Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,936
Closing Date
17 Jul 2026, 6:00 pm
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
CONSTRUCTION OF TOILET FOR MOHALLA QADEEM NEAR JAMIA QADEEM PANCHAYAT BONIYAR BLOCK BONIYAR UNDER CDF YEAR 2026-27
2026_RDPR_313788_2
e- NIT No 66/Xen/Rew/Bla/2026-27 Dated 27-06-2026
Open Tender
Civil Works
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,936
29 Jun 2026
29 Jun 2026
18 Jul 2026
29 Jun 2026
17 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 m in width) and for shafts, wells , cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 2.65 | cum | 479.3 | ₹1,270.15 |
| - | P/l of dry stone soling hand packed tightly i/c carriage and h/l | 0.71 | cum | 1,000 | ₹710 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.81 | cum | 5,202.9 | ₹4,214.35 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 4.47 | cum | 5,673.4 | ₹25,360.1 |
| - | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 4.29 | cum | 7,877.4 | ₹33,794.05 |
| - | Extra for B/w above Plinth Level upto Floor V Level | 4.29 | cum | 1,455.65 | ₹6,244.74 |
| - | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for suspended floors | 6.33 | Sqm | 718.2 | ₹4,546.21 |
| - | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for foundation, footings , bases of column. | 9.89 | Sqm | 286.35 | ₹2,832 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.9 | cum | 9,821.85 | ₹8,839.67 |
| - | Reinforcment for R.C.C. work incl. straightening, cutting, bending, placing in position & binding all complete. | 0.58 | qntl | 11,535 | ₹6,690.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_1016020.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid