Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 LAccepted-Finance | ₹7.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹8.8 L+₹1.3 L (17.6%)Accepted-Finance | ₹8.8 L+₹1.3 L (17.6%) | 2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | MOHAMMED FIROS K L1 | M T JEEVANANDAN L2 |
|---|---|---|---|---|---|
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 600 | sqm | 16.86 ₹10,117.28 Lowest | 19.83 ₹11,896.26 |
| 2.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 300 | sqm | 32.71 ₹9,814.15 Lowest | 38.47 ₹11,539.83 |
| 3.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 8 | each | 510.59 ₹4,084.73 Lowest | 600.37 ₹4,802.98 |
| 4.00 | 100.54.3.5:Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 39 | cum | 2,041.11 ₹79,603.48 Lowest | 2,400.02 ₹93,600.64 |
| 5.00 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | 140 | sqm | 51.82 ₹7,254.7 Lowest | 60.93 ₹8,530.34 |
| 6.00 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For vertical surface two coats @0.70 kg per sqm | 71 | sqm | 472.26 ₹33,530.47 Lowest | 555.3 ₹39,426.34 |
| 7.00 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For horizontal surface one coat @1.10 kg per sqm. | 70 | sqm | 362.15 ₹25,350.58 Lowest | 425.83 ₹29,808.12 |
| 8.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10 | cum | 238.82 ₹2,388.23 Lowest | 280.82 ₹2,808.17 |
| 9.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 10 | cum | 3,701.94 ₹37,019.37 Lowest | 4,352.87 ₹43,528.71 |
| 10.00 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 7.5 | cum | 5,940.24 ₹44,551.83 Lowest | 6,984.75 ₹52,385.65 |
Tender Value
₹8.1 L
EMD Value
₹20,127
Closing Date
17 Sept 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil) Engineering Department University of Calicut Calicut University P O Malappuram District Kerala 673635
Repair and Renovation of Existing Overhead Water Tank and Open Well at Dr. John Matthai Centre, Thrissur
2026_UoC_868597_1
D2/606/2026
Open Tender
Civil Works - Others
Item Rate
60 days
Dr.JOHN MATTHAI CENTER
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,095
Yes
₹20,127
Yes
23 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 600 | sqm | - | - |
| 2 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 300 | sqm | - | - |
| 3 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 8 | each | - | - |
| 4 | 100.54.3.5:Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 39 | cum | - | - |
| 5 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | 140 | sqm | - | - |
| 6 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For vertical surface two coats @0.70 kg per sqm | 71 | sqm | - | - |
| 7 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature for
waterproofing treatment to the RCC structures like retaining walls of the basement,
water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels
/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts
integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts
integral crystalline slurry : 1 part water) for horizontal surfaces and applying the
same from negative (internal) side with the help of synthetic fiber brush. The material
shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing
permeability of concrete by more than 90% compared with control concrete as per
DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline
slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work
shall be carried out all complete as per specification and the direction of the engineerin-
charge. The product performance shall carry guarantee for 10 years against any
leakage.For horizontal surface one coat @1.10 kg per sqm. | 70 | sqm | - | - |
| 8 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10 | cum | - | - |
| 9 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 10 | cum | - | - |
| 10 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 7.5 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1471114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DECLARATION.pdf
Additional Documents • 0.12 MB
epaymentform.pdf
Additional Documents • 0.01 MB
PreliminaryAgreementFormat.pdf
Additional Documents • 0.24 MB
TENDERDOCJMCWATERTANKREPAIR.pdf
Tender Documents • 1.53 MB
BOQ_1471114.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .