Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹5.5 L (2.58%)Rejected-AOC | ₹2.2 Cr+₹5.5 L (2.58%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.3 Cr+₹11.1 L (5.18%)Rejected-AOC | ₹2.3 Cr+₹11.1 L (5.18%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | MOHAMMAD KOYA BAPU L3 | E.K.Abdulsalam L2 | ME SHUHAIB L1 |
|---|---|---|---|---|---|---|
| 1.00MP-LADS- Work Proposed by Hon,ble MP Dr.V.Sivadasan(Rajya Sabha) (Nodal DistrictKannur) Construction of New Seminar Complex at Govt.Victoria College,-Palakkad.-General | ||||||
| 1.01 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil | 405.02 | cum | 250 ₹1,01,256.25 | 250 ₹1,01,256.25 | 243.46 ₹98,607.39 Lowest |
| 1.02 | 56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring | 46 | Bore Holes | 3,000 ₹1,38,000 | 2,910 ₹1,33,860 | 2,835 ₹1,30,410 Lowest |
| 1.03 | 56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil | 624 | m | 920 ₹5,74,080 | 895 ₹5,58,480 | 872.24 ₹5,44,277.76 Lowest |
| 1.04 | 56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 156 | metre | 4,930 ₹7,69,080 | 4,792.77 ₹7,47,672.12 | 4,669.25 ₹7,28,403 Lowest |
| 1.05 | OD119958/2025-2026 Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap, to carry safe working load not less than specified,excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment
shall be measured from top of shoe to the bottom of pile cap) :500 mm dia piles | 780 | metre | 4,550 ₹35,49,000 | 4,424.25 ₹34,50,915 | 4,311.08 ₹33,62,642.4 Lowest |
| 1.06 | OD119967/2025-2026 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work upto plinth levelConcrete of M30 grade with minimum cement content of
350 kg /cum | 107.03 | cum | 11,450 ₹12,25,436.25 | 10,735 ₹11,48,913.38 | 10,458.4 ₹11,19,310.26 Lowest |
| 1.07 | OD119970/2025-2026 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum | 188.2 | cum | 13,650 ₹25,68,916.35 | 12,708 ₹23,91,632.89 | 12,381 ₹23,30,091.82 Lowest |
| 1.08 | 60.11.8 SHIFTING OF PLANT- from bore holes to bore holes by head load including labour etc. complete | 46 | each | 8,250 ₹3,79,500 | 8,051.25 ₹3,70,357.5 | 7,843.75 ₹3,60,812.5 Lowest |
| 1.09 | 20.6.2.2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity) | 4 | per test | 38,250 ₹1,53,000 | 37,105.93 ₹1,48,423.72 | 36,149.6 ₹1,44,598.4 Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹1 L
Closing Date
4 Oct 2025, 6:00 pmClosed
The Managing Director
Kerala SIDCO Limited Housing Board Building, 6th floor Santhi Nagar, Thiruvananthapuram - 695 001
e-tender for Construction of New Seminar Complex at Govt. Victoria College,-Palakkad.General
2025_SIDCO_796881_2
SIDCO/PROC/ CONS/VIC/2025-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
Palakkad
Please refer Tender documents.
10 documents required · 10 mandatory
₹8,850
₹1 L
20 Nov 2025
27 Sept 2025
6 Oct 2025
27 Sept 2025
4 Oct 2025
27 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .