone cable and to
private property during the execution of this contract and the same will be recovered from the running
bills or the deposit of work change location of any existing sewers drains etc. not otherwise from in
these specification the contractor shall do the work of making such change and the work shall be paid
for as extra work. All places utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the
engineer in charge.
The excavation of trenches shall be done foot wider on each side of the pipe than the inside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider
excavated on either side for the upper depth above 3 meters shall be allowed and paid for. Wherever
natural soil demands winder excavation the mentioned above the same shall be given after approval of
City Engineer. The rate for excavation for easy jointing and caulking nothing extra shall be paid for
this. Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the
lines are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering for layers of 0.50 mtrs. Further refilling shall be done thereafter and
process should be repeated till trenches are completely refilled. Temping and ramming with rammers
shall have to be done at all place of important work where ordered by Engineer in charge. After order
to refill the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contractor either in cost or from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications
of items which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor
Current Approved Rates for Civil and Electrical Works, as per Available on Site of
Ahmedabadcity.gov.in All the Specifications should be Considered as per Schedules Rates of R & B
Division of both civil and Electrical Works. Hence it an ARC Tender All the Quantity Would Vary as
per Instruction of Engineer in Charge. No Rate would be given Extra for Increase or Decrease in the
Quantity of The BOQ Scheduled Items.
Demolition including stacking of serviceable materilas and disposal of unserviceable materials
with all lead and lift. (i) R.C.C. work
Signature of bidder Page
Ahmedabad Municipal Corporation
The rate shall be for a unit of one Cum. The work should be done as specified in above item.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and
disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Item no.78 Fabricating, supply and erecting in position Standard Structural steel sections
conforming to IS 2062 for railing , skywalk, stair, or other works using ISMB, ISA,
ISMC, MS plate, flat, square bars, pipe, square pipe, rectangular sections, square
section, tube, etc. including welding, cutting, wastage, etc. complete. The rate is
inclusive of welding rod, supply & fixing of correct size nut, bolts, washers,
including one primer coat of red lead paint conforming IS:102 Zinc chromate paint
conforming to IS:104 followed by two coat of aluminium paint as per IS:2339 OR
enamel paint of color as selected by engineer incharge, with all contractor's
materials, labour, tools & plants, in bolted/welded construction as directed by
Engineer-in Charge. The waste cut pieces shall not be included in the paying
quantity. The work shall be done as per drawing and specification. The work shall
be carried out as per IS:800, IS:816
Item shall be executed AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS
GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of smt
Seal and Signature of the Bidder AdditionalCity Engineer
Date: Ahmedabad Municipal Corporation
Signature of bidder Page
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
bægÍtul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE
ytExbltu CtJ J^thtu ytvJtbtk ytJNu lrn. yuf s ftuLx[tfxhu yuf søgtyu <btb ftbdehe
vtKe, z[ulus, vuJ´d, heEMxuxbuLx rJ. <btb ftbdehe fhJtle Au. yBþf JF<u btºt vtKelt
Ôgrf<d< flufNltu s c>jJtlt «mkdtu WCt &Nu ylu yBþf JF< btºt bulntuj/ auBchlu Vh<u
fta ltkFuÕþk ÃjtMxh fhJtLþk &tg <uÔþk vK clNu. yBþf søgtyu swlt vÚ&h s VheJth heEMxux
fhJtlt &Nu fu btºt ytMVtÕx htuz d{tWxed - heEMxux fhJtltu &Nu. <uJe >huf ytExbbtk J^^x &tg
fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle
hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf
mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu
s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t
l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt Yt. 250.00le
J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
Seal and Signature of the Bidder AdditionalCity Engineer
Date: Ahmedabad Municipal Corporation
Signature of bidder Page
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
E TENDER NOTICE NO. – /2026-27
Special Tender Clause For CCRS SLA
Ahmedabad Municipal Corporation has to make a special clause as per for SLA
Name of work :-
<t.22.01.2026 lt htus bu.Bgwrlrmvjfrb§hmtnucle Jefje bexekdbtk &guj aatobtk bwÆt lk.21 bwsc
su <u me.me.yth.yum.le Vhegtœlu y.Bgw.ftu.îtht cltJuj Ôntuxmyuv d{wvbtk bwfgt ctœ «tuçjubJtRÍ yum.yuj.yu.lt mbgdt¤t ctœ fhuj ftbdehe btxu,awftJJtlt &<t
ltKtkbtk&e y.Bgw.ftu.lt rl<e-rlgb bwsc vulÕxe leau bwsc fhJtbtk ytJNu.
(A) Penlty For Maintenance and SLA Purpose
CCRS within SLA time (Category & Problem wise) CCRS After SLA time (Category
& Problem wise Penlty)
Department Category Problem SLA Penalty Penalty Penalty
(Hours) (Hours) (Hours)
Engineering Water>>Engineering Water-low presure 240 240 480
Engineering Water>>Engineering Water-No Supply 240 240 480
Engineering Water>>Engineering Water-Other 72 72 144
Engineering Water>>Engineering Water-Leakage In Main 48 48 96
Engineering Water>>Engineering Water-Pollution In Supply 24 24 48
Engineering Drainage>>Engineering Drainage-Manhole Cover 24 24 48
Engineering Drainage>>Engineering Drainage-Other 48 48 96
Engineering Drainage>>Engineering Drainage-Choking Of Line 48 48 96
Engineering Drainage>>Engineering Drainage-Public Toilets and 72 72 144
Urinals-Drainage Line Hours
Blockage or Choking
Engineering Road Road-Other 48 48 96
Signature of bidder Page
Ahmedabad Municipal Corporation
Engineering Road Road-Bhuva On Road 48 48 96
Engineering Road Road-Repair Require 72 72 144
Engineering Storm Water Road-Water logged Due To 24 24 48
Engineering Storm Water Road-Catch Pit Repairing 96 96 192
Engineering Public Building Public Building-Public 360 360 720
Toilets and Urinals- Hours
Doors,Windows,Tiles or
Engineering Footpath Road-Footpath Repairing 168 168 336
Engineering Building>>Engineering Building-Municipal Schools 168 168 336
Repairing Hours
Wvhtuf< vulÕxele mbgbgtoœt ctœ vK ftbdehe fhJtbtk l ytJu <tu vwhuvwhe ftbdehele hfb suxje
vulÕxe jtdw vzNu.
(A) Penalty 10% for New Allocated Works.
(B) The Work Order under this Annual Rate Contract (ARC) Tender shall be
issued only against the approved and sanctioned estimate for the
respective work.
The time limit for execution of each work shall be specified in the
respective Work Order issued under this tender.
Any penalty for delay or non-compliance shall be calculated and imposed
based on the approved sanctioned estimate amount of the respective work
and shall be governed by the relevant terms, conditions, specifications,
and penalty clauses of this tender.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of bidder Page
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPLE CORPORATION
Engineering Department -Central Zone
Name of Work:- bægÍtul Ntnectd Jtuzobtk bt^wvwht rJM<thbtk ytJuj ngt< Bgwrl. Nt¤tytu/Bgwrl. rcÕzedtu <ubs y.Bgw.ftu. nM<flt
yLgrcÕzedtubtk sYhe hevuhed/heltuJuNl/buLxulLm fhJtlt ftb ctc<. (yu.yth.me. xuLzh)
Sr. Quantity Rate In Per Amount
No. Item Description Rs. in Rs.
1 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated
upto 50 Meter lead.(A) Loose or soft soil.
Item Code No. - 04B001A. (SOR 2023-24
AHMEDABAD CITY)
A 638 0 to 1.5 meter depth. 201.81 Cmt
Providing and laying controlled cement
M.200 and curing complete excluding the cost
of formwork and reinforcement for reinforced
concrete work in Item Code No. - 05024AA,
Sr. 5.8.2 No. (SOR 2023-24 AHMEDABAD
1 (A) Foundations, footings, Base of columns 3874.20 Cmt
and Mass concrete.
1 Slabs,landing,shelves,Balconies Lintels, 4187.70 Cmt
Beams, Girders and Cantilever upto floor
Providing and laying cement concrete
1:5:10 (1-Cement: 5- coarses sand
and:10-hand broken stone aggregates
40mm nominal size) and curing
complete excluding cost of formworkin (A)
Foundation and Plinth (upto 10 ton).
Item Code No. - 05006A, Sr. No.5.3.4
(SOR 2023-24 AHMEDABAD CITY)
Signature of bidder Page
Ahmedabad Municipal Corporation
Providingand laying inposition Ready Mixed
200 grade concrete for reinforced cement
conctere work , using cement content as per
approved Design Mix manufactured in fully
automatic batchingplant and transported to
site of work in transit mixer for a lead up to
kms having continuous agitatedmixer,
manufactured as per mix design of specified
grade for reinforcedcement concrete work
including pumpingof R.M.C. from transit mixer
to site of laying,excludingthecostof centering
shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/
retard setting of concrete,
improveworkabilitywithout impairing strength
and durabilityasperdirectionof theEngineer- in-
charge.Without FlyAsh (Min cement level as
per latest IS 456 shall be maintained) Item
Code No. - 5055. (SOR 2023-24
AHMEDABAD CITY)
a) 5 M-200 (A) Foundations, footings, base of 4793.10 Cmt
columns, and mass concrete.
5 1 Providing formwork of ordinary timber planking 171.68 Smt
so as to give a rough finish including centering
shuttering strutting and propping etc. Height of
propping and centering below up porting floor
to ceiling not exceeding 4M. and removal of
the same for in situ reinforced concrete and
plain concrete work in.(A)Foundations
Footings Bases of Columns etc. and Mass
concrete. (up to 10 ton) Item Code No. -
AHMEDABAD CITY)
Providing & Applying Tri mix with De watering
Machine and floter machine on constructed
CC work for finishing the surface as per
requirement. The rate including all
machinaries, labours, loading , unloading,
transportion etc complate as direction given by
engineer incharge
Making 15 mm Groove on RCC work on road
and fill it with poly sulfied selant and finished it
good include all labour charges etc Comp as
8 100 ProvidingTMTBarFE415reinforcement 66.59 Kg
work including bending, binding and placing
position complete upto floor two level Item
Code No. - 05014BA, Sr. 5.4.11 No. (SOR
2023-24 AHMEDABAD CITY)
Signature of bidder Page
Ahmedabad Municipal Corporation
Brickworkusingcommonburntclaybuildingbricks
having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in
Mortar 1:6 (1- Cement : 6-fine sand)(B)
Conventional. Item Code No. - 06002BA,
Sr. 6.13 (SOR 2023-24 AHMEDABAD CITY)
17 40.00 Extra Rate for brickwork in Above Item 272.25 Cmt
for super structure above plinth level upto
floor two level (B) Conventional
10 1 Masonary work using Aerated light weight 4483.73 Cu.M.
concrete block having crushing strength not
less than 35 kg/sqcm for super structure
above plinth level upto floor two level in
cement mortar 1:5 ( 1 cement : 5 fine sand )
complete as per Technical Specification Item
Code No. - 6014, (SOR 2023-24
AHMEDABAD CITY)
11 20 Half brick masonry in common brunt clay 407.00 Smt
building bricks having crushing strength not
than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1
Cement:4-coarsesand) in foundationandplinth
(B) Conventional. Item Code No. -
AHMEDABAD CITY)
a) 5 (1)Floors etc. Upto 200 mm in thickness. 593.90 Smt
19 20.00 Extra for half brick masonry in super 52.80 Smt
structure above plinth level upto floor
two level (B) conventional
Providing and laying cement concrete flooring
1:2:4 (1-cement : 2-coarse sand : 4-graded
stone aggregate 20mm nominal size) laid in
one layer and finished with a floating coat of
neat cement. (B) 50mm thick. Item Code No. -
AHMEDABAD CITY)
Providing and fixing 35 mm thick shutters for
Doors, windows and clerestory windows
including Indian teak wood frames 12 cm x
cm. size including black enamelled iron
oxidized fixtures and fastenings including
primer coat of approved quality and two coats
of oil painting etc, complete. (ii) Fully Panelled.
Item Code No. - 10032B, (SOR 2023-24
AHMEDABAD CITY)
b) 20 (2) fully panelled 5478.89 Smt
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and fixing M. S. Grills of required
pattern to wooden frames of windows frames
of windows etc. with M. S. Flats at required
spacing and frame alround, square or round
bars with round headed bolts and nuts or by
screws : (A) Plain Grill. Iteam Code :
AHMEDABAD CITY)
Rapairing of exi. wooden door & window incl
nece carpentary work and nece.fixtures and
fastenings reqd. also including labour charges
for erection and fixing door shutter after
necessary repair as per site condition.(N.S.)
Providing and fixing in position collapsible
steel shutters with vertical channels 20 x 10 x
2 mm braced with flat iron diagonals 20 x
mm size with top and bottom rails of T_rin 40x
40 x 6 mm with 38mm dia, steel pulleys
complete with bolts, nuts, locking
arrangements, stoppers handles including
applying a priming coat of red lead paint.
(Based on Building SOR 2023-24, Iteam Code
: 11003A, I. No. As Per NBO. No.11.6)
Providing & fixing Steel door with Shutter for
steel sheet 18 Gauge, and angel and 40 x
x 3mm and steel doors frame of size 40 x 40 x
5 mm incl. anodised Iron butt hinges and
nece.fitting and fastening with necessary
screws.Rate also incl. two coats of oil paint etc
Providing and fixing sheet glass, selected
quality (Type-C) bedded in putty and fixed with
wooden beading including the cost of wooden
beadings of first class teakwood and
necessary cutting of glass. Iteam Code :
AHMEDABAD CITY)
a) 100 (2) 6 mm thick 1176.10 Smt
Providing and laying white glazed tiles
6mm thick in flooring treads of steps and
landing laid on a bed of 12mm thick
cement mortar 1:3 (1-cement : 3-coarse
sand ) finishing with flush pointing in white
cement. (Based on Building SOR 2023-24,
Iteam Code : 14008AA I. No. As Per NBO.
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and laying white glazed tiles
6mm thick in skrting risers of steps and dedo
on 10mm thick cement plaster 1:3 (1-cement
: 3-coarse sand) and jointed with white
cement slurry (Based on Building SOR 2023-
24, Iteam Code : 14009AA I. No. As Per
Providing and laying polished Kota stone
slab flooring over 20mm (Average) thick base
of cement mortar 1:6 (1 cement : 6-coarse
sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse
sand) laid over and jointed with grey
cement slurry mixed with pigment to match
the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick
Providing 15mm thick cement plaster in
single coat on Rough (Similar)side of
single or half brick walls for interior
plastering upto floor two level and finished
even and smooth in (ii) Cement mortar 1:4
(1-cement :4- sand) (Based on Building
SOR 2023-24, Iteam Code : 17002B I. No.
As Per NBO. No.17.6 + Iteam Code :
17004A I. No. As Per NBO. No.17.69 )
20mm thick sand faced cement plaster on
walls upto height 10 metres above
ground level consisting of 12mm thick
backing coat of C.M. 1:3 (1-cement : 3-sand)
and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1- sand) etc. complete. (Based on
Building SOR 2023-24, Iteam Code :
I. No. As Per NBO. No.17.95 )
Provdg.and applying fibre reinforced
cementious micro concrete work in ceilings
and beam inc. mixtures of CEMSCREED
HM(F) fairmatt company ,FBR bonding agent
material with water in suitable proportion anti
corrosive treatment on exposed beam ,ceiling
steel bars ith safe core R incl.all kind of labour
etc.comp. incl.three coat of white wash
(approved rate)
Removing dry or oil bound distemper by a
washing and scrapin gand sand papering the
wall surface smooth including necessary
repairs to scratches compl.
26 50.00 Scraping oil paint from steel and other 48.83 Smt
metal surface and making the surface
even (with Hand Scraping.)
Signature of bidder Page
Ahmedabad Municipal Corporation
Colour washing with lime on wall surface
(two coats ) over and including a primary
coat of white washing to give an even
shade after through brooming the surface to
remove all dirt, dust, mortar drops and other
foreigh matter.
Distempeing (Two coats) with oil bound
distemper of approved brand and
manufacture and of required shade on wall
surfaces to give an even shade, over
and including a priming coat with
distemper primer of approved brand
and manufacture after thoroughly
brushing the surface free from mortar
dropping and other foreign matter and
also including preparing the surface even
and sand papered smooth.
a) 400 Extra Coat for Above Item over above 30.09 Smt
for every subsequent coat of
approved brand and manufacture.
29 10 Painting two coats (excluding priming 86.94 Smt
coat) on new steel and other metal surface
with enamel paint, brushing, interior to give
an even shade including cleaning the surface
an even shade including cleaning the
surface of all dirt, dust and other foreign
Painting one coats (excluding priming
coat) on previously painted steel and other
metal surface with enamel paint, brushing to
give an even shade including cleaning the
surface of all dirt, dust and other foreign
a) 150 Extra over item for every sub sequent coat of 50.40 Smt
Applying two coats of Birla (white cement
based) or Asian (acryliclapy-putty) or
equivalent & two coats of primer of
approved brand and manufacture on new
wall surface to give an even shade including
thoroughly brushing the surface free from
mortar dropping and other foreign matter and
sand papered smooth.
Finishing wall with Apex Ultima Acrylic paint of
" Asian Paint " on wall surfaces (two coats) to
give required even shade after application of
Exterior Primer of Approved Brand &
Manufacturers after thoroughly brushing the
surface to remove all dirt & remains of loose
powdered materials.
Signature of bidder Page
Ahmedabad Municipal Corporation
Wall painting (two coats) with plastic emulsion
paint of approved brand and manufacture on
undecorated wall surface to give an even
shade including throughly brushing the
surface free from mortar droppings and other
and sand papered smooth
34 1 Extra over item for painting with plastic 5.36 Smt
emulsion paint of approved brand on ceilings
and sloping roofs.
Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materil as
and disposal of unserviceable materials with
all lead and lift.. (Based on Building SOR
2023-24, Iteam Code : 20005 I. No. As Per
NBO. No.20.23 )
Dismentling doors, windows, ventilators etc.
(wood or steel) shutters including
chowkhats architraves, holdfasts and
other attachment etc. complete and
stacking them within all lead and lift (Based on
Building SOR 2023-24)
30 (I) Not exceeding 3 Sq.M. in area (Iteam 123.90 Each
Code : 20013A I.No. As Per NBO. No.20.49 )
1 (II) Exceeding 3 Sq.Min area (Iteam Code : 165.90 Each
20013B I.No. As Per NBO. No.20.49 )
Dismantling santary, fitting, lime washbasin,
W.C. pan indian and eqropian type flushing
tank etc.. Stacking the materials with all lead
and lift. (Based on Building SOR 2023-24,
Iteam Code : 20016 )
Demolition of 20/15 mm thick Plaster including
stacking of serviceable materials and disposal
of unserviceable materials with all leads and
Cutting out cracks of roof terrace to V-
section, cleaning out, wetting, grouting with
cement and sand slurry 1:3 (1-cement 3-
sand ) (upto 10 ton)
Cutting out cracks roof terrace to V-Section
cleaning out and filling solidly with a
hot mixture of bitumen and clean dry
sand (1:1 by weight) (up to 10 ton)
41 1 P/Making locking arranment over UG tank 550.00 No.
cover with providing Godrej lock
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and fixing 1.20 Metre high fencing
with 2.0 Metre long M.S. Angle posts 40mm x
40 mm x6 mm and oil painting 3 coats fixed at
2.5 Mt,C/c. with five Horizontan lines and two
diagonals of galvanised steel barbed wire
weighting 9.38 Kg. per 100 Metre, strained
and fixed to posts with G.I,staples including
fixing the postsin ground with 0.5 M x 0.5.M x
0.5 M. block in C.C1:5:10 etc complete.
Constructing a sink (chowkedi) with C.C.
1:2:4, 12cm. thick over B.B. masonry in
C.M,(1:6) in front and dwarf wall 1.0 Mt.high
and 23 cm.thick cement plaster to masonry
/ in C.M.1:3) and cement concrete flooring
in 1:2:4: mi x 5 cm. dia. drain pipe
etc.complete. (Based on Building SOR 2023-
24, Iteam Code : 22003)
Carrying out timber treatment to all wood work
including drilling holes and spraying oil based
chemical solution on surface of timber work for
termite control including labor and material
etc. complete. Using Chlorpyriphos20 EC as
per 6313 2013 Part III (1% concentration by
mass) is recommended one litre chemical
emulsion diluted with 19 liters of kerosene.
Total diluted concentration will be 20 liters
inclusive of 1 liter chemical emulsion
application in drilled
holes and 0.75 / Litre chemical per one Sqmt
two coat on wood surface not protected by
paint or varnish.
Carring out plinth treatment to post
construction / existing structure by spraying
chemical solution for termite control
treatment including labour and material
consist ment with I.S. specification.
Using Chlordene and Chior purfiles 20 EC.
As Per 6131_paret-II Consentration
Weight on percentis recommended i.e one
litre 20 EC chemical emulsion with
liter give 1% concrentration inclusive of one
litre chemical emulsion appication
attherate of 5 Litre chemical / Sqm of
surface is recommended as per I.S
Signature of bidder Page
Ahmedabad Municipal Corporation
Carrying out timber treatment to all
wood work including drilling holes and
spraying oil based chemical solution on
surface of timber work for termite control
including labor and material etc.
complete. Using Chlorpyriphos20 EC as
per 6313 2013 Part III (1%
concentration by mass) is recommended
one litre chemical emulsion diluted with
liters of kerosene. Total diluted concentration
will be 20 liters inclusive of 1 liter chemical
emulsion application in drilled holes and
0.75 / Litre chemical per one Sqmt two
coat on wood surface not protected by paint
or varnish. (Based on Building SOR 2023-24,
Iteam Code : 22005)
Providing, laying and jointing in true line and
level U.P.V.C pipe (SCH - 40) of following
dia. including fittings of standard make as
approved by Engineer - in - charge. Pipe shall
be fixed on the wall with the help of clamp
at every shall be concealed as directed
including necessary Tee ,bend, any joint &
any fittings etc. including testing of pipe and
joints and fixing the same with adhesive
solvent, including cost of all materials
(Building SOR 23-24 )
a) 10 15 mm (I.code no. 23061) 84.87 Mtr
b) 5 25 mm (I.code no. 23062) 107.29 Mtr
c) 5 50 mm (I.code no. 23065) 228.61 Mtr
Providing and fixing to wall ceiling and floor
10.0Kg.F/Cm2 working pressure polythene
pipes of the following out side Dia.
Low densidy, complete with special
falnge compression type fittings, wall
clips etc. including making good the wall
ceiling and floor.
Providing and fixing water closet squatting
Pan (Indian type W.C. Pan) size 580mm
(Earthwork, bed concrete, foot reste and trap
to be measured and paid for separately) (A)
Vitreous China.(I) Long pattern = White colour
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and fixing wsh down water closet
(European type, W.C. Pan) with integral P or S
trap including jointing the trap with soil pipe in
Cement Mortar 1:1 (1-Cement : 1-fine sand)
(Seal and cover to be measured and paid for
separately)(A) vitreous China Pattern :(i) in
a) 30 (A) Vitreous China : 1290.80 Each
51 Providing and fixing screw down bib taps of
following size. (B) Brass chromium plated
screws down Bib Tap.
a) 30 (i) 15mm dia. 184.98 Each
b) 5 (ii) 20mm dia. 212.68 Each
52 Providing and fixing Gun metal check or
non-return fullway wheel valve.
a) 1 (i) 15mm dia. 184.89 Each
b) 1 (ii) 20mm dia. 201.80 Each
c) 1 (III) 25 MM DIA 416.47 Each
d) 1 (E) 40mm dia 656.86 Each
53 1 Providing and fixing pillar tap, capstan head, 261.86 Each
screw down high pressure with screws,
shanks and back nuts. (i) 15mm dia.
54 Providing and fixing chromium plated
brass half trun flush cock of approved quality
including fixing in pipe line etc. complete.
55 1 SS Sink Glosy ASIS 304 Grade x 1mm thick 1525.42 No.
with over all size 610x460 mm & bowl size
Providing erectiong & fixing double coated
suntex or equivalent PVC. (ISI) water tank of
required capacity each with all necessary
fittings and connection etc. complete on
Providing and Fixing 1 H.P. Electrical
monoblock or submarcible water pumps
withmotor and required cable and switch
board of approved brand and make
etc.comp.as directed.
Conveyance Charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any
kind executed outside the road site. Rate also
includes spreading & levelling etc complete.
Internal conveyance above 50 mt done within
the work site is not payable. Sr. No.1229, Item
Code No.E027, (SOR 2023-24 AHMEDABAD
Signature of bidder Page
Ahmedabad Municipal Corporation
59 Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including
watering, ramming etc comp. as directed
a) 100 Laying on Sand bedding as per requirement to 68.64 Smt
fix the C.C.Block / Nibhada Stone in Line &
Providing & Fixing in position Fully Panelled /
Partly Panelled Partly Glazed / Fully
Glazed Alluminium doors with frame using
approved quality anodised extruded
alluminium section as approved by Engg. In
charge.(Jindal alluminium )(a) Frame
sections 101.6x44.45 mm b) Shutter
vertical & top section 83.5x44.45 (wt.
1.31 kg/mt.)( at 1.31 kg/mt) © Shutter
bottom section at 114.3 x44.45mm at (
kg/mt ) Shutter middle section at 100x44.3
wt. (1.37 kg/mt ) incl. providing & installing
5 mm thick Glass of standaed quality
fixed / 12 mm thick Laminated sheet with
glazing chips (wt. 0.13 kg/ Rmt) in panels
etc. comp. as per Detail Given &
direction of engg.in charge.
Providing and Fixing of Mild Steel Galvanized
Sheet of 0.8mm thickness as Per Required
Width and Height. The Rate also includes
Necessary Fabrication for Supporting of MS
Sheet as Directed by Engineer in Charge. The
Rate Also Includes Necessary Tools,
Manpower, Transporation and Material, As an
when Required at Site. The Rate also Includes
Necessary Carting of The material from Store
To Site. The work should be Completed with
Required Height and Width as Per Instruction
given by Engineer In Charge. The Rates
Above are Excluding of G.S.T. The Above
Work is Done in Priority Basis at Madhpura
Swimming Pool work
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and Laying of Rubber Moulded
Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver
Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas
as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks
using rubber mould, Rate providing and laying
paver blocks as per required grading and
specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by
skill mason of flooring work only. It should be
laid in such a way that the no cutting of the
paver block to be necessary. if cutting of paver
block necessary then it should be cut by
machine only and carting. The finished
surface of the paver block shall have
resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if
necessary. Gravel or such type of materials
shall not be allowed for production. Laying
on 5 cms thick sand
Providing and laying broken china mosaic
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto
surface using white cement including
rounding off junctions and extending them
up to15 cm along the wall, clearing with
water and oxalic acid etc.asdirected.
(Based on Building SOR 2023-24, Iteam Code
64 1 Flushing cistern P.V.C. with fittings 12.5 Litre 677.97 Each
high level (Based on Building SOR 2023-24 Sr
No.198, Item Code No.M216)
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing & Fixing in position
Alluminium doors with frame using approved
quality anodised extruded alluminium
section as approved by Engg.in
charge(Jindal alluminium)(a) Frame
sections 101.6x44.45 mm (b) Shutter
bottom vertical & top section
Shutter bottom section at 114.3x44.45 mm at
(1.37 kg/mt) Shutter middle section at
100x44.3 wt.(1.37 kg/mt) incl.providing &
installing 5 mm thick approved color
Acrylic sheet of standard quality fixed
with glazing chips on upper pannel &
Laminated sheet on lower pannel (wtt.0.13
kg/Rmt) etc.comp.as direction of engg.in
Supplying and fixing of 300 mm-L x 150 mm-B
x 380 mm-H Kerb block for Footpath in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with
well equipped with vibratory system for
kerb stones of approved design
including curing, etc. complete, including
the cost of formwork etc. complete. The
rate shall also include necessary cutting
of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate
shall also include the flush pointing in CM
(1:3) for all joints of the kerbstones. Filling of
zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in
proper position as directed by Engineer in
change to form a portable mixture. In any
case Gravel or such type of materials
shall not be allowed for production. a)
Laying on 5 cm thick Sand Bedding
67 30 Painting Two Coats on divider and 71.86 Smt
footpath curb surface / New Concrete
Surface ( Painting two coats after filling the
surface with synthetic enamel paint in all
shades on new plastered concrete
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve the
desired density as per MoRTH clause
a 25 (A) Supply of WMM 1708.13 Cmt
b 25 (B) Laying of WMM 31.25 Cmt
Supplying and fixing Nimbhada ladi 25 to
mm thick for walk-way, covering the activity of
excavation, ramming, Laying on sand bedding
as per requirement to fix the Nibhada Stone in
Line & Level with cement pointing in cement
mortar 1:2 etc complete as directed.
Repairing damaged M.H. and rasing M.H.
up to road level incl. removing damaged
brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing MH sheet cover,
removing the debris from MH and carting
the same as directed.
a) 30 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
b) 0 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No.
c) 20 (C) up to 0.65 mt. (@ Seven Coarse) 1,786.49 No.
Constructing Chamber of following size
including excavation, reffiling, BBCC (1:5:10)
for foundation, c.c. channel (1:2:4), finished
15mm thick cement plaster in side in cm 1:3,
finishing with cement slurry, Brick masonary in
cm 1:5 & excluding the cost of chamber sheet
cover etc. completed (AMC SOR)
a 30 0.60 X 0.45 mt. size inside clear, Depth from 2229.00 No.
b 50 0.60 X 0.75 mt. size inside clear, Depth from 2833.00 No.
c 10 0.75 X 0.75 mt. size inside clear, Depth from 3849.00 No.
Provdg. & laying S.W. Gully trap with brick
masonry chamber & water tight G.T.Stone
including fixing of covervSquare mouth trap
100 mm x100 mm size P-Trap
Signature of bidder Page
Ahmedabad Municipal Corporation
Providing and supplying,and jointing ISI mark
only standard length stoneware pipes of
following class and diameter including
excavation for laying of pipes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores,
stacking etc. compl. (IS651/1989 or its latest
revision) including labour work for
lowering, laying, joiting with cement
mortar (1:1) proportion, proper postion,
grade and alignment and all level as
directed by engineer in charge including
store to site of work jointing material etc
complete (Based on Building SOR 2023-24,
Iteam Code : 24006AA. Sr. No.24.19 )
30 100 mm dia 211.05 Rmt
50 150 mm dia 288.23 Rmt
120 230 mm dia 299.00 Rmt
74 10.00 Demolition including stacking of 698.25 Cu.M.
serviceable materilas and disposal of
unserviceable materials with all lead and lift.
(i) R.C.C. work
Demolition of Brick work and stone masonry
including stacking of serviceable materil as
and disposalof unserviceable materials with
all lead and lift.(ii) In Cement Mortar.
Extra rate for using Ready Mix Concrete
of any grade for below ground level to
vertical upto any floor with delivery & suction
Pipe & Pump etc. The rate includes fule,
pump operator, skilled labor, driver etc
completed and as per direction of engineer in
Dismentling barbed wire in fencing including
making rolls and also including dismentling
fencing posts including all earth work concrete
in base and making good the
disturbed ground stacking useful materials
as directed and disposing as
directed and disposing of the
unserviceable materials with all lead and lift.
Signature of bidder Page
Ahmedabad Municipal Corporation
Fabricating, supply and erecting in
position Standard Structural steel sections
conforming to IS 2062 for railing , skywalk,
stair, or other works using ISMB, ISA,
ISMC, MS plate, flat, square bars, pipe,
square pipe, rectangular sections, square
section, tube, etc. including welding,
cutting, wastage, etc. complete. The rate is
inclusive of welding rod, supply & fixing of
correct size nut, bolts, washers, including
one primer coat of red lead paint
conforming IS:102 Zinc chromate paint
conforming to IS:104 followed by two coat
of aluminium paint as per IS:2339 OR
enamel paint of color as selected by
engineer incharge, with all contractor's
materials, labour, tools & plants, in
bolted/welded construction as directed
by Engineer-in Charge. The waste cut pieces
shall not be included in the paying quantity.
The work shall be done as per drawing and
specification. The work shall be carried out as
per IS:800, IS:816
Seal and Signature of the Bidder AdditionalCity Engineer
Date: Ahmedabad Municipal Corporation
Signature of bidder Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.163.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .