| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance 1 JOHNSON LIFTS PRIVATE LIMITED EAST MAIN ROAD ANNA NAGAR WEST EXTENSION 44 CHENNAI TAMIL NADU 600101 | CHENNAI | TAMIL NADU | 600101 | ₹1.7 Cr | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹2.0 CrRejected-Finance 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | ₹2.0 Cr | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹2.9 CrRejected-Finance 5TH FLOOR DP 9 P T I BLDG SALT LAKE SALT LAKE KOLKATA WEST BENGAL 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | ₹2.9 Cr | L3 | Rejected-Finance L3 BIDDER |
| Sl No | Description | Qty | Unit | OMEGA ELEVATORS L2 | Johnson Lifts Pvt Ltd L1 | KONE ELEVATOR INDIA PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.4 metre (approx.) vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required.
Near ITB staff gate | 1 | Job | 34,00,000 ₹34 L | 26,10,169.49 ₹26.1 L | 48,29,435 ₹48.3 L |
| 2.00 | Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.3 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required.
Near AOCC -Domestic SHA | 1 | Job | 34,00,000 ₹34 L | 28,22,881.36 ₹28.2 L | 48,29,435 ₹48.3 L |
| 3.00 | Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.3 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required.
Domestic Arrival | 1 | Job | 30,50,000 ₹30.5 L | 28,40,677 ₹28.4 L | 48,29,435 ₹48.3 L |
| 4.00 | Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 4.45 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required.
Domestic Check in hall | 1 | Job | 30,50,000 ₹30.5 L | 30,10,169.49 ₹30.1 L | 48,29,435 ₹48.3 L |
| 5.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
First year 5 % CMC cost on SITC Portion of Item No.1 | 1 | Job | 1,70,000 ₹1.7 L | 1,30,508 ₹1.3 L | 2,41,472 ₹2.4 L |
| 6.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
Second year ( Yearly 6 % cumulative enhancement on first year cost ) | 1 | Job | 1,80,200 ₹1.8 L | 1,38,338 ₹1.4 L | 2,55,960 ₹2.6 L |
| 7.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
Third year (Yearly 6 % cumulative enhancement on Second year cost ) | 1 | Job | 1,91,012 ₹1.9 L | 1,46,638 ₹1.5 L | 2,71,318 ₹2.7 L |
| 8.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
Fourth year (Yearly 7 % cumulative enhancement onThird year cost ) | 1 | Job | 2,04,383 ₹2.0 L | 1,56,903 ₹1.6 L | 2,90,310 ₹2.9 L |
| 9.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
Fifth year (Yearly 7 % cumulative enhancement on fourth year cost ) | 1 | Job | 2,18,690 ₹2.2 L | 1,67,886 ₹1.7 L | 3,10,632 ₹3.1 L |
| 10.00 | All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year)
DLP =Two year from the actual date of completion of contract
Near ITB staff gate
Sixth year (Yearly 10 % cumulative enhancement on fifth year cost ) | 1 | Job | 2,40,559 ₹2.4 L | 1,84,675 ₹1.8 L | 3,41,695 ₹3.4 L |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹3.9 L
Closing Date
24 Mar 2026, 11:00 amClosed
SM Engg_Ele
SMEE CALICUT AIRPORT
Replacement of existing four numbers Escalators at Terminal Building in Calicut International Airport
2026_AAI_268066_1
AAI/CL/EE/291/NIT-11/2025-26
Open Tender
Electrical Works
270 days
Calicut Airport
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
₹3.9 L
30 May 2026
23 Feb 2026
25 Mar 2026
24 Feb 2026
24 Mar 2026
24 Feb 2026
24 Feb 2026 - 3 Mar 2026
Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.4 metre (approx.) vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required. Near ITB staff gate
Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.3 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required. Near AOCC -Domestic SHA
Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 5.3 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required. Domestic Arrival
Design, Supply,fabrication, installation, testing & commissioning of monolithic step reversible type escalator (including overseas freight & landing charges etc) after dismantling and removal of existing escalator, disconnecting electrical supply and shifting to AAI store. The escalator shall be with an inclination of 35 deg from horizontal for ascending and descending passenger service from ground floor to first floor having 4.45 (approx.) metre vertical height and with three horizontal steps on top and down sides and step width of 1.0 mtr. and having side glass wall, all safety devices and bottom shall be covered with stainless steel (1 mm thick) for indoor installation suitable for the existing pit size and other dimensional requirement as mentioned in the Technical specification of tender document. The escalator shall have a capacity of 9000 persons/hour at a linear speed of 0.5 M/Sec. operating on 3 phase, 415 volts, 50 Hz AC supply. The escalator unit shall be compatible with BMS protocols. Necessary communication card/ hardware/software shall be provided for this by the manufacturer with all accessories complete as required. Domestic Check in hall
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate First year 5 % CMC cost on SITC Portion of Item No.1
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Second year ( Yearly 6 % cumulative enhancement on first year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Third year (Yearly 6 % cumulative enhancement on Second year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Fourth year (Yearly 7 % cumulative enhancement onThird year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Fifth year (Yearly 7 % cumulative enhancement on fourth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Sixth year (Yearly 10 % cumulative enhancement on fifth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Seventh year (Yearly 10 % cumulative enhancement on sixth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near ITB staff gate Eighth year (Yearly 10 % cumulative enhancement on seventh year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA First year 5% CMC cost on SITC Portion of Item No.2
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Second year ( Yearly 6 % cumulative enhancement on first year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Third year (Yearly 6 % cumulative enhancement on Second year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Fourth year (Yearly 7 % cumulative enhancement on Third year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Fifth year (Yearly 7 % cumulative enhancement on fourth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Sixth year (Yearly 10 % cumulative enhancement on fifth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Seventh year (Yearly 10 % cumulative enhancement on sixth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Near AOCC -Domestic SHA Eighth year (Yearly 10 % cumulative enhancement on seventh year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival First year 5% CMC cost on SITC Portion of Item No.3
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Second year ( Yearly 6 % cumulative enhancement on first year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Third year (Yearly 6 % cumulative enhancement on Second year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Fourth year (Yearly 7% cumulative enhancement on Third year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Fifth year (Yearly 7 % cumulative enhancement on fourth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Sixth year (Yearly 10 % cumulative enhancement on fifth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Seventh year (Yearly 10 % cumulative enhancement on sixth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Arrival Eighth year (Yearly 10 % cumulative enhancement on seventh year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall First year 5 % CMC cost on SITC Portion of Item No.4
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Second year ( Yearly 6 % cumulative enhancement on first year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Third year (Yearly 6% cumulative enhancement on Second year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Fourth year (Yearly 7% cumulative enhancement on Third year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Fifth year (Yearly 7 % cumulative enhancement on fourth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Sixth year (Yearly 10 % cumulative enhancement on fifth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Seventh year (Yearly 10 % cumulative enhancement on sixth year cost )
All Inclusive Comprehensive maintenance contract of escalator including all electrical & mechanical equipments, safety control systems installed under this contract including supply of spares and carrying preventive maintenance as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract.(1 Job / annum = CMC of 1 escalator for 1 year) DLP =Two year from the actual date of completion of contract Domestic Check in hall Eighth year (Yearly 10 % cumulative enhancement on seventh year cost )
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
tenderdocument.pdf
Tender Documents • 6.80 MB
BOQ_312081.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid