Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 L+₹9,382.06 (2.37%)Admitted-Finance HIMACHAL PRADESH HP | HAMIRPUR | HIMACHAL PRADESH | 177301 | ₹4.0 L+₹9,382.06 (2.37%) | L2 | Admitted-Finance |
| 3 | L3₹4.1 L+₹17,418.95 (4.41%)Admitted-Finance HIMACHAL PRADESH | ₹4.1 L+₹17,418.95 (4.41%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE KALNGEHAR P O SUDHAR TEHSIL PADHAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Aaditya Raj Singh Chandel L2 | SHYAM CHAND L1 | RAM SINGH L3 |
|---|---|---|---|---|---|---|
| 1.01 | Excavation in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in Pick-Jumper work. | 13.08 | Cum | 412 ₹5,388.96 | 410 ₹5,362.8 Lowest | 420 ₹5,493.6 |
| 2.00Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in. | ||||||
| 2.01 | Foundation and Plinth. | 2.91 | Cum | 10,050 ₹29,245.5 | 10,000 ₹29,100 Lowest | 10,100 ₹29,391 |
| 3.00Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | ||||||
| 3.01 | i) Foundation footings bases of columns and the like and mass concrete. | 3.02 | Cum | 14,100 ₹42,582 | 14,000 ₹42,280 Lowest | 14,200 ₹42,884 |
| 3.02 | ii) Walls (any thickness but not less than 0.1m) including attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level) | 5.94 | Cum | 14,300 ₹84,942 | 14,200 ₹84,348 Lowest | 14,400 ₹85,536 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | ||||||
| 4.01 | i) Flat surfaces such as soffits of suspended floors, roofs, landings & the like. (Floors upto 200mm th.) | 8.56 | Sqm | 750 ₹6,420 | 700 ₹5,992 Lowest | 760 ₹6,505.6 |
| 4.02 | ii) Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like. | 62.64 | Sqm | 760 ₹47,606.4 | 750 ₹46,980 Lowest | 770 ₹48,232.8 |
| 5.00Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | ||||||
Tender Value
₹3.5 L
EMD Value
₹7,030
Closing Date
15 Apr 2026, 5:00 pmClosed
Executive Engineer JS Division Padhar
Executive Engineer JS Division Padhar
CO RCC Storage Tank 20000Ltr. Cap. For village Baralang in GP Sudhar Under BASP.
2026_HPIPH_133836_1
471-520 dated 09.04.2026
Open Tender
Civil Works
Item Rate
90 days
Padhar
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Executive Engineer JS Division Padhar
₹7,030
Yes
18 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in Pick-Jumper work. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in. | - | - | - | - |
| - | Foundation and Plinth. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | - | - | - | - |
| - | i) Foundation footings bases of columns and the like and mass concrete. | - | Cum | - | - |
| - | ii) Walls (any thickness but not less than 0.1m) including attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level) | - | Cum | - | - |
| - | Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | - | - | - | - |
| - | i) Flat surfaces such as soffits of suspended floors, roofs, landings & the like. (Floors upto 200mm th.) | - | Sqm | - | - |
| - | ii) Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like. | - | Sqm | - | - |
| - | Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | - | - | - | - |
stage.html
html • 0.03 MB
technical_197843.pdf
techsummary_197843.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
02Form6.pdf
Tender Documents • 0.19 MB
BOQ_197843.xls
BOQ • 0.29 MB
03Form8.pdf
Tender Documents • 1.37 MB
conditions.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .