Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC LOWEST RATE |
| 2 | L2₹5.3 L+₹2.2 L (68.4%)Rejected-Finance | ₹5.3 L+₹2.2 L (68.4%) | L2 | Rejected-Finance HIGHER THAN L1 PARTY |
| 3 | L3₹6.0 L+₹2.8 L (88.8%)Rejected-Finance | ₹6.0 L+₹2.8 L (88.8%) | L3 | Rejected-Finance HIGHER THAN L1, L2 PARTIES |
| 4 | L4₹7.2 L+₹4.1 L (128.7%)Rejected-Finance | ₹7.2 L+₹4.1 L (128.7%) | L4 | Rejected-Finance HIGHER THAN L1, L2 AND L3 PARTIES |
Tender Value
Refer Docs
EMD Value
₹17,500
Closing Date
24 Aug 2022, 2:00 pmClosed
AGMMT
TCC LTD UDYOGAMANDAL ELOOR ALUVA ERNAKULAM
Demolition old plant II liquefaction plant
2022_TCCL_502714_1
TCCL/WC/C/870/2022
Open Tender
Civil Works - Others
Item Rate
45 days
THE TRAVANCORE COCHIN CHEMICALS LTD
Please refer Tender documents.
6 documents required · 6 mandatory
₹160
Yes
₹17,500
Yes
14 Jan 2023
10 Aug 2022
25 Aug 2022
10 Aug 2022
24 Aug 2022
10 Aug 2022
Amount
Dismantling A.C. sheets, M.S. roof structures, wooden members, jally work, brick masonry, A.R. Tile work, demolishing reinforced cement concrete etc., at all elevations and locations described above from existing ground level, providing all safety precautions to workers, machinery, materials etc., erecting required support and covering work and screen to arrest spreading of dust form smooth and safe demolition under safety work permit, machine cutting of reinforced cement concrete slab ofthickness upto 30cm with incorporated cross beams of all section sizes at all elevations and locations for separating existing building from demolition front on safety point of view, making good the cut portion, collecting, loading conveying and unloading masonry and concrete debris free of scrap items to eastern salvage yard or at places pointed out by engineer-in-charge and levelling debris, stacking useful items within factory compound (if masonry and concrete debris are not taken out from factory area as per item No. 2 as decided by TCC), handing over items not mentioned above to TCC at no extra cost, taking out retrieved M.S. Scrap on weighment of record after clearing resulted. Clearing the site and levelling the area, including all labour charges, ESI, PF, KCWWF contributions and all other levies, hire for tools, trucks, scaffolding, all safety support and covering, PPE's, cordoning the location, all taxes payable etc., complete
Masonry brick work including jally
RCC work
A.C. sheet
M.S. structural
Collecting and taking out scrap materials retrieved out of demolition such as steel reinforcement rods, M.S. structurals etc., weighing at company weigh bridge, including sorting items and loading to lorries and taking out, after remitting agreed rates in advance, including all lablur charges for collecting, loading, weighing etc., all other incidentals. Quote Rate per Unit of items to be remitted to Company. (GST is chargeable @18% above the quoted rate)
M.S. Reinforcement rods old
M.S. structurals of various sizes & shapes
Debris such as concrete wastes and masonry wastes
ANAZ IBRAHIM
PALLASSERY EARTH WORKS
JAS ANTONY
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .