Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹15.1 L (11.5%)Admitted-Finance | ₹1.5 Cr+₹15.1 L (11.5%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S HARI SHAM CONTRACTOR L2 | CHAMEL SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth , 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil. | 2,754 | M3 | 150 ₹4,13,100 Lowest | 170 ₹4,68,180 |
| 2.00 | Handpacking of stones into B.A. wire crates excluding cost stones and crates. | 5,967 | M3 | 337 ₹20,10,879 | 330 ₹19,69,110 Lowest |
| 3.00 | Supply of boulder Nallah nominal size 225MM (Stack measurment reduced by 15%) | 5,071.95 | M3 | 400 ₹20,28,780 | 395 ₹20,03,420.25 Lowest |
| 4.00 | Carriage of stones avg 50Km by MT and 100M by HL. | 5,071.95 | M3 | 978 ₹49,60,367.1 | 900 ₹45,64,755 Lowest |
| 5.00 | Cost of Gabion crates of size 6x1.5x1.5 = 442 Nos | 442 | Nos | 12,000 ₹53,04,000 | 9,500 ₹41,99,000 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
25 Oct 2022, 4:00 pmClosed
Executive Engineer Flood Control Division
Samba
Construction of protection work by way of activation of old creek and construction of crated structure in River Basantar near village Kamour activation of creek near Ballargate spot I and spot II, Right side of River Basantar
2022_IFC_192844_1
Fresh e-NIT No. 16 of 10-2022
Open Tender
Civil Works
Item Rate
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer Flood Control Division
₹3.0 L
Executive Engineer Flood Control Division
28 Oct 2022
18 Oct 2022
27 Oct 2022
18 Oct 2022
25 Oct 2022
18 Oct 2022
20 Oct 2022
Amount
Earthwork in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth , 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil.
Handpacking of stones into B.A. wire crates excluding cost stones and crates.
Supply of boulder Nallah nominal size 225MM (Stack measurment reduced by 15%)
Carriage of stones avg 50Km by MT and 100M by HL.
Cost of Gabion crates of size 6x1.5x1.5 = 442 Nos
M/S HARI SHAM CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_505425.xls
BOQ • 0.23 MB
SBD.pdf
Additional Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .