Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.2 L+₹4.1 L (20.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹26.6 L+₹6.6 L (32.9%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹28.3 L+₹8.2 L (41.1%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ARVIND KUMAR L2 | M/s KASHI TRADERS AND CONSTRUCTION L1 | DEV BHOOMI TRADERS L4 | Bhagwati Enterprises L3 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Dormitory for Ladies Instructors at Tekhla | |||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting outthe excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil. | 22.65 | cum | 250 ₹5,662.13 | 192 ₹4,348.51 Lowest | 380 ₹8,606.43 | 345.65 ₹7,828.45 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 22.87 | cum | 150 ₹3,429.76 Lowest | 211 ₹4,824.52 | 280 ₹6,402.21 | 219.5 ₹5,018.88 |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 1.8 | cum | 2,892.97 ₹5,208.73 | 2,293 ₹4,128.5 Lowest | 2,892 ₹5,206.99 | 2,659.5 ₹4,788.38 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement:3 coarse sand (zone-ll) derived from natural sources : 6 graded stone aggregate 40 mm nominal
size derived from natural sources) | 6.4 | cum | 9,000 ₹57,623.13 | 7,753 ₹49,639.13 Lowest | 9,778 ₹62,604.33 | 9,449.35 ₹60,500.12 |
| 1.05 | Random rubble masonry with hard stone in foundation and plinth including
levelling up withcement concrete 1:6:12 (1 cement: 6 coarse sand: 12
graded stone aggregate 20 mm nominal size) upto plinth level with: Cement mortar 1:6 (1 cement:6 coarse sand) | 8.44 | cum | 8,500 ₹71,776.13 | 6,500 ₹54,887.63 Lowest | 9,959 ₹84,096.29 | 9,650.35 ₹81,489.97 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement:1.5 coarse sand (zone-||1) derived from natural sources:3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.93 | cum | 12,500 ₹61,568.74 | 8,000 ₹39,403.99 Lowest | 12,322 ₹60,692 | 11,985.65 ₹59,035.31 |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars | 579.98 | Kg | 145 ₹84,096.74 | 90 ₹52,197.98 Lowest | 145 ₹84,096.74 | 139.5 ₹80,906.86 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass
concrete | 14.63 | sqm | 534 ₹7,812.42 | 450 ₹6,583.5 Lowest | 534 ₹7,812.42 | 534.19 ₹7,815.2 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal
of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 10.42 | sqm | 1,300 ₹13,550.68 | 1,076 ₹11,215.79 Lowest | 1,309 ₹13,644.49 | 1,300.5 ₹13,555.89 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Principal NIM
NIM Admin Office Nehru Institute of Mountaineering, Uttarkashi
Construction of Dormitory for Ladies Instructors at Tekhla Rock Climbing Area, Nehru Institute of Mountaineering
2026_NIM_101762_1
NIM/Tender/2026-27/015
Open Tender
Civil Works
Item Rate
75 days
Tekhla Rock Climbing Area Uttarkashi
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Principal NIM Uttarkashi
₹50,000
27 Nov 2026
30 Oct 2026
12 Nov 2026
30 Oct 2026
11 Nov 2026
30 Oct 2026
45 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Dormitory for Ladies Instructors at Tekhla | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting outthe excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil. | 22.65 | cum | - | - |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 22.87 | cum | - | - |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 1.8 | cum | - | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement:3 coarse sand (zone-ll) derived from natural sources : 6 graded stone aggregate 40 mm nominal
size derived from natural sources) | 6.4 | cum | - | - |
| 1.05 | Random rubble masonry with hard stone in foundation and plinth including
levelling up withcement concrete 1:6:12 (1 cement: 6 coarse sand: 12
graded stone aggregate 20 mm nominal size) upto plinth level with: Cement mortar 1:6 (1 cement:6 coarse sand) | 8.44 | cum | - | - |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement:1.5 coarse sand (zone-||1) derived from natural sources:3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.93 | cum | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars | 579.98 | Kg | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass
concrete | 14.63 | sqm | - | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal
of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 10.42 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
TenderDocumentDormitory.pdf
Tender Documents • 3.39 MB
BOQ_119888.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .