| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | ₹21.2 L | L1 | Accepted-AOC DECIDED BY TENDER COMMITTEE |
| 2 | L2₹21.6 L+₹40,546.47 (1.91%)Rejected-Finance AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | ₹21.6 L+₹40,546.47 (1.91%) | L2 | Rejected-Finance DECIDED BY TENDER COMMITTEE |
| 3 | L2₹21.6 L+₹40,826.10 (1.92%)Rejected-Finance | ₹21.6 L+₹40,826.10 (1.92%) | L2 | Rejected-Finance DECIDED BY TENDER COMMITTEE |
| 4 | L2₹21.8 L+₹57,603.95 (2.71%)Rejected-Finance GADASAHI GADASAHI PURI 752017 | PURI | ODISHA | 752017 | ₹21.8 L+₹57,603.95 (2.71%) | L2 | Rejected-Finance DECIDED BY TENDER COMMITTEE |
| 5 | L2₹22.0 L+₹79,694.79 (3.75%)Rejected-Finance | ₹22.0 L+₹79,694.79 (3.75%) | L2 | Rejected-Finance DECIDED BY TENDER COMMITTEE |
Tender Value
₹28.0 L
EMD Value
₹27,964
Closing Date
17 Feb 2026, 5:00 pmClosed
EXECUTIVE OFFICER, PURI MUNICIPALITY
VIP ROAD
CIVIL
2026_ORULB_125283_21
PM 06/2025-26
Open Tender
Civil Works - Others
Percentage
120 days
PURI MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹27,964
Yes
4 Aug 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
17 Feb 2026
4 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge | 33.21 | Cum | 206.06 | ₹6,843.25 |
| 2 | Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. | 422.66 | Cum | 912.18 | ₹3,85,542 |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 7.38 | Cum | 6,528.9 | ₹48,183.28 |
| 4 | Providing P.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge. | 24.6 | Cum | 6,563.63 | ₹1,61,465.3 |
| 5 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. | 59.04 | Sqm | 250.28 | ₹14,776.53 |
| 6 | Providing laying, spreading and compacting graded stone aggregate to "WET MIX MACADAM" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works. | 242.24 | Cum | 3,787.9 | ₹9,17,580.9 |
| 7 | Providing and laying heavy duty factory made hydraulically pressed and mechanically compacted precasted interlocking tuf a stone brand pavers of 80mm thick size shape with 50mm sand bed and leveling and laying of interlocking paver block with sandbinding and final compacting with plate vibrator finishing for the surface. | 1,384.25 | Sqm | 608.4 | ₹8,42,177.7 |
| 8 | Collecting ,supplying at site dump manure from approved scourse within 5 km lead including carriage loading unloading etc | 62.7 | Cum | 560 | ₹35,112 |
| 9 | Providing & transplanting best quality healthy TREES packing the soil tight around the plant and water properly,including digging the tree pits (holes 1200 mm dia., 1200 mm deep) prior to planting and refilling the same with sweet earth mixed with manure 2 :1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per suppliers specifications, flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc, all complete, All trees to be approved before planting inclusive of maintenance as specified for one month after planting including rectification/ replacement of any damaged work or plant, watering at required frequency, providing and laying manure as required etc. all complete.
Fox Tail Palm | 8 | Nos | 1,500 | ₹12,000 |
| 10 | Sea Almond | 4 | Nos | 1,300 | ₹5,200 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_578900.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.86 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_578900.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .