| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.4 LAccepted-AOC 1 1 A VANSATTART ROW 3RD FLOOR ROOM NO 2A | L1 | Accepted-AOC STANDS LOWEST | |
| 2 | L2₹39.8 L+₹36,075.20 (0.91%)Rejected-Finance 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance HIGHER THAN L1 | |
| 3 | L3₹40.2 L+₹75,633.60 (1.92%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | L3 | Rejected-Finance HIGHER THAN L1 |
Tender Value
₹39.5 L
EMD Value
₹81,500
Closing Date
17 Aug 2022, 2:00 pmClosed
Executive Engineer, NMD, PHE DTE.
Office of the Executive Engineer, Northern Mechanical Division Public Health Engineering Directorate Sukanta Sarani, Paresh Nagar, Sevoke Road, Siliguri - 734001, District- Jalpaiguri
Production of packaged drinking water from R.O. based fully automatic drinking water bottling plant with an hourly production capacity 3600 bottles of 1000 ml , 500 ml at Fulbari WTP Complex, Fulbari Hat in the district of Jalpaiguri , under Norther
2022_PHED_392224_1
WBPHED/EE/NMD/NIeT- 12 OF 2022-2023
Open Tender
MECHANICAL
Item Rate
365 days
FULBARI, SILIGURI
Please refer Tender documents.
4 documents required · 4 mandatory
₹81,500
Yes
30 Aug 2022
29 Jul 2022
22 Aug 2022
2 Aug 2022
17 Aug 2022
2 Aug 2022
Amount
PART - A (Labour Portion)
Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000 ml/500 ml at Fulbari Bottling Plant in the District of Jalpaiguri, West bengal by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing, filling, capping machine (1 No.), labelling machine & batch code machine (1 No.), shrink wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automation system (1 No.) per shift . The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant. (w.e.f. 01/09/2022 to 31/08/2023)
Provision of Electrician visit to oversee the overall power circuit and electrical accessories and machineries. (w.e.f. 01/09/2022 to 31/08/2023)
PART - B (Supervision Portion)
Skilled supervisor for supervision of entire installation for trouble free operation including manning, control, output data generation etc. (w.e.f. 01/09/2022 to 31/08/2023)
Sweeping of garbage from bins of different area inside the plant, collecting from roads, intermediate path way, back side of the plant , cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, rooms to ensure highest level of hygenic condition inside the plant, cleaning of all grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc. as per direction of EIC.for 12 months. (w.e.f. 01/09/2022 to 31/08/2023)
Part-C (Daily/Weekly/Monthly Maintenance)
Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc. to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade ( RFC & labelling machine ), FRL- 32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area (4 times in month). PET Blowing, RFC, Labelling, Batch coding & Shrink Wrapping Machine( 4 times in a month) and HP compressor with Dryer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc ( 4 times in a month) and pouch filling machines (4 times in amonth).Raw materials to be kept properly in good condition and Deployment of skilled technician of work force to undertake routine daily /weekly / monthly periodical machine wise maintenance work strictly adhering to the maintenance guidilines of the manufacturer including other routine (daily / weekly /monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Deparmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 12 months w.e.f. 01/09/2022 to 31/08/2023.
Static Portion:- WTP areas (Dual Media, UF, RO, Ozonator etc.)
Motive Portion:- PET blowing machine, RFC, Labeling machine, shrink wrapping machine
HP compressor with dryer, LP compressor with dryer, chiller tower, CW pump etc. including leakage test of entire pneumatic, conveying main including calibration of gauges.
Miscellaneous Charges:- Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment / topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. (w.e.f. 01/09/2022 to 31/08/2023)
Making arrangement for preventive maintenance by manufacturer / parent company of a)PET Blowing Machine b) RFC Machine c) Labelling Machine d) Batch Coding Machine e) High pressure Compressor with Dryer f) Low pressure Compressor with Dryer g) Chiller h) Cooling Tower i) Shrink Wrapping machine j) Water Treatment Plant by deploying Service Enginner of the parent manufacturing company as per preventive maintenance schedule with all incidental charges for setting and resetting of different critical process related field instruments alongwith replacement of spares of this plant . A seperate register for attaining monthly preventive maintenace by the parent manufacturing company is to be kept at site duly authenticated by the concerned Engineer-In -charge and should be submitted during preparation of bill w.e.f. 01/09/2022 to 31/08/2023.
Deployment of Service Engineer of the parent company with all conveynance for setting, re-setting and calibration of the equipment upto the level of standard
Rinsing Filling cleaning machine (involving of 2 days)
Labeling machine (involving of 2 days)
PET blowing machine (involving of 2 days)
High Pressure compressor (involving of 2 days)
Low Pressure compressor (involving of 2 days)
Chiller (involving of 1 day)
Cooling tower (involving of 1 day)
Shrink Wrap Machine (involving of 2 day)
Water Treatment plant (involving of 2 days)
Batch code machine (involving of 2 day)
Add GST Amount @12% (CGST @6% + SGST @6%)
ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd.
CONCORD ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .