Loading…
Loading…
62 live22 closing this weekmost from CE-BM,LMB Basin,BBSR and EIC-CIVIL
62 results • Latest
Slope Protection to Bhargovi right embankment from RD 29.800Km. to 30.060Km. near village Banamalipur)
Protection to Bhargovi right embankment from RD 54.400Km. to 55.900Km. (Working RD 55.100Km. to 55.300Km and from RD 58.600Km. to 58.700Km.)
Improvement to PMGSY Road to Arakhakuda Saline embankment connecting at RD 7.800Km. (From RD 1.560Km. to 3.100Km. Near village Champamani)
Improvement to Bhargovi left embankment from RD 42.00Km. to 42.700Km.
Improvement to road on Bhailipur right flood embankment from RD 3.350Km. to 4.350Km.
Improvement to Hundasamantarapur Saline Gherry from RD 1.00Km. to 1.470Km.
Improvement to Bedarpada Gherry Bundha from RD 00Km. to 1.200Km.
Protection to Bhargovi right embankment from RD 53.500Km. to 53.700Km. (Working RD 59.100Km. to 59.400Km)
Improvement to service road on Bhargovi right embankment from RD 20.00Km. to 21.00Km.
Improvement to service road on Bhargovi right embankment from RD 16.00Km. to 17.00Km.
Improvement to PMGSY Road to Arakhakuda Saline embankment connecting at RD 6.300Km. (From RD 00Km. to 1.350Km. Near village Sahajanpur)
Improvement to Bhargovi right embankment from RD 64.00Km. to 64.500Km.
Restoration to Mahisa-Berhampur Saline Gherry from RD 00Km. to 0.090Km. with construction of single vented sluice.
Improvement to Bhargovi right embankment from RD 65.500Km. to 66.00Km.
Renovation of service road on Dadaragada TRE from RD 1.500Km. to 2.580Km.
Construction of C.C. Road on left bank of Atharabhaga Minor from RD 3.00Km. to 3.700Km
Construction of Office Building for RWSS Section, GOP in Puri district.
Construction of Office Building for RWSS Section, KAKATPUR in Puri district.
Construction of Sluice at RD 0.350Km. of Bajrakota Saline Gherry.
Construction of Office Building for RWSS Section, NIMAPARA in Puri district.
Improvement to Bhargovi right embankment from RD 56.00Km. to 56.500Km. (Working RD 55.100Km. to 55.300Km. and from RD 58.700Km. to 59.100Km.)
Construction of Office Building for RWSS Sub-Division, DELANG in Puri district.
Construction of Office Building for RWSS Section, ASTARANG in Puri district.
Improvement to service road on Bhargovi right embankment from RD 15.00Km. to 16.00Km.
Improvement to road on Luna left embankment near village Nalibasanta with C.D.Structure
Restoration to Daya left embankment from RD 55.150Km. to 55.300Km. near village Basantapur (Working RD 55.150Km. to 55.365Km.)
Restoration to Daya left embankment from RD 55.00 km to 55.150 km near village Basantapur
Execution of Electrical Installation work to 11KV Line with 10 mtr PSC pole and 55 Sq. mm- AAA Covered Conductor -0.015KM,installation of 25 KVA PSC pole mounted DT,LT Line-0.37 Km for PWS to GOBARDHANPUR under PIPILI Block
Construction of bathing steps near village Jankia and Daya Vihar on Daya left embankment.
Repair to Twin Quarter of E Type Three Nos. F type Five Nos. and G type six Nos in Delta Colony at Puri under Puri Irrigation Division,Puri. (Qtr. No. E/1, E/3, E/4, E/6, E/7, E/8, F/3 to F/12, G/1 to G/4, G/7 to G/12)
Construction of Boundary wall at Nimapada Model Haat Nimapada .
Metal Storage Cabinet (Q2), Chair for General Purpose (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2), Revolving Chair (V5) (Q2) (3 (3 ))
Construction of Proposed E type Staff Qtr. with Principals Residence (at Ground floor) at Govt. ITI Krushnaprasad in the Dist of Puri Buildings.
Infrastructure development at CHC, Krushnprasad under AMA Hospital Building in the Dist. of Puri
Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Modular Table/Meeting Table/Centre Table (V2) (Q2), Executive Table (V4) (Q2), Modular Work Stations (V3) (Q2), Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2), Pin Up Notice Board (V2) (Q3)
Extension of both side of G.I. fabricated temporary shed from Badaakheda Matha to Ramadayaparisada for Construction of A.C Tunnel at Lord Jagannath Temple Puri for the year 2026-27
Providing arrangement for Short Stay of Habishyalis during the month of Kartika under Habishyali Kartika Brata 2026 (At Brundabati Nivas). Building
Apply of renewal coat from Ch 26/00 to 26/200 27/200 to 27/600 and clearing grubbing of road land from 20/00 to 43/561km on Pipili-Nimapada-Gop-Konark road for the year 2026-27
Providing arrangement for Short Stay of Habishyalis during the month of Kartika under Habishyali Kartika Brata 2026 (At Municipality Kalyan Mandap). Building
Providing arrangement for Short Stay of Habishyalis during the month of Kartika under Habishyali Kartika Brata 2026 (At Railway Tourist Complex). Building
Repair to Nimapada-Astaranga road from 21/00to30/738bush cutting and20/100to20/350,20/500to20/750,20/900to21/300,22/110to22/300,22/400 to22/520,22/650to22/780,22/780to22/900,23/200to23/310,29/400to29/500 BUSG BC repair in Patches for the year 2026-27
Temporary Illumination and hire charges of electrical arrangements such as fan light DG Set fire extinguisher PA system music system for cultural program etc for different places for Kartika Brata 2026. Building
Temporary Illumination and hire charges of electrical arrangements such as fan light DG Set fire extinguisher PA and music system for cultural program at Brundabati Nivas such as inauguration and closing ceremony for Kartika Brata 2026. Building
Repair to New Jagannath Sadak road from ch.0/00 to 0/035 (such as embankment rising), ch.4/00 to 5/00km (such as providing paver block layer in patches) and laying mastic over bridge areas for the year 2026-27
Repair to Pipili-Nimapada-Gop-Konark road from 10/100 to 10/240, 10/550 to 10/800,11/900 to 12/180,12/950 to 12/980 and 13/700 to 13/900km patch and pothole repair and 8/00 to 14/00km bush cutting for the year 2026-27
S/R to Road from Batagaon Chhak to Medical square for the year 2026-27 Such as Restoration of damaged B.T. Portion of Road Due to heavy Rainfall in patches from ch.0/520kmto0/570km3/280kmto3/330kminLHS and0/530kmto0/800km and1/000Kmto1/195KmRHS
Repair to Nimapada-Astaranga road from 0/00km to 21/00km bush cutting, 18/200 to 20/050km BUSG BC Patches repair and road marking with thermoplastic compound from 0/00 to 30/738km only on rumbles and Humps for the year 2026-27