| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC | ₹22.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.9 L+₹3.2 L (13.9%)Rejected-Finance IDUKKI | KERALA | 685501 | ₹25.9 L+₹3.2 L (13.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹25.9 L+₹3.2 L (14.1%)Rejected-Finance | ₹25.9 L+₹3.2 L (14.1%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹64,800
Closing Date
28 Jan 2023, 4:00 pmClosed
Managing Director
Matsyafed Head Office, Kamaleswaram, Manacadu.P.O, Thiruvananthapuram
PMMSY-Construction of new ponds for Brackish water Aquaculture at Palaikkari Fish Farm
2023_MFED_550860_1
MFED/4134/2022-ENGG
Open Tender
Civil Works - Buildings
Item Rate
60 days
Palaikkari Fish Farm
Please refer Tender documents.
8 documents required · 8 mandatory
₹6,136
₹64,800
20 Jun 2023
19 Jan 2023
31 Jan 2023
19 Jan 2023
28 Jan 2023
19 Jan 2023
19 Jan 2023 - 28 Jan 2023
Amount
PART A a)POND 4 bund
od268218/2022_2023 : Supplying of bamboo pole (Kallanmula) size 4m length minimum dia of 8cm and above fixing 60cm c/c<br>including all cost of materials and labour etc. complete as directed by the officers of Matsyafed.
od268221/2022_2023 : Supply and fixing HDPE Plastic Sackbag (kari chakku)/velone net of width 2m torn and woven along the bund side including all cost of materials, labour etc. complete as directed by the officers of Matsyafed.
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.
PART A b) pond 4 bw sluice
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.
PART B POND 3 bund
od268218/2022_2023 : Supplying of bamboo pole (Kallanmula) size 4m length minimum dia of 8cm and above fixing 60cm c/c<br>including all cost of materials and labour etc. complete as directed by the officers of Matsyafed.
od268221/2022_2023 : Supply and fixing HDPE Plastic Sackbag (kari chakku)/velone net of width 2m torn and woven along the bund side including all cost of materials, labour etc. complete as directed by the officers of Matsyafed.
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.
PART B SLUICE
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.
PART C a)POND 1 BUND
od268217/2022_2023 : Construction of bund for the division of pond using clay excavated from center of inside the pond (using manual or dredging in uniform depth) and finishing bund sides with top width 2m bottom width 4m average height 2.3m and both sides fixing with coconut pole/bamboo pole 60cm c/c vertical post cross tying and half cut bamboo three line fixing for vertical bamboo post, coir, velone net / plastic woven sackbags/hdpesheet etc. complete excluding cost of bamboo pole, coir, velone net,sack,sheet including all cost and labour etc. complete as directed by the officers of Matsyafed.
od268218/2022_2023 : Supplying of bamboo pole (Kallanmula) size 4m length minimum dia of 8cm and above fixing 60cm c/c<br>including all cost of materials and labour etc. complete as directed by the officers of Matsyafed.
od268222/2022_2023 : Supplying and using good quality (tying) HDPE rope different dia including all cost of materials etc. complete.
od268221/2022_2023 : Supply and fixing HDPE Plastic Sackbag (kari chakku)/velone net of width 2m torn and woven along the bund side including all cost of materials, labour etc. complete as directed by the officers of Matsyafed.
Part C b)pond 1 sluice
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
od266794/2022_2023 : Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5 m : All kind of soil
od266795/2022_2023 : Conveying pre-cast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.
RAJEEV P P
Kadavil Constructions
Bidder Name
Kadavil Constructions
RAJEEV P P
ACCURATE INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807971.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .