DEPUTY CONSERVATOR OF FOREST KOTA
DEPUTY CONSERVATOR OF FOREST KOTA
CONSTRUCTION OF MAIN GATE IN NAGAR VAN, DADDEVI
2026_FORES_591658_15
DCF KOTA NITNO53-2026-27
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 E GRASS CHALLAN AS PER NIT
₹15,702
Yes
30 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
30 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance including cutting of grasses
bushes for bunding, key lines|
vegetative fencing and other such works | 25 | sqm | 4.55 | ₹113.75 |
| 2 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful
material if available : Ordinary rock, and circular radius of 1.5m x 1m x 1m | - | cum | 268 | - |
| 3 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix, Buttress support pillers foundation | - | cum | 4,934 | - |
| 4 | Making of drilling holes(width up to 150mmm in RCC/Slab/wall/Beam by power drilling by machine complete as per direction of EI, Grouting for stabalizing and fixing Piller's foundation. | 18 | per nos | 176 | ₹3,168 |
| 5 | Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering.
M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone | 1 | cum | 5,451 | ₹5,445.55 |
| 6 | TMT bar used for reinforcement of pillers, footing grouting, and subsidiary reinforcements etc.TMT bar used are 16mm,12mm, 10mm, and 8 mm | - | kg | 80 | - |
| 7 | Plaster on new surface on walls incement sandmortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick. Roof ,pillar, seating banchase base periphery | 24.61 | sqm | 227 | ₹5,586.47 |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of form work for foundation , footings, strap beam, raft , bases of columns etc. Columns, pillars, posts and struts etc. | 1 | sqm | 375 | ₹374.63 |
| 9 | Skilled Mason (for ornamental works) 1st class 5labour x 22 Day , Ornamental works in main gate including hand carving on all the structures during plastering process and CC pasting process, tree like structure, and other nature alike articles (Mushrooms and supporting branches). | - | Man days | 1,000 | - |
| 10 | Steel Chiken wire mesh | - | SQM | 40 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.98 MB
BOQ_1050629.xls
BOQ • 0.25 MB
53DATECORRIGENDUM.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].