| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.1 LAccepted-AOC NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | L-1 | Accepted-AOC Work awarded | |
| 2 | L-2₹30.0 L+₹85,928.52 (2.95%)Rejected-Finance WARD NO 04 SUNHARI KICHHA U S NAGAR | CHAMOLI | UTTARAKHAND | 246401 | L-2 | Rejected-Finance Due to higher Rate | |
| 3 | L-3₹30.7 L+₹1.5 L (5.30%)Rejected-Finance NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | L-3 | Rejected-Finance Due to higher Rate |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
9 Sept 2024, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
I.C./Installation of 11/0.4 KV Sub-stations at various places in Badhaipura Area under EDSD, Rudrapur-I
2024_UPCL3_74913_1
EDC(USN)12/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Pl. refer tender documents
4 documents required · 4 mandatory
₹2,360
EE ETD Rudrapur
₹75,000
18 Jan 2025
23 Aug 2024
10 Sept 2024
23 Aug 2024
9 Sept 2024
24 Aug 2024
Amount
Annexure-A (LABOUR CHARGES)
Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual.
Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing.
Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual.
Muffing of poles size 0.45x0.60 cm radius with 1:3:6 (1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc.
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (63 KVA)
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (100 KVA)
Excavation of earth for DTR Plinth of size 2.1x2.1x1.2 meter.
Brick work in 1:4 ratio on DTR Plinth.
RCC Work of DTR Plinth 1:2:4 ratio 15 cm thickness.
Cement Plaster on side walls of DTR Plinth in 1:4 ratio.
Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter) with the height of 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material)
Installation/mounting of new 100 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
Installation / mounting of new 63 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
Installation / mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning.
Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Raccoon as phase wire (3 phase 4 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specification
Laying, Sagging & binding of AB cable of size 120 sqmm. (Only for cable, additional provisions to be made for matching accessories installation,case of any network modification i.e additionalpole etc. and for actual connection, disonnection as per site condition.
Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21- 50 Km).
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km).
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 21-50 Km).
Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km).
Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km).
Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 21-50 Km).
Headload cartage of PCC Pole from road to site (distance 1-3 Km).
Disconnection and Reconnection of Consumer Connection.
Laying Sagging of LT XLPE AB CABLE 3X120+ 1X95+1X16 Sq.mm.
Service of Hydra Machine for Lines and Transformer related work because of busy traffic in Town area for safety purpose.
Installation of LT Distribution Box 3 Phase for LT AB Cable.
Annexure-B (SUPPLY ITEMS)
Supply of MS Nut & Bolt Off size
Supply of LT Clamp for PCC Pole with N&B
Supply of Strip Holding Clamp
Supply of Suspension Clamp with Eye Hook (As per drawing attached)
Supply of MS Clamp with N&B for Distribution Box.
Supply of Dead End Clamp with Eye Hook.
Supply of Shackle Insulator.
Supply of insulated Piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 95 Sqmm to 95 Sqmm TYCO/RPG/3M Make.
Supply of insulated Piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120 Sqmm to 120 Sqmm TYCO/RPG/3M Make.
Supply of insulated Piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120 Sqmm to 35 Sqmm TYCO/RPG/3M Make.
Supply of Stay Clamp for SP-55 With Nut & Bolt.
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer (Sintex/RMC make or other ISO reputed company) with Panel Lock with key) (As per drawing attached).
Supply of Al. Crimping Type Lugs 400 Sq.MM.
Supply of Al. Lug 120 Sq.mm.
MANRAJ ELECTRICAL & INFRASTRUCTURE
G R ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .